Azuresw B0CBV26DHS Insulated Food Delivery Bag Instruction Manual

June 24, 2024
Azuresw

Insulated Bag
Installation Instruction

B0CBV26DHS Insulated Food Delivery Bag

Note: Small insulated bags do not have C dividers, medium and large have dividers, all other installation steps are as follows.

Parts List

| | | | | | |
---|---|---|---|---|---|---|---
Insulated bag| Bottom load-bearing plate| Partitions| Mitten| Fiberglass support tube (elder)| Fiberglass support tube
(shortness)| Fiberglass connection tube| Tee Connector

Installation Steps

  1. Wear gloves when installing to avoid being stung by the fiberglass tubing.
  2. Assemble the stand according to the corresponding numbered parts.
  3. Install the assembled bracket and base plate inside the insulation bag.
  4. Put in the spacer, then Velcro the fiberglass holder tightly and the whole assembly is complete.

If the above illustration doesn’t know how to install it, watch the product installation video at the Amazon product link.

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals