Shaw FLOORS SH-450925 Residential Resilient Direct Glue Instruction Manual
- June 4, 2024
- Shaw Floors
Table of Contents
Shaw FLOORS SH-450925 Residential Resilient Direct Glue
INSTALLATION
INSTALLATION GUIDELINES FOR RESIDENTIAL RESILIENT DIRECT GLUE
TEST BEFORE STARTING INSTALLATION
Note: All substrates to receive moisture-sensitive |oor covering must be tested for moisture.
CONCRETE SUBSTRATES
All concrete substrates should be tested for IRH (Internal Relative Humidity)
according to ASTM F 2170.
Calcium Chloride tests may be conducted in addition to IRH and must be
performed per the latest edition of ASTM F 1869.
NEW AND EXISTING CONCRETE SUBFLOORS SHOULD MEET THE GUIDELINES OF THE LATEST
EDITION OF ACI 302 AND ASTM F 710, “STANDARD PRACTICE FOR PREPARING CONCRETE
FLOORS TO RECEIVE RESILIENT FLOORING” AVAILABLE FROM THE AMERICAN SOCIETY FOR
TESTING AND MATERIALS, 100 BARR HARBOR DRIVE, WEST CONSHOHOCKEN, PA
19428; 610‐832‐9585; HTTP://WWW.ASTM.ORG
Substrates shall be smooth, structurally sound, permanently dry, clean and
free of all foreign material such as dust, wax, solvents, paint, grease, oils,
old
adhesive residue, curing and hardening/ curing compounds, sealers and other
foreign material that might prevent adhesive bond.
If the adhesive residue is asphalt‐based (cut‐back), or any other type of
adhesive is present, it must be removed by industry-accepted methods such as
mechanical removal or wet scraping.
If a chemical abatement has been performed, use Shaw Surface Prep EXT to
remove any residual chemicals present. Once Shaw Surface Prep EXT has been
properly cleaned and removed, apply one coat of Shaw MRP for additional
protection.
Adhesive removal through the use of solvents or citrus adhesive removers is
not recommended. Solvent residue left in or on the sub|oor may affect the new
adhesive and |oor covering.
WARNING! DO NOT SAND, DRY SWEEP, DRY SCRAPE, DRILL, SAW, BEAD BLAST OR MECHANICALLY CHIP OR PULVERISE EXISTING RESILIENT FLOORING, BACKING, LINING FELT , ASPHALTIC “ CUT BACK” ADHESIVES OR OTHER ADHESIVES.
These products may contain either asbestos {bers and/or crystalline silica. Avoid creating dust. Inhalation of such dust is a cancer and respiratory tract hazard. Smoking by individuals exposed to asbestos {bers greatly increases the risk of serious bodily harm. Unless positively certain that the product is a non‐asbestos‐containing material, you must presume it contains asbestos. Regulations may require that the material be tested to determine asbestos content and may govern the removal and disposal of material. See current edition of the Resilient Floor Covering Institute (RFCI) publication Recommended Work Practices for Removal of Resilient Floor Coverings for detailed information and instructions on removing all resilient covering structures. For current information go to www.rfci.com.
-
Concrete |oors shall be |at and smooth within 1/8″ in 6 feet or 3/16” in 10 feet.
-
F‐Number System: Overall values of FF 36/ FL 20 may be appropriate for resilient |oor coverings.
-
Moisture Vapor Emission Rate (MVER) – Conduct either in‐situ RH test (ASTM F‐2170) or CaCl MVER test method (ASTM F1869) Refer to the adhesive
information for the acceptable moisture limits. -
Use cementitious patching and leveling compounds that meet or exceed Shaw’s maximum moisture level and pH requirements. Use of gypsum‐based patching and/or leveling compounds which contain Portland or high alumina cement and meet or exceed the compressive strength of 3,000 psi are acceptable.
-
Perform Bond testing to determine compatibility of adhesive to the substrate. Shaw 9050 primer can be utilized to promote adhesion.
