FOXLUX IP65 LED Emergency Bulkhead Installation Guide
- June 6, 2024
- FOXLUX
Table of Contents
FOXLUX IP65 LED Emergency Bulkhead Installation Guide
Thank you for purchasing our FXB IP65 LED emergency bulkhead.
Our products have been designed according to the relevant standards. If
installed and maintained correctly they will provide a long service life.
Installation, Maintenance and Servicing Notes
- Ensure that the mains supply is switched off before installing, maintaining or servicing the luminaire.
- Luminaires should only be installed by qualified personnel.
- The LED light source and control gear are non-replaceable. Once end of-life is reached, the luminaire should be replaced.
- In case of mains supply failure, the battery will automatically energise the emergency light for a minimum 3hr period. After 3hrs 5m the luminaire will enter standby mode to protect the battery from over-discharge. The battery must be recharged within 6 months of full discharge.
- Self-test emergency luminaires are programmed to carry out functional and full duration tests according to BS EN 50172:2004.
- First battery charge will take up to 16hrs.
- Battery re-charge takes up to 8hrs. Note that full cycle (discharge and recharge) takes up to 12hrs.
- Contact Fox Lux if a battery replacement is required.
- Warranty terms apply. See website for details.
Testing Options
Standard: Testing and commissioning must be carried out manually according to BS EN 50172:2004.
Self-test: Functional test is carried out automatically once a week and runs for 30s. Full duration test is carried out automatically every 52 weeks. First full duration test is carried out automatically within the first 4 weeks after the luminaire being connected to mains. This luminaire can be used with the optional Remote Control (REM10) which adds extra featuresto Fox Lux emergency luminaires. Please refer to the REM10 user guide.
LED Status Indications
GREEN LED | RED LED | G R | STATUS | ACTION REQUIRED |
---|---|---|---|---|
Solid ON | OFF | OK | ||
Normal Flash | OFF | Charging | ||
OFF | Solid ON | Battery disconnected / Duration test failure | Connect battery |
/ Replace battery
Fast Flash| OFF| | Functional/Duration test in progress|
Normal Flash| Normal Flash| | Battery Temperature| Contact Fox Lux
OFF| Normal Flash| | Light source fault| Replace Luminaire
| | | |
Normal flash = 1Hz (once/second)
Fast flash = 2Hz (twice/second)
FXB Bulkhead range
Ref:| Description| Testing| Remote control| Operating
temp. ta| Net weight
---|---|---|---|---|---
FXB01/M/3| IP65 Bulkhead 3hr M 170lm (standard)| Manual| | 0°C – 40°C| 0.56kg
FXB01S/M/3| IP65 Bulkhead 3hr M 170lm (self-test)| Self-test| REM10
FXB02S/M/3| IP65 Bulkhead 3hr M 320lm (self-test)| Self-test| REM10
Installation Guide
Switch off mainssupply
Ensure that the mains supply is switched off before installing, maintaining or servicing the emergency luminaire.
Remove diffuser
Remove gear tray
Body installation
Mounting methods:
- Drill where indicated. Use rawl plugs & screws
- Drill where indicated to mount with BESA box
supplied screws andwall plugs are suitable formasonry only. Please purchase alternative fixings if required.
Wire size and preparation
Use the supplied IP65 cable gland where required. Ensure cable is correctly stripped.
Electrical connection
This product is classified as Class II insulated. Earth connection not required.
Complete labels
- Enter installation date on battery label
- Enter the appropriate code on the luminaire labe
Re-install gear tray
Attach diffuser
Attach legend if required
Switch mains supply on
Ensure this product is disposed responsibly according to WEEE directive 2002/96/EC
NET LED Limited | 300 Anderson Road | Buckingway Business Park | Cambridge |
CB24 4UQ
Tel: 01223 851505 Email: sales@netled.co.uk
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>