SALUS KL08NSB Wiring centre (8 zones) 230 V User Manual

June 6, 2024
SALUS

Wiring centre (8 zones) 230 V
Model: KL08NSB

Wiring centre description

  1. Cartridge fuse 5 x 20 mm 12 A
  2. Power supply
  3. NSB function terminals
  4. NC/NO jumper (actuator type)
  5. Delay jumper
  6. Boiler control output
  7. Pump control output
  8. Actuators connection
  9. Serial connector for the KL04NSB extension
  10. Reset button
  11. Thermostats connection

Introduction

The KL08NSB wiring centre forms the heart of an Underfloor Heating controls system. It allows easy and quick connection of thermostats and actuators. It has an integrated pump and boiler control module and overload protection. KL08NSB wiring centre is adapted to work with NC and NO type actuators (normally closed and normally open). Up to 8 thermostats can be connected to the KL08NSB, while the KL04NSB extension allows connecting additional 4 thermostats (12 in total).

Product compliance

This product complies with the essential requirements and other relevant provisions of the following EU Directives: EMC 2014/30/EU, Low Voltage Directive LVD 2014/35/EU, RoHS directive 2011/65/EU. The full text of the EU Declaration of Conformity is available at the following internet address: www.saluslegal.com.

Safety information

Use in accordance with national and EU regulations. The device is intended for indoor use only in dry conditions. Product for indoor use only. Installation must be carried out by a qualified person in accordance to national and EU regulations.
Before attempting to setup and install, make sure that KL08NSB is not connected to any power source. Installation must be carried out by a qualified person. Incorrect installation may cause damage to the wiring centre. The KL08NSB should not be installed in areas where it may be exposed to water or damp conditions.

Technical Information

Power Supply 2304 A( SO Hz
Total Load Mu SA
Pump/ Baler Relay Load tut 3A
Inputs External clod (230V)
Outputs Pump control (1II COAT) Boils comrol (140i1COM) Senninals for

actuators 123010
Dimensions Ow)| 355. SSx 67

1. Fuse
Note: Replace the fuse only when the wiring centre is disconnected from the power supply (230 V ~).
Main fuse is located under the housing cover next to power supply terminals and secures the wiring centre and the devices connected to it. Use ceramic tube fast blow 250 V ROHS fuses (5×20 mm) with nominal max current 12,5 A. To replace the fuse remove the fuse holder with a flat screwdriver and pull out the fuse.
2. Power Supply The power supply for the wiring centre is 230 V ~ 50Hz. Two-wire installations should be made in accordance with the applicable regulations
3. NSB (Night Set Back reduction) function and thermostats grouping
NSB function is activated in non-programmable Salus thermostats of the Expert NSB, HTR, BTR series via external signal. NSB 230 V signal (night-time temperature reduction) is sent via an external timer or programmable thermostat connected to the KL08NSB wiring centre. Non-programmable thermostats are receiving NSB signals and reducing setpoint temperature (by switching to eco-mode). All thermostats have to be connected using a 4-wire cable (min. 4 x 0,75 mm2, max. 4 x 1,5 mm2).
NSB function application in combination with thermostats grouping.
· OPTION 1 jumper
One Master thermostat is common for thermostats from Group 1 and Group 2 (one programmable thermostat e.g. VS30, other thermostats are non-programmable e.g. VS35).
OPTION 2 no jumper

Two Master thermostats. One for Group 1 and one for Group 2 (two programmable thermostats e.g. VS30, other thermostats are non-programmable e.g., VS35).
OPTION 3

One external clock is common for thermostats from Group 1 and Group 2 (one external clock + daily regulators e.g. VS35).
OPTION 4

**Two external clocks. One for Group 1 and one for Group 2 (two external clocks + non-programmable regulators e.g. VS35).
4. NC/NO jumper
Select the type of the thermoelectric actuator connected to the wiring centre:
NC: ­ actuator normally closed
NO: ­ actuator normally opened
Jumper position change must be refreshed in the memory by pressing the Reset button (short press).
5. Delay jumper**

Boiler off delay time.
Note: Pump (Pump output) and boiler (Boiler output) always starts 3 minutes after receiving the heating signal from any thermostats connected to wiring centre. Pump stops 3 minutes after the last call for heating sent by the thermostat and the heat source (boiler) will turn off after the time set on Delay jumper.
Jumper position change must be refreshed in the memory by pressing the Reset button (short press).

Boiler control output

Boiler output – this is a volt free output (COM / NO) that controls the boiler in the heating system. The output closes and the boiler turns on but always after 3 minutes after receiving the heating signal from any of the thermostats paired with the wiring centre. The output opens and the boiler switches off when the last thermostat stops sending heat demand (after the time set on the Delay jumper).

Pump control output

Pump output – this is a volt free output (COM / NO) that controls the circulation pump in the heating/cooling system. The output closes (pump starts) always after 3 minutes from the moment of receiving the heating/cooling signal from any of the thermostats paired with the wiring centre. The output opens (pump stops) 3 minutes after the last demand for heat/cool sent by the thermostat

Actuators connection

The actuator wires should be secured with the self-locking connectors in the appropriate zone. Up to 6 actuators with a load of up to 2 Watts each can be connected to a single zone. Should more than 6 actuators be required in a zone use an additional relay to relieve the output?

Serial connector for the KL04NSB extension
The Serial connector is used to connect the KL08NSN with the KL04NSB extension module to add functionality and support up to12 zones.

10. Reset button
– It is used to refresh the data, after switching jumpers 4 or 5.
11. Thermostats connection
• Connecting EXPERT NSB, HTR or BTR series thermostats

• Connecting a 230 V thermostat to the KL08NSB wiring centre (e.g. RT200)

• Connecting ON/OFF battery-powered thermostat with voltage-free COM / NO output contacts (e.g. 091FL, RT310, RT510)
230 V live terminal
N Neutral
NSB function terminal
SL ( ) 230 V input signal
Note: In NSB, HTR, ERT, BTR product series follow interchangeable signifying:
= SL
= NSB

INSTALLATION

Remove the top cover of the wiring centre.
Unscrew the main housing (see picture).
Mount the backside of the housing to the wall. When mounting on a DIN rail, open the hooks on the back of the housing.
Remove the appropriate piece of insulation from the wires.
Thread the wires under the mounting bolt in the back part of the wiring centre.
Thread the wires through the slots in the top part of the wiring centre and connect it to the terminals.
Set includes supplementary accessories (to support the installation process).
Adjust the wires and screw the main housing of the wiring centre to the rear housing.
Connect the thermoelectric actuators wires.
Make sure that all the wires are properly connected, mount the top cover and power up the wiring centre – the red power indicator LED will illuminate.

SALUS KL08NSB EN QG V001
Bar Code : 5060103692705  

Head Office:
SALUS Controls Plc
Units 8-10 Northfield Business Park
Forge Way, Parkgate, Rotherham
S60 1SD, United Kingdom
T: +44 (0) 1226 323961
E: [email protected]
www.salus-controls.com
SALUS Controls is a member of the Computime Group.
Maintaining a policy of continuous product development SALUS Controls plc reserve the right to change specification, design and materials of products listed in this brochure without prior notice.

References

Read User Manual Online (PDF format)

Loading......

Download This Manual (PDF format)

Download this manual  >>

SALUS User Manuals

Related Manuals