-
Porosity – water drop test will help determine porosity – if drop remains on the surface after 1‐2 mins concrete should be considered non‐porous.
-
Working and open times of adhesives may vary based on job conditions, substrate, temperature, and humidity.
-
Areas to receive |ooring should be adequately lighted during all phases of the installation process.
-
It is recommended that resilient |oor covering installation shall not begin until all other trades have completed.
TEMPERATURE ‐ AMBIENT
Controlled environments are critical. Fully functional HVAC systems are the best way to ensure temperature and humidity control.
- DO NOT install resilient |ooring products until the work area can be temperature controlled.
- The permanent HVAC system turned on and set to a minimum of 65°F (18.3°C) or a maximum of 85°F, for a minimum of 7 days prior to, during, and after installation. Once the installation is complete the temperature should not exceed 85°F (29.4°C).
PH
Concrete |oors must be tested per the latest edition of ASTM F 710.
PH reading must not exceed 10.0.
Readings below 7.0 and in excess of 10.0 affect resilient |ooring and
adhesives negatively.
Rinsing the surface with clear water may lower alkalinity. “DAMP MOP”Shaw 9050
an acrylic solution can be utilized to correct high PH readings.
NOTE: IT MAY NOT BE THE FLOOR COVERING INSTALLER’S RESPONSIBILITY TO CONDUCT THESE TESTS. IT IS, HOWEVER,THE FLOOR COVERING INSTALLER’S RESPONSIBILITY TO MAKE SURE THESE TESTS HAVE BEEN CONDUCTED, AND THAT THE RESULTS ARE ACCEPTABLE PRIOR TO INSTALLING THE FLOOR COVERING. WHEN MOISTURE TESTS ARE CONDUCTED, IT INDICATES THE CONDITIONS ONLY AT THE TIME OF THE TEST.
MATERIAL STORAGE AND HANDLING
a. Flooring material and adhesive must be acclimated to the installation
area for a minimum of 48 hours prior to installation.
b. Store cartons of tile or plank products |at and squarely on top of one
another. Tile or plank products should be stacked no more than 6 high and
allow for air |ow around stacks when un‐palletized. Preferably, locate
material in the “center” of the installation area (i.e. away from vents,
direct sunlight, etc.)
Storing cartons in direct sunlight may affect proper acclimation by inducing
thermal expansion/contraction.
c. When palletizing on a jobsite vinyl plank or tiles need to be stacked
2 rows high side by side with no airspace between. Then quarter turned for 2
rows side by side, not to exceed 12 boxes high. A 5/8” or thicker plywood must
also be placed on the pallet {rst.
d. Do not stack pallet’s 2 high unless utilizing a 1” thick plywood in
between pallets.
SUBSTRATES
Note: All substrates to receive resilient |ooring shall be dry, clean,
smooth and structurally sound. They shall be free of dust, solvent, paint,
wax, oil, grease, residual adhesive, adhesive removers, curing, sealing,
hardening/parting compounds,alkaline salts, excessive carbonation/laitance,
mold, mildew, and other foreign materials that might prevent the adhesive from
bonding.
Crumb rubber underlayments are not an acceptable option for use with resilient
|oor coverings due to performance issues resulting from chemical
incompatibilities.
WOOD SUBSTRATES
Wood sub|oors must be structurally sound and in compliance with local building
codes.
a. Double‐Layered APA rated plywood sub|oors should be a minimum 1″ total
thickness, with at least 18″ well ventilated air space beneath.
b. Chip board, OSB, particleboard, construction grade plywood are
generally not acceptable substrates – add a layer of APA underlayment grade
ply wood that is dimensionally stable, non‐staining, with a smooth fully
sanded face.
c. Underlayment panels can onlycorrect minor de{ciencies in the sub‐|oor
while providing a smooth,sound surface on which to adhere the resilient
|ooring. Wood sub|oors should be |at – 3/16” in 10’ or 1/8” in 6’.
