istore 180L-1 Pre Lay Plumbing and Electrical Heat Pumps Installation Guide

June 24, 2024
iStore

istore 180L-1 Pre Lay Plumbing and Electrical Heat Pumps

istore 180L-1 Pre Lay Plumbing and Electrical Heat
Pumps

Dimension

Left side install Unit: mm

Pre-Lay Plumbing and Electrical

Builder > completes all pre-lay plumbing and electrical works

Plumber > to run hot & cold lines to location of iStore tank.

Electrician > to run new 15A (2.5mm) circuit from electrical meter box to tank location. AC. Isolator shall be installed &  under no circumstances shall the unit be energized on until tank is filled with water.

All valves supplied

iStore – Installation Diagrams – Nov 2017Logo

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals