Mercia Overlap apex shed Instructions
- June 7, 2024
- Mercia
Table of Contents
Mercia Overlap apex shed Instructions
Overlap Cladding
Shiplap Cladding
Fixed Windows
Opening Windows
No Windows
Solid Sheet Floor
T &G Floor
Solid Sheet Roof
T &G Roof
Refer to the instructions pages for you specific product code
BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY
- Check the pack and make sure you have all the parts listed.
- When you are ready to start, make sure you have the right tools at hand (not supplied) including a Phillips screwdriver, Stanley knife, wood saw, step ladder and drill with 2mm bit.
- Ensure there is plenty of space and a clean dry area for assembly.
TIMBER
As with all natural materials, timber can be affected during various weather conditions. For the duration of heavy or extended periods of rain, swelling of the wood panels may occur. Warping of the wood may also occur during excessive dry spells due to an interior moisture loss. Unfortunately, these processes cannot be avoided but can be helped. It is suggested that the outdoor building is sprayed with water during extended periods of warm sunshine and sheltered as much as possible during rain or snow.
Our buildings are pre treated with a water based treatment**; this only helps to protect the product during transit and for upto 3 months against mould. To validate your guarantee and ensure longevity of the product, it is ESSENTIAL the building is treated with a wood preserver within the first three months of assembly and thereafter in accordance with the manufactures recommendations. Care must be taken to ensure the product is placed on a suitable base.
BUILDING A BASE
When thinking about where the building and base is going to be constructed: Ensure that there will be access to all sides for maintenance work and annual treatment.
Ensure the base is level and is built on firm ground, to prevent distortion. Refer to diagrams for the base dimensions, The base should be slightly smaller than the external measurement of the building, i.e. The cladding should overlap the base, creating a run off for water. It is also recommended that the floor be at least 25mm above the surrounding ground level to avoid flooding.
TYPES OF BASE
– Concrete 75mm laid on top of 75mm hard-core.
– Slabs laid on 50mm of sharp sand.
Whilst all products manufactured are made to the highest standards of Safety and in the case of childrens products independently tested to EN71 level, we cannot accept responsibility for your safety whilst erecting or using this product.
For Assistance Please Contact Customer Care on 01636 880514
Protim Fentex E5
Biocidal Product Regulation (EU 528/2012) Article 58 Information
Protim Fentex E2 preserved wood is a “treated article” which incorporates
biocidal products.
Wood correctly preserved with Protim Fentex E2 is protected against mould in
storage.
Contains: IPBC (3-iodo-2-propynyl-N-butyl carbamate) and propiconazole.
Wear gloves when handling freshly treated wood.
Avoid breathing dust when cutting treated or untreated wood.
Dispose of off-cuts responsibly – do not burn.
Mercia Garden Products Limited, Sutton On Trent, Newark, Nottinghamshire, NG23
6QN
www.merciagardenproducts.co.uk
Overall Dimensions:
Length = 1794mm
Width = 1199mm
Height = 1863mm
Base Dimensions:
Length = 1753mm
Width = 1175mm
Before assembly please make sure you have a suitable base ready to erect your building
Building content
Pre Assembly
Step 1
Step 2
Step 3
Step 4
Step 5
Step 6
Step 7
Step 8
Step 9
Step 10
Step 11
Step 12
Documents / Resources
|
Mercia Overlap apex
shed
[pdf] Instructions
Overlap apex shed, 01OVLPA0604SDFW-V1, 01OVLPA0604SDFW-V1-NW,
01OSBA0604SDFW-V1, 01OSBA0604SDFW-V1-NW, 01SHPA0604SDOW-V1,
01SHPA0604SDOW-V1-NW
---|---