d. Insulate and protect crawl spaces with a vapor barrier covering the
ground.
e. DO NOT install over sleeper construction sub|oors or wood sub|oors
applied directly over concrete.
f. Underlayment panels can only correct minor de{ciencies in the sub‐|oor
while providing a smooth, sound surface on which to adhere the resilient
|ooring.
g. Any failures in the performance of the underlayment panel rest with
the panel manufacturer and not with Shaw Industries, Inc.
h. It is recommended that your chosen APA underlayment grade panels be
designed for installation under resilient |ooring, and carry a written
warranty covering replacement of the entire |ooring system.
i. SHAW resilient |ooring is not recommended directly over {re‐retardant
treated plywood or preservative treated plywood.
j. The materials used to treat the plywood may cause problems with
adhesive bonding. An additional layer of APA rated 1/4″ thick underlayment
should be installed.
k. Always follow the underlayment manufacturer’s installation
instructions.
STRIP – PLANK WOOD FLOORING
Due to expansion/contraction of individual boards during seasonal changes, SHAW recommends 1/4″ or thicker APA-rated underlayment panels be installed over these types of sub|oors.
CONCRETE
New or existing concrete sub|oors must meet the guidelines of the latest
edition of ACI 302 and ASTM F 710, “Standard
Practice for Preparing Concrete Floors to Receive Resilient Flooring”.
- On or below‐grade slabs must have an effective vapor retarder directly under the slab.
- Wet curing 7 days is the preferred method for curing new concrete.
- Curing compounds (DO NOT USE). If present they can interfere with the bond of the adhesive to the concrete. Seek assistance from a substrate manufacturer if curing agents are detected.
- Remove curing compounds 28 days after placement, so concrete can begin drying.
- Concrete |oors shall be |at and smooth within 1/8″ in 6 feet or 3/16” in 10 feet.
- F‐Number System: Overall values of FF 36/ FL 20 may be appropriate for resilient |oor coverings.
Note:
Perform Bond testing to determine compatibility of adhesive to the substrate.
Shaw 9050 primer can be utilized to promote adhesion. Expansion joints in
concrete are designed to allow for the expansion and contraction of the
concrete.
Resilient |ooring products should never be installed over expansion joints.
Expansion joint covers designed for use with resilient |oorings should be
used. Control joints (saw cuts) may be patched and covered with resilient once
the concrete is thoroughly cured, dry and acclimated.
LIGHTWEIGHT CONCRETE
All recommendations and guarantees as to the suitability and performance of lightweight concrete under resilient |ooring are the responsibility of the lightweight concrete manufacturer. The installer of the lightweight product may be required to be authorized or certi{ed by the manufacturer. Correct on‐site mixing ratios and properly functioning pumping equipment are critical. To ensure proper mixture, slump testing is recommended.
a. Lightweight aggregate concretes having densities greater than 90 lbs.
per cubic foot may be acceptable under resilient |ooring.
b. Concrete slabs with heavy static and/or dynamic loads should be
designed with higher strengths and densities to support such loads.
c. Surface must be permanently dry, clean, and smooth, free of all dust,
and structurally sound.
d. Perform Bond testing to determine compatibility of adhesive to the
substrate. Shaw 9050 primer can be utilized to promote adhesion.
Radiant Heating: Radiant-heated sub|oor systems can be concrete, wood or a
combination of both.
The heating systems components must have a minimum of 1/2″ separation from the
|ooring product. The system must be on and operational for at least 2 weeks
prior to installation to reduce residual moisture. Three days prior to
installation lower the temperature to 65 degrees (18.3°C), after installation
gradually increase the temperature in increments of 5° F to avoid overheating.
Maximum operating temperature should never exceed 85°F( 29.4). Use of an
in-|oor temperature sensor is recommended to avoid overheating. Contact the
manufacturer of your radiant heating system for further recommendations.
Electric Radiant Floors: consist of electric cables (or) mats of electrically conductive materials mounted on the sub|oor below the |oor covering. Mesh systems are typically embedded in thin-set. When embedding the system components, use cementitious patching and leveling compounds that meet or exceed Shaw’s maximum moisture level and pH requirements. Use of gypsum-based patching and/or leveling compounds which contain Portland or high alumina cement and meet or exceed the compressive strength of 3,000 psi are acceptable.
Hydronic Radiant Floors: pump heated water from a boiler through tubing laid in a pattern under the |ooring. Typically installed in channels under a wooden sub|oor (or) imbedded in concrete slabs. Requires the installer follow a speci{c nailing pattern to avoid penetration of the heat system.
RESILIENT FLOOR COVERING
- Must be single layered, non‐cushion backed, fully adhered, and smooth.
- Show no signs of moisture or alkalinity.
- Waxes, polishes, grease, grime, and oil must be removed.
- Cuts, cracks, gouges, dents and other irregularities in the existing |oor covering must be repaired or replaced.
- Embossing leveler recommended to aid in proper bonding and to prevent telegraphing.
- Do not install over rubber based substrates.
NOTE: THE RESPONSIBILITY OF DETERMINING IF THE EXISTING FLOORING IS SUITABLE TO BE INSTALLED OVER TOP OF WITH RESILIENT, RESTS SOLELY WITH INSTALLER/FLOORING CONTRACTOR ON SITE. IF THERE IS ANY DOUBT AS TO SUITABILITY, THE EXISTING FLOORING SHOULD BE REMOVED, OR AN ACCEPTABLE UNDERLAYMENT INSTALLED OVER IT. INSTALLATIONS OVER EXISTING RESILIENT FLOORING MAY BE MORE SUSCEPTIBLE TO INDENTATION.
Quarry Tile, Terrazzo, Ceramic Tile, Poured Floors (Epoxy, Polymeric,
Seamless)
a. Must be totally cured and well bonded to the concrete.
b. Must be free of any residual solvents and petroleum derivatives.
c. Waxes, polishes, grease, grime, and oil must be removed.
d. Show no signs of moisture or alkalinity.
e. Cuts, cracks, gouges, dents, and other irregularities in the existing
|oor covering must be repaired or replaced.
f. Fill any low spots, holes, chips and seams that may telegraph through
the new |ooring.
b Grind any highly polished or irregular/smooth surfaces. Quarry tile or
Ceramic tile grout joints and textured surfaces must be {lled with an
embossing leveler or substrate manufacturer-approved material.
SHAW ADHESIVES & PRIMER
Refer to adhesive label for proper trowel requirements, spread rates and
application.
Prior to application of adhesive determine if the substrate is a porous or
non‐porous substrate. Follow instructions on the adhesive label for porous or
non‐porous sub|oor.
Adhesives: Shaw 200, Quick|ash, S150, InstaGrab (Floorte™ Pro Product with
attached EVA pad requires the use of T-180 adhesive)
IMPORTANT: Recommended to perform a bond test in order to determine
adhesive working time per job site conditions.
The strength of the bond test will indicate whether Shaw 9050 |oor primer is
necessary.
INSTALLING RESILIENT TILE & PLANK PRODUCTS & FLOORTE™ PRO PRODUCTS
General
a. Ensure that moisture tests have been conducted and that the results do
not exceed the acceptable moisture limit for the adhesive used.
b. PH of concrete sub‐|oor needs to be between 5&10.
c. The permanent HVAC system is turned on and set to a minimum of 65°F
(18.3°C) ) or a maximum of 85°F (29.4°C), for a minimum of 72 hours prior to,
during and after installation. After the installations, the maximum
temperature should not exceed 85°F.
d. Do not stack more than 5 cartons high.
e. Flooring material and adhesive must be acclimated to the installation
area for a minimum of 48 hours prior to installation.
f. Use appropriate trowel size regarding substrate porosity
g. Material should always be visually inspected prior to installation.
