Miele PW 5105 Washer Extractor

It is essential to read the operating and installation instructions before installing, commissioning or using the machine. This avoids the risk of accidents or damage.
All rights reserved

Dimensions













Technical datasheet

Washer-extractor:   PW 5105 AV (Dump valve)
Heating:                  Electric (EL)

Legend

| Abbreviations in bold type:
Connection required
---|---
| Abbreviations in circle with dashes:
Connection optional or required depending on model version

Optional extras

UM| Miele base| UO 5010 (UO = open base)
Height Width Depth| 12”
27”
31”| 305 mm
684 mm
787 mm
---|---|---|---|---
UG 5010 (UG = closed base)
Height Width Depth| 12” 27 1/4” 31”| 305 mm

692 mm

788 mm

BS| Concrete base| Quality and density of concrete must comply with load. Concrete base must be firmly secured to floor!
Recommended height
Minimum height
Recommended width
Recommended depth| 11 13/16” 2 3/4” ≥ 27 9/16” ≥ 31 1/2”| 300 mm 70 mm ≥700 mm ≥800 mm
 | Dispensing pump| Pump installation may only be performed by Miele Service.
External dispensing pumps (2 or 4 head pump): Voltage (external power supply required) Fusing
Supplied with supply cable and plug|  | 120V
15A
NEMA 5-15
| Electrical connection (convertible)| Standard voltage
Frequency Rated load Fuse rating
Length of supply lead Supplied with plug| 6.5′| 2 AC 220 – 240V
60 Hz
4.4 – 5.2 kW
2 x 30 A
2000 mm NEMA L6-30P
---|---|---|---|---
Convertible to Frequency Rated load Fuse rating
Length of supply lead Supplied with plug| 6.5′| 2 AC 208V
60 Hz
4.0 kW
2 x 30 A
2000 mm NEMA L6-30P
Electrical connection must comply with national regulations.
Connection using multi-pole wall lockable socket in compli-ance with IEC/EN 60309 and IEC/EN 60947 is recommended in order to simplify electrical tests. If machines are hard-wired, a multi-pole mains switch must be provided on site. Switches with a contact gap of more than 3 mm can be used. These include switches, fuses and contactors (IEC/EN 60947). A wall socket or mains isolator must be easily accessible after installation.
Reinstallation of the supply point, changes to the equipment or checks on the protective conductor, including determination of correct fuse rating, should only be performed by a properly trained electrician.
If necessary, equipotential bonding with good galvanic contact must be provided in accordance with all appropriate national and local regulations.
| Cold water
(Soft water)| Min. flow pressure Max. pressure Max. throughput
On-site connection thread
Length of connection hose (supplied: 1 connection hose) Hourly water demand (average for 60°C program) for standard connection (with warm and cold water)
If warm water supply is not available add warm water demand to cold water demand.| 14.5 psi 145 psi
2.9 gal/min
3/4″ garden hose thread, male
61”
approx.
18.5 gal/h| 100 kPa
1000 kPa

11 l/min
3/4″ garden hose thread, male 1550 mm
approx. 70 l/h

| Warm water

(Soft water)

| Max. temperature Min. flow pressure Max. pressure Max. throughput
On-site connection thread
Length of connection hose (supplied: 1 connection hose)
Hourly water demand (average for 60°C program)
If reprogrammed by Miele Service, the Machine can also be connected to a hot water supply line with a temperature of 70°C to max. 85°C. This requires a separate inlet hose. This additional inlet hose is available from Miele Spares.
If warm water is not available, connect warm water hose to cold water valve!| 158°F
14.5 psi 145 psi
2.9 gal/min
3/4″ garden hose thread, male 61” approx.
18.5 gal/h| 70°C
100 kPa
1000 kPa
11 l/min
3/4″ garden hose thread, male 1550 mm approx. 70 l/h
| Drain: Dump valve| Max. temperature
Machine-side drain connection (ext. diameter) On-site drain (int. diameter)
Max. transient throughput
Vented drainage required. If ventilation is insufficient, fit Miele kit, Mat. no. 05238090.
Drain manifolds serving several machines must be of sufficient cross-section.| 158°F
2 15/16”
2 15/16”
16.4 gal/min| 70°C
75 [DN 70] mm
75 [DN 70] mm
62 l/min
| Fittings for base/floor installation| Miele base UG/UO 5010

4 × metal angled brackets (to secure machine to base )
4 × screws DIN 571 (Ø × length)
4 × rawl plugs (Ø × length)
Machine must be bolted to the base and floor!
Fixing materials for a floating screed floor are to be provided on site.

| 5/16” x 2 9/16”
1/2” x 2 3/8”| 8 mm x 65 mm
12 mm x 60 mm
Installation on floor or concrete base
2 × clamps
2 × screws DIN 571 (Ø × length)
2 × rawl plugs (Ø × length)
Machine must be bolted to the base or floor. Fittings are supplied with machine
Fixing materials for a floating screed floor are to be provided on site.| 1/2” x 2”5/16” x 1 9/16”| 6 mm x 50 mm
8 mm x 40 mm
 | Machine data| Unit width| 27 9/16”| 700 mm
---|---|---|---|---
Machine depth| 32 9/16”| 827 mm
Unit height| 40 3/16”| 1020 mm
Casing width| 31 3/16”| 792 mm
Casing depth| 31 1/8”| 790 mm
Minimum width of delivery access to installation site| 28 3/8”| 720 mm
Recommended rear wall gap (measured to front of machine)| 47 1/4”| 1200 mm
Minimum rear wall gap (to front of machine)| 39 3/8”| 1000 mm
Recommended rear wall gap ensures sufficient space for|  |
maintenance and servicing.|  |
Net weight| 327 lbs| 148 kg
Dynamic floor load, max.| 2750 N| 2750 N
Static floor load, max.| 1960 N| 1960 N
Dynamic load, max.| 790 N| 790 N
Drum frequency, max.| 18 Hz| 18 Hz
Average heat dissipation| 2630 BTU/hr| 0.77kWh
(dependent on ambient room temperature and program|  |
selected)|  |
Sound pressure (re 20 mPA),| <70 dB (A)| <70 dB (A)
workplace-related (at distance of 1 m and height of 1.6 m)|  |
Installation should only be carried out by authorized installers in accordance with valid regulations! Follow installation instructions when installing machine! All rights reserved!

Technical datasheet: PW5105 EL AV (Dump valve)

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals