REQUIRED TOOLS:
TAPE MEASURE
SOCKET & WRENCH SIZES:
• 9/16 IN
• 3/4 IN
• 1 3/16 IN
PARTS BAG
STEP 1
- With the base plate (16) bottom side up, secure the isolators (9) to the four foots of the base plate using 48178- 000 (20) and 16248-001 (4). The nut will install at the bottom of the isolator.
- Flip the base over.
Note: You may also install casters in lieu of the isolators. The hole size is 11/16” diam.
STEP 2
- Install the left and right side panels (13)(14). The panel cradle will sit under the base. Use 441-000 (18) and 526-000 (21) from the outside and secure with a 526-000 (21) and 47136-000 (19) on the inside. See pictures.
NOTE: The four holes are the front of the TPH250.
STEP 3
- The draw pin bracket (15) installs on the bottom of the side panels, behind the panel cradle. Use 441-000 (18) and 526-000 (21) on the outside and secure with 526-000 (21) and 47136-000 (19).
NOTE: The flat part of the bracket is the bottom.
-
The draw pin (6) comes with the washer and nut attached. Remove the nut and washer and install into the bracket holes of the draw pin bracket (15).
-
Insert a lynch pin (8) to the draw pin.
STEP 4
- The top cross member (11) installs on the top of the side panels, behind the panel cradle. Use 441-000 (18) and 526-000 (21) on the outside and secure with 526-000 (21) and 47136-000 (19).
NOTE: The three holes of the top cross member should be two on bottom and one on top when installing.
-
Install the top link bracket (12) to the top cross member (11) using 91658- 001 (25), 526-000 (21), and 56854- 000 (22).
-
Install the top link pin (7) through the bracket. Secure with a lynch pin (8).