Any material installed with visual defects will not be considered a legitimate
claim as it pertains to labor cost.
h. Install tiles running in same direction.
i. Ensure that all recommendations for sub‐|oor and jobsite conditions
are met prior to beginning the installation. Directional designs are
optional,however, once the installation is started, you have accepted those
conditions.
j. Floorte™ Pro Product with attached EVA pad – These products require
the use of Shaw T‐180 adhesive only. Use of non‐approved adhesives may result
in adhesive failure.
LAYOUT AND INSTALLATION GENERAL RULES
a. Shaw tile and plank ‐ Install using conventional tile and plank
installation
b. Carefully determine where to begin tile or plank installation.
c. It is customary to center rooms and hallways so borders are not less
than half a tile or plank.
d. Working out of multiple boxes at a time is recommended.
e. In hallways and small spaces, it may be simpler to work lengthwise
from one end using a center reference line as a guide.
f. Make sure cut edges are always against the wall.
g. To properly cut LVT/LVP products score the top side of the material
with a utility knife. Bend the product and {nish the cut through the backside.
This will ensure the cleanest cut. It may be necessary to use a heat gun to
cut around vertical obstructions. Allow the heated LVT/LVP to return to room
temperature before installation.
h. Cutting the product into a {ne point may lead to delamination. Use an
ethyl cyanoacrylate-based super glue to help fuse the LVT/LVP point together.
Be sure to clean all glue from the top surface immediately. Alcohol-based
super glues may cause vinyl to swell.
i. For random width plank begin installation with the widest plank {rst.
NOTE: Recommended to use |oor protection after installation. DO NOT use a plastic adhesive-based protection system.
INSTALLATION FOR TILE
Layout of the Room for Squarely Laid Fields
To square the area to be covered, {rst {nd the center of one end of the main
rectangle. Locate the same point at the other end wall. Snap a chalk line
between these points to mark the center line on the |oor. Then measure along
this center line to {and the middle of the room. At the center point, mark off
a line across the room at exactly right angles to the {rst line. This may be
accomplished by the 3‐4‐5‐ triangle method as shown in Figure 1. Then measure
4 feet toward each side wall from the center point. Then measure 3 feet from
the center point along the longer line, measure exactly 5 feet from the 3-foot
mark on the center line to the 4-foot mark on the cross line. If the 5-foot
measurements do not come out exactly 5 feet, the center crossing lines are not
at a true right angle. For large rooms, multiples of the above dimensions may
be used to obtain greater accuracy. (6‐8‐10 or 9‐12‐15, etc.)
Dry‐lay a row of tiles from the center line to the side wall to determine the space left for the borders. If the resulting border is too small, move the starting point over a half tile width so that it straddles the center line. Repeat the same procedure lengthwise of the room. (This can readily be {gured out from the room dimensions without putting down the tiles if desired.)
If it is decided to have the center row of tiles straddle either or both of the center lines, additional guidelines should be snapped on the |oor ½ tiles width on one side of either or both center lines as required. (See Figure 2) After the border, widths have been determined and the center starting lines have been snapped spread the recommended adhesive on the center lines leaving portions of the lines at the center and near each wall uncovered as shown in Figure 3.
Spread the adhesive over one‐half the area and after it is ready, start laying tile from the right angle formed in the center of the room by center lines. Lay toward the two corners of the room as shown. Always refer to your guidelines as you progress with laying tile so that any mistake can be corrected before it is too late. Sometimes it’s necessary to compromise on the rightness of joints to make allowances for unevenness or waves of the sub|oor. Take care to place tile as accurately as possible without sliding them into place. If grouting tile please leave appropriate spacer between tiles and follow instructions for use of Array‐Grout.
IMPORTANT: All |ooring must by rolled with a minimum 100‐lb roller after installation. Use a hand roller in areas not reached with a 100‐lb. roller.
