Pytes E-Box 48100R Solar Storage System Installation Guide
- June 3, 2024
- Pytes
Table of Contents
Pytes E-Box 48100R Solar Storage System
Connect Power Cable & Ground Cable
Warning: Ensure that the battery power switch is off
Note: Each battery should be connected to a Bus Bar when installing multiple batteries.
Connect Communication Cable
Note: Select CAN or RS485 port based on the communication type of inverter
Note: Please connect the master battery and the inverter.
Note: Ensure the pin order of communication cable is correct.
Set the DIP Switch
Note: Set the DIP switch based on the inverter you installed.
Start up the System
Note: Make sure the connection to the inverter is correct before starting the battery.