D-D The Aquarium Solution OTM-ARM-M Mounting 2 x AI Blade LED Lights Installation Guide
- June 26, 2024
- D-D The Aquarium Solution
Table of Contents
- Use to
- OTM-ARM-M Set includes
- (Hybrid) Mounting 2 x AI Blade LED lights on D-D
- Suspending 2 x AI Blade LED Lights using AIWIRE05 and Blade Clips
- MounƟng Hydra 64 or 52 on the OTM RAIL or Ecotech RMS Rail
- Suspending 3 x AI Blade LED Lights using AIWIRE05 and Blade Clips
- MounƟng 3 x AI Blade LED Lights on the OTM RAIL with Blade Clips
- Read User Manual Online (PDF format)
- Download This Manual (PDF format)
D-D The Aquarium Solution OTM-ARM-M Mounting 2 x AI Blade LED Lights
OTM-ARM-M INSTALATION INSTRUCTIONS
Use to
- Mount 2 x AI Hydra 52/64 LED lights to the D-D OTM Rail or Radion RMS Rail.
- Mount 2 or 3 x AI Blade LED lights on the D-D OTM Rail. Requires AI Blade clips (not supplied).
- Suspend 2 or 3 x AI Blade LED lights on the D-D Wire Kit (AIWIRE05). Requires AI Blade clips (not supplied).
- Hybrid mount 2 x AI Blade LED lights alongside AI Hydra 26/32/52/64 LED Lights on the D-D OTM Rail. Requires AI Blade clips (not supplied).
OTM-ARM-M Set includes
2 x 270mm Shaped Metal Arms
4 x 8mm Black Hole Caps
2 x M5x12mm Black CSK Screw
2 x M5x16mm Black CSK Screw
4 x Hydra Heatsink Screw
2 x M5x20mm Flange Head Screw
2 x M5 Nylon Washer
2 x M5 Washer
2 x M5 Nyloc Nut
2 x M5 Low Profile Square Nut
(Hybrid) Mounting 2 x AI Blade LED lights on D-D
OTM RAIL or RMS Rail Using Blade Clips
Please note: AI Blade LED lights are mounted to the OTM or RMS rail independently of the Hydra / Radion lights when hybrid mounting.
AI Hydra lights (H32/H64 latest version) will use the OTM-ARM-S included with the OTM RAIL set and Radion lights will need to be mounted to the RMS rail with the relevant X Slide Bracket.
Suspending 2 x AI Blade LED Lights using AIWIRE05 and Blade Clips
Hole caps must be installed when suspending the OTM-ARM to stop the hanging wire from coming free.
The hole caps are a tight fit, submerging them in warm, not hot, water for a minute can help with installation.
MounƟng Hydra 64 or 52 on the OTM RAIL or Ecotech RMS Rail
Suspending 3 x AI Blade LED Lights using AIWIRE05 and Blade Clips
Hole caps must be installed when suspending the OTM-ARM to stop the hanging wire from coming free.
The hole caps are a tight fit, submerging them in warm, not hot, water for a minute can help with installation.