VERSAILLES PATTERN TILES
The Versailles Pattern (French pattern). Proper installation and layout is important. The material must have a grout line of 3mm for proper placement. Use of 3 mm spacers is required to achieve proper grout line size and to ensure the tiles are spaced evenly.
a. The pattern is composed of
- 44% 16″ x 16″ tiles
- 33% 16″ x 24″ tiles
- 11% 8″ x 16″ tiles
- 11% 8″ x 8″ tiles
b. Instructions – Use a 3mm spacer to separate the tiles as the pattern
is constructed.
c. Place one 8‐inch by 8‐inch tile in the center.
d. Position two 16‐inch by 16‐inch tiles with one above where the right
edge of the larger tile is |ush with the right edge of the smaller tile, and
one to the left so that the top edge of the second larger tile is |ush with
the top edge of the smaller tile.
e. Place one 8‐inch by 16‐inch tile on the bottom of the section so that
the 8‐inch edge presses against the 16‐ inch square tile and half of the
16‐inch edge is pressed against the base edge of the square tile.
f. Place a 16‐inch by 24‐inch tile in the corner created by the
rectangular tile from Step 3 and the square tile from Step 1 so that the
16‐inch edge runs horizontally, extending out to the right of the structure.
g. Position a 16‐inch by 16‐inch tile immediately below the 16‐inch by
24‐inch tile so that the left edge of the square tile is pressed against the
short edge of the rectangular tile.
h. Lay a 16‐inch by 24‐inch tile with the 24‐inch side running
horizontally immediately to the left of the tile and pressed against the base
of the rectangular tile and half of the base of the {first 16‐inch square
tile.
i. Place an 8‐inch square tile against the last half of the base of the
{first 16‐inch tile and against the left edge of the 16‐inch by 24‐inch tile.
j. Place an 8‐inch square tile immediately above the {first 16‐inch
square tile with a 16‐inch square tile right above the 8‐inch tile.
k. Position an 8‐inch by 16‐inch tile with the 16‐inch edge pressed
against the 8‐inch square tile and the original 16‐inch square tile.
l. Position the last tile, an 8‐inch square tile, so that the right edge
is |ush with the right edge of the top‐right 16‐inch by 24‐inch tile. The 8‐
inch tile must be on top of the large rectangle with the right edges |ush to
complete the overall design.
ARRAY GROUT
Array‐Grout, with a unique formula, offers stain resistance color consistency,
and a smooth texture for easy spreading and clean‐up.
a. For Grouting Shaw groutable tiles. Can also be used on vitreous,
semi‐vitreous, or absorptive tile including ceramic, mosaic, quarry, cement,
porcelain, brick, mini‐brick, precast terrazzo, and natural stone.
b. Stain resistant, premixed, no shade variance, resists mold and mildew.
c. Use on |oors, countertops, walls, and ceilings.
d. For interior installations only.
COVERAGE
- 1. 1/16“ Grout joint approximately 500 sqft/gallon.
- 2. 1/8“ Grout joint approximately 300 sqft/gallon.
- 3. 1/4“ Grout joint approximately 140 sqft/gallon.
LIMITATIONS
a. Shaw Array‐Grout should not be installed, when the ambient temperature
is below 60° F and above 90° F. Shaw Array‐Grout should be kept at room
temperature for 24 hours before installation.
b. Some types of glazed ceramic tile, marble, and stone can be scratched, stained, or damaged when grouted with pigmented or sanded grouts. Generally, white grout is best suited for grouting white or light-colored marble or granite. Follow tile manufacturer’s recommendations. Test a small area prior to use. Certain tiles with high absorption, surface porosity, or rough textured surfaces and certain types of porcelain may require sealing prior to grouting to prevent staining.
SURFACE PREPARATION
- Tile must be {rmly attached to a sound substrate and setting material must be cured for a minimum of 24‐48 hours before grouting.
