FoxESS EP 5 HV Battery Installation Guide
- June 15, 2024
- FoxESS
Table of Contents
FoxESS EP 5 HV Battery
Specifications
- Tools Required: 6mm Magnetic Phillips Screwdriver, Crimpers, Safety Shoes, Safety Gloves, Safety Glasses, Rubber Mallet, Marker, 8mm External Hexagonal Socket, Cable Ties, Hammer Drill @8mm, Spirit Level, Mulmeter (Vdc>500)
- Packing List:
- M5*10 Screwsx2
- Handle, Valves, Ground Terminal, LINK OUT, PCS COM, BMS Status LED, BMS SOC LED, DC+, DC-, Power Switch, Battery Bracket
Installation Prerequisites
- Installation Angle Requirements: The battery can be installed on the floor or wall. Do not install the battery in a forward tilt, backward tilt, lateral tilt, horizontal position, or upside-down position.
- Installation Space Requirements: Ensure no heating devices or flammable materials around the battery. Provide sufficient space for heat dissipation and safety isolation.
Installation Steps
- Wiring Steps:
- Stand-alone mode:
- Insert the 2 parallel plugs (H2) into the LINK IN and LINK OUT ports respectively.
- Wall mounting:
- Insert M5*10 screws (F2) into the holes on the left and right sides of the mounting bracket then tighten the screws.
- Bracket Installation:
- Place the bracket against the wall, adjust hole positions with a level and mark the positions of the holes.
- Drill holes with a hammer drill (8mm) and tighten the expansion bolts.
- Fix the bracket to the wall with specified screws.
Tools Required
The following tools will be required to install the battery
Packing List
Please check if the following items are included with the package:
Product Appearance
Installation Prerequisites
Installation Angle Requirements
The battery can be installed on the floor or on the wall. The installation
angle requirements are as follows:
Do not install the battery in a forward tilt, backward tilt, lateral tilt,
horizontal position, or upside-down position.
Installation Location Requirements
- The location should be far from the seaside to avoid salt spray and high humidity, with a distance of over 1000m.
- The location should be free from flammable or explosive materials, with a minimum height of 0.9m.
- The environment at the location should be cool, away from high temperatures and direct sunlight.
- There should be minimal dust and dirt at the location.
- The location should be free from corrosive gases, including ammonia and acidic vapors.
- The building should be of solid brick and concrete structure for installation on walls or floors. If other types of walls and floors are used, they must be madeof flame-retardant materials and meet the load requirements of battery.
Installation space requirements:
During the installation steps, ensure that there are no other heating device
or flammable materials around the battery. Sufficient space for heat
dissipation and safety isolation should be provided.
Installation Steps
-
STEP-1:
The steps for installing the bracket is as follows: -
Place the bracket against the wall, adjust the hole position with a level (K1) , and mark the positions of the 4 holes.
-
Remove the bracket, drill the holes with a hammer drill (φ8mm, depth range 45-50mm), and tighten the expansion bolts to ensure that the bracket is securelyinstalled.
-
Fix the bracket to the wall with ST6*40 screws (E2) , ensuring that the bracket is installed in a horizontal position
-
STEP-2:
The steps for installing the battery on the wall is as follows: -
Align the buckle of the battery bracket with the holes of mounting bracket on the wall, then place the battery from top to bottom.
-
Observe the left and right sides of the bracket to ensure that the holes of the battery bracket and mounting bracket on the wall are aligned.
-
STEP-3:
Insert 2 pcs of M5*10 screws (F2) into the holes on the left and right sides of the mounting bracket then tighten the screws.
Wiring Steps
Stand-alone mode
-
STEP-1:
Insert the 2 parallel plugs (H2) into the LINK IN and LINK OUT ports respectively -
STEP-2:
Connect the inverter cables:
Note: The power cable (K2) must be pulled straight from the battery DC+/- for more than 80mm before bending.
- Connect the ground cable (J2) to the ground.
- Connect the PCS communication cable (I2) to the BMS port on the inverter
- Remove the waterproof bridge from DC+ and DC-, then insert the power cable (K2) into DC+ and DC-.
Parallel mode:
-
STEP-1:
Connect the parallel cables: The steps for parallel connection of batteries is as follows: -
Insert the parallel plug (H2) into the LINK IN port, this battery is defined as the Master battery (whichever battery can be set as the Master).
-
Connect the ground cable (J2) from the ground terminal of the Master battery (left side of the battery) to the ground terminal of the next battery (right side of the battery), and continue the same connection until the ground terminal of the last battery (left side of the battery).
-
Use the communication cable(I2) to cross-connect the LINK OUT of the previous battery with the LINK IN of the next battery. Start from the LINK OUT of the Master and continue until reaching the LINK IN port of the last battery.
-
Insert the parallel plug (H2) into the LINK OUT port of the last connected battery.
* **Note 1:** The steps of inserting the parallel plug (H2) are as follows:
* **Note 2:** The steps of installing the parallel communication cable are as follows:
-
STEP-2:
Connect the inverter cables: Note: Keep a distance of 300-600mm from the battery to the junction box. The power cable(K2) must be pulled straight from the battery DC+/- for more than 80mm before bending. -
Connect the ground cable (J2) of the Master battery to the ground.
-
Connect the PCS communication cable (I2) of the Master battery to the BMS communication port of the inverter.
-
Connect the power cable (K2) of each battery to the junction box (need to purchase separately). Connect the output power cable of the junction box to the battery port of the inverter.
System Start-Up
Rotate the “DC Switch” of each battery to the “ON” position, then press and hold the “Power Switch” on the Master battery for about 3 seconds, and then release the switch. Each battery LED will light up and flash, indicating that the battery is powered on.
Note
In special cases, such as when the grid and solar panels are not in use, the
battery can be activated through the “Black Start” function. That means that
our energy storage inverter and battery can continue to operate. The startup
steps for a black start are as follows:
- Press the “Power Switch” on the Master battery for 1-3 seconds (cannot be longer than 5 seconds), then release the switch to activate the Black Start function.
- When at least one battery’s LED turns green and remains steady, and the LED of the other batteries does not turn red, it indicates that the batteries have entered a normal running state.
Please scan the QR Code and follow the steps below to download our latest multi-language User Manual/Quick Installation Guide:
- Scan the QR Code → Select your Language → Choose to download
- User Manual or Quick Installation Guide → Download
Note : Different models of batteries cannot be mixed in one system, For any further questions related to the battery versions please contact our technical team at service@fox-ess.com.
FAQ
Q: What are the tools required for battery installation?
A: Tools required include a 6mm Magnetic Phillips Screwdriver,
Crimpers, Safety Shoes, Safety Gloves, Safety Glasses, Rubber Mallet, Marker,
8mm External Hexagonal Socket, Cable Ties, Hammer Drill @8mm, Spirit Level,
and Mulmeter (Vdc>500).
Q: Can the battery be installed in any orientation?
A: No, do not install the battery in a forward tilt, backward tilt,
lateral tilt, horizontal position, or upside-down position.
Q: What are the installation space requirements for the
battery? **A:** Ensure there are no heating devices or flammable materials
around the battery. Provide sufficient space for heat dissipation and safety
isolation.