wallbox Single Phase Energy Meters Installation Guide

June 6, 2024
wallbox

wallbox-Single-Phase-Energy-Meters-LOGO

wallbox Single Phase Energy Meters

Purpose and Scope of the Document:

The purpose of this document is to outline the instructions for installation of energy meters compatible with the Power Boost and Eco-Smart functionalities.
For instructions to install an MID meter, refer to the relevant Installation Guide.

Important Notes

  1. After the installation, connect the energy meter before closing your charger. In case the charger had already been installed, open it to connect the energy meter.
  2. Only energy meters delivered by Wallbox are compatible.
  3. The installation must be performed only by suitably qualified personnel, according to local regulations.
  4. Make sure to update your charger with the latest software version before installing the meter.
  5. Ensure the charger is powered off before connecting the meter.
  6. For more information, refer to your charger’s Installation Guide on Wallbox Academy.

Materials and Tools

Inside the Box

wallbox-Single-Phase-Energy-Meters-FIG-1

Devices

wallbox-Single-Phase-Energy-Meters-FIG-2

Tools

wallbox-Single-Phase-Energy-Meters-FIG-3

Compatibility Table

Meters Power Boost Eco-Smart
EM340 PF.A / PF.B PF.B
EM112 PF.A / PF.B PF.B
SPM1-100-AC **** ****

EM330

CTA 5X 250 A 5A CTA 6X 400 A 5A CTD-6S 600 5A

| |
N1CT| |
PRO2 MOD| |
PRO380 MOD| |

Placement

  1. Place the energy meter after the mains supply in the fuse box.
    wallbox-Single-Phase-Energy-Meters-FIG-3

  2. For all the meters, follow the corresponding manual included in the box.

Note : For the EM340 and the EM112 meters, only the PF.B versions are compatible with the Eco-Smart functionality.For the Power Boost functionality, both the PF.A and PF.B versions of EM340 and  EM112 meters are compatible. Refer the Eco-smart configuration article to know more.

SPM1-100-AC

  1. Used for 1-Phase installation. Up to 100A.
  2. Clip the power meter to the mains power cable.
  3. Neutral cable must not be drawn through the clamp.

Note : Ensure to insert the cable through the clamp in the correct direction as shown.

Pro MOD2 / Pro 380 MOD / N1 CT

wallbox-Single-Phase-Energy-Meters-FIG-7

Pulsar Plus

wallbox-Single-Phase-Energy-Meters-FIG-8

wallbox-Single-Phase-Energy-Meters-FIG-9

Commander 2

wallbox-Single-Phase-Energy-Meters-FIG-10

wallbox-Single-Phase-Energy-Meters-FIG-11

Copper SB

wallbox-Single-Phase-Energy-Meters-FIG-12

wallbox-Single-Phase-Energy-Meters-FIG-13

Configuration

Power Boost
Follow these steps to configure the Power Boost functionality.

Eco-Smart
Follow these steps to configure the Eco-Smart functionality.

support.wallbox.com

References

Read User Manual Online (PDF format)

Loading......

Download This Manual (PDF format)

Download this manual  >>

wallbox User Manuals

Related Manuals