- Remove all spacers. Grout joints should be uniform in depth and width and free of all loose debris, contaminants, and excess mortar or adhesive.
APPLICATION
New installation
- Before grouting, soak the grout sponge in a pail of clean cool water and thoroughly wring out.
- Use the dampened sponge and lightly wipe the tile surface in an area no larger than 5‐10 sq. ft. A slightly wet tile surface allows the grout to glide easily over the tile and into the grout joint while providing for easier cleanup.
- While the tile is still damp, dispense a liberal amount of grout onto the tile surface.
- Using the grout |oat, press the grout into the grout joints over the dampened area apply grout on no more than 5‐10 sq. ft. at a time to allow for prompt cleaning; delayed cleaning may cause some cracking.
- Place the grout |oat on the edge at a 45° angle and rake the |oat diagonally across the tile surface while exerting downward pressure. This will force the grout evenly into the grout joints.
- Immediately remove all excess grout from the tile surface by holding the grout |at a 90° angle to the tile and drawing it diagonally across the tile.
- Clean by soaking grout sponge in clean cool water. Wring out excess water completely.
- Use dampened sponge in a circular motion to smooth grout joints and clean off any remaining excess grout.
- Continue rinsing of sponge in clean, cool water will aid in cleanup.
- Avoid excess water in grout joints. For {nal cleaning/haze removal, allow grout to cure for 24 hours. Use a dampened sponge, then a soft cloth to polish off residue.
Repair existing grout
a. Remove existing old grout with a grout saw 1/8” below the surface of
existing tile, Sweep or vacuum dust and debris from the surface of tile and
grout joints.
b. Shaw Array‐Grout can be applied directly over old grout. Apply enough
to totally cover the old grout. Follow directions for the new installation as
shown above.
CLEANUP
Clean tools and hands with cold water before material dries.
CARE & MAINTENANCE
Mold and Mildew can grow on dirt, food, and soap scum that can accumulate on
the grout surface. Routine cleaning will limit mold and mildew growth.
SAFETY
Avoid eye contact or prolonged contact with skin. Wash thoroughly after
handling. If eye contact occurs, |ush with water for 15 minutes and consult a
physician.
INSTALLATION FOR VINYL PLANKS
Layout of the Room
- Find the center point of the room. Strike a line.
- Obtain a true 90’ angle by using a carpenter’s square.
- Strike a second line which will divide the room into four equal parts.
- Measure the distance from the center to the wall, parallel to the direction of the plank.
- Divide the measurement by the width of the plank. If less than half remains as the border plank, adjust the point to compensate. This will give a larger border along the wall and reduce the chance of having to cut a small sliver of flooring to place along the wall.
Layout of the Plank
a. Carefully places the {first piece of plank at the junction of the
chalk lines.
b. Continue to lay the plank, making sure each plank |ush against the
chalk line and tight against the adjoining plank.
c. Make sure the plank is well seated into the adhesive paying special
attention, to the edges. Lay row by row, or in a pyramid fashion as shown
below.
Fitting the Border
a. Measure the distance from the last plank in the row to the wall.
b. Mark the plank and cut it against the mark.
c. Lay the plank in place, making sure that the cut edge is against the
wall.
Fitting Around Irregular Objects
a. Make a pattern out of heavy paper to {t around pipes and other
irregularities.
b. Place the pattern on the plank, trace cutting along the trace lines.
IMPORTANT: All |flooring must by rolled with a minimum 100‐lb roller
after installation. Use a hand roller in areas not reached with a 100‐lb.
roller.
Note: Do not use tape to secure or protect during construction or
renovation. Use ram board or similar to protect the floor.
For reference purposes only if printed or downloaded.
Revision: 04012022
References
- The domain name OORS.COM.
- ASTM International - Standards Worldwide
- ASTM International - Standards Worldwide
- Home - RFCI | Resilient Floor Covering Institute
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>