evolution Rubber Playground Installation Wetpour Installation Guide

June 30, 2024
Evolution

evolution-logo

evolution Rubber Playground Installation Wetpour

evolution-Rubber-Playground-Installation-Wetpour-
product

Specifications:

  • Ratio of Rubber Crumb to Resin: 20%
  • Base Layer Recommendation: Concrete, Stone, or MOT Type one (100mm)
  • Rubber Crumb Size: 2-6mm
  • Coverage Depth: 50mm for rubber surface, 40mm for EPDM base layer, and 10mm for EPDM wear surface
  • Curing Time: 4-6 hours for rubber and resin, 24 hours for full cure

Product Usage Instructions

Installing Rubber Crumb Surface:

  1. Prepare the base layer with existing Concrete, Stone, or MOT Type one (100mm).
  2. Install edging to contain the material.
  3. Place a weed membrane.
  4. Fill with 100-150mm of type 1 MOT and compact using a Vibrating whacker plate.
  5. Mix the rubber crumb and resin in a forced action pan mixer.
  6. Weigh the rubber and calculate 20% of the weight for resin.
  7. Mix rubber and resin until evenly coated.
  8. Pour the mix into a wheelbarrow lined with plastic sheet.
  9. Trowel the mix to a 50mm depth on the prepared base, lubricating the trowel to prevent sticking.
  10. Allow to cure for 4-6 hours.

Installing Coloured EPDM Kits:

  1. Follow the steps above for the base layer installation.
  2. Lay the 2-6mm Rubber crumb base layer at a depth of 40mm.
  3. Ensure a level surface before applying the top 10mm EPDM coloured wear surface.
  4. Apply EPDM and resin mix in 1m deep strips using edging guides.
  5. Level the material with a lubricated straight edge and finish with a trowel for smoothness.
  6. Cure for 4-6 hours, allowing the surface to fully cure for 24 hours before use.

Rubber Crumb should be mixed at a ratio of 20% Resin to Rubber Crumb.

Example : 25KG bag of rubber mixed with 5KG of Resin.

Surface Preparation:

  • The mixed Rubber and Resin compound should be laid onto a suitable base such as existing Concrete, Stone or MOT Type one (100MM Base layer advisable).
  • This can then be trowelled out and tampered down to create a smooth finish.

Note : Trowel Lubricant should be used to make the process easier and reduce rubber sticking to the Trowel.

For 50mm Deep rubber surface:

  • Dig down 150mm – 200mm depending on the strength of base required & make sure the surface has been compacted using a Vibrating whacker plate.
  • Install your edging choice of edging, this will hold the material inside.
  • Install the Weed membrane.
  • Fill with 100-150mm of type 1 MOT and compact using a Vibrating whacker plate.
  • Using a forced action pan mixer (preferably) or other type of mixer pour the 2-6mm rubber crumb into the mixer so it can operate without spilling any crumb and leave some room for the additional resin.
  • Empty the mixer into a container and weigh the rubber. Multiply the weight in Kgs by 0.20 , this will give you the weight of Resin needed to add to the mix.
  • Put the weighed rubber back into the mixer and start rotating, then add the Resin at the weight you have just calculated. (20%) – for example a 25 Kg bag will require 5 kgs of resin.
  • Allow the rubber and resin to mix for several minutes (2-3) or until evenly coated with resin.
  • Line a wheel barrow with some Plastic sheet and tape or tie it around the outside.
  • Once fully mixed, pour the contents of the mixer into the Wheel barrow and take it to the area you are working on.
  • Starting from the corner furthest away from you and making sure you wont get backed into a corner pour the rubber & resin mix out and begin trowelling the rubber to the 50mm depth required ensuring you keep lubricating your trowell as you go to avoid the rubber sticking to the trowell .
  • The mixed Rubber and Resin compound should be laid onto a suitable base such as existing Concrete, Stone or MOT Type one (100MM Base layer advisable).
  • This can then be trowelled out and tampered down to create a smooth finish.

Note: Trowel Lubricant should be used to make the process easier and reduce rubber sticking to the Trowel.

ECO Kids Rubber Playground DIY Kit

evolution-Rubber-Playground-Installation-Wetpour-fig-
\(1\)

Colored EPDM DIY Kits
For the coloured EPDM kits follow the instructions above for the base first:

  • First, install the 2-6mm Rubber crumb as the rubber base layer at a depth of 40mm, ensure the surface is level and has no high or low points.
  • Once the base has dried you can start laying the top 10mm EPDM coloured wear surface.
  • Using 10mm deep edging guides you should start applying the EPDM and resin mix in 1M deep strips, this way you can have a 10mm guide on all sides and use a lubricated straight edge to level the material before finishing with a trowel to ensure a smooth finish.
  • Keep working in 1M deep strips until the area has been fully covered making sure there are no visible seems. All rubber and resin should cure in around 4-6 Hours; Allow the surface to fully cure for 24 hours before using.

FAQ

Q: Can I use a different type of mixer for mixing the rubber crumb and resin?
A: While a forced action pan mixer is preferred, you can use other types of mixers as long as they can handle the material without spilling.

Q: How long should I wait before using the surface after installation?
A: The rubber and resin should cure in around 4-6 hours, but it is recommended to allow a full 24 hours for complete curing before use.