iStore Pre-Lay Plumbing and Electrical Installation Guide
- March 16, 2024
- iStore
Table of Contents
iStore Pre-Lay Plumbing and Electrical
PRODUCT DIMENSION
Left side install
Unit: mm
Builder > completes all pre-lay plumbing and electrical works
Plumber > to run hot & cold lines to location of is tore tank.
Electrician > run new 15A (2.5mm) circuit from electrical meter box to tank
location. AC. Isolator shall be installed & under no circumstances shall the
unit be energized on until tank is filled with water.
All valves supplied