Zoeller Deep Well Installation Manual
- June 8, 2024
- Zoeller
Table of Contents
Installation Manual
Zoeller Deep Well
Zoeller® is a registered trademark of Zoeller Co. All Rights Reserved.
SEE INSTRUCTION MANUAL FOR IMPORTANT SAFETY WARNINGS.
CONVERTIBLE EJECTOR INCLUDED
Installs in 4 in. diameter well casing for deep wells (25 – 70 ft.)
REPLACE EJECTOR WHEN REPLACING PUMP.
1. INSTALLATION
Deep Well Application
2. CHANGE VOLTAGE
This pump is wired for 230V.
To change pump voltage, see pump label diagram or instructions below.
A. Using a pair of needle nose pliers, pull the gray wire with the female flag connector from the “B” terminal spade post. Place it to the left on the “A” terminal spade post.
B. Pull the red wire with the female flag connector from the “B” terminal. Place it to the right on the “L2” terminal spade post.
3. PUMP PRIMING & STARTUP – DEEP WELL
CAUTION: All pumps must be primed (filling the cavity with water) before they are first operated. This may take several gallons of water, as the suction line will be filled in addition to the pump cavity.
C. The flow control valve allows you to adjust the balance between pump body pressure and household pressure. Install a pressure gauge on the pump body and a second gauge in the discharge line. Follow the steps below to maximize pressure to your home while making sure you maintain a minimum of 46 PSI at the pump while the pump is running.
D. Tighten flow control screw completely by turning clockwise, then loosen two turns. Now start the pump.
E. With pump operating at high pressure, open two or more faucets and slowly unscrew the flow control screw until maximum flow is obtained. The pressure gauge should read 46 PSI, which the minimum operating pressure of the pump.
NOTE: Flow control is not required for shallow well applications.
4. TROUBLESHOOTING
A. Make certain that the power source matches the pump requirements. This pump has a dual voltage motor and can run on 115 V or 230 V. This pump is pre- wired at the factory to run on 230 V.
B. If pump does not run, check the GFCI or breaker panel switch to make it is in full operation.
C. If the pump runs all the time, make sure the pump has been primed correctly. If pump is not holding the prime, inspect check valve, foot valve, and piping, then reprime.
D. If the pump runs but won’t shut off, check pressure switch.
QUICK START GUIDE for SHALLOW WELL INSTALLATION (0-25 FT.)
SEE INSTRUCTION MANUAL FOR IMPORTANT SAFETY WARNINGS.
1.INSTALLATION
Shallow Well Application
CONVERTIBLE EJECTOR INCLUDED
REPLACE EJECTOR WHEN REPLACING PUMP
2. CHANGE VOLTAGE
This pump is wired for 230V.
To change pump voltage, see pump label diagram or instructions below.
To change from 230 V TO 115 V
A. Using a pair of needle nose pliers, pull the gray wire with the female flag connector from the “B” terminal spade post. Place it to the left on the “A” terminal spade post.
B. Pull the red wire with the female flag connector from the “B” terminal. Place it to the right on the “L2” terminal spade post.
3. PUMP PRIMING & STARTUP – SHALLOW WELL INSTALLATION
CAUTION: All pumps must be primed (filling the cavity with water) before they are first operated. This may take several gallons of water, as the suction line will be filled in addition to the pump cavity.
A. Remove the priming plug with pressure gauge and air relief plug.
B. Slowly fill pump cavity until water comes out of air relief hole on top of the pump.
C. Replace air relief plug and continue adding water to pump cavity until water reaches the top of the priming plug.
4. TROUBLESHOOTING
A. Make certain that the power source matches the pump requirements. This pump has a dual voltage motor and can run on 115 V or 230 V. This pump is pre-wired at the factory to run on 230 V.
B. If pump does not run, check the GFCI or breaker panel switch to make it is in full operation.
C. If the pump runs all the time, make sure the pump has been primed correctly. If pump is not holding the prime, inspect check valve, foot valve, and piping, then reprime.
D. If the pump runs but won’t shut off, check pressure switch.
Questions? Call 1-800-584-8089 BEFORE Returning Product
Read More About This Manual & Download PDF:
Zoeller Deep Well Installation Manual – Optimized PDF
Zoeller Deep Well Installation Manual – Original PDF
Questions about your Manual? Post in the comments!
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>