WATTS KLSC Series KLSC20 Boiler Charging Units User Manual
- June 5, 2024
- WATTS
Table of Contents
- WATTS KLSC Series KLSC20 Boiler Charging Units pro
- Safety
- Important safety information
- Intended use
- Foreseeable misuse
- Operator’s responsibility
- Users
- Technical features
- Pressure loss diagram
- Dimensions
- Component overview
- Installation and commissioning
- Installing the circulation pump
- Disposal
- Warranty
- References
- Read User Manual Online (PDF format)
- Download This Manual (PDF format)
WATTS KLSC Series KLSC20 Boiler Charging Units pro
Safety
Safety notices
DANGER DANGER indicates an imminent danger that may cause serious
physical injury or death if the appropriate safety precautions are not in
place.
WARNING WARNING indicates a danger arising through incorrect behaviour
(e.g. misuse, disregarding notices, etc.) that may cause serious physical
injury or death.
CAUTION CAUTION indicates a potentially dangerous situation that may
cause minor or slight injuries if the appropriate safety precautions are not
in place.
NOTICE NOTICE indicates a situation that may cause material damage if the
corresponding precautions are not taken.
Important safety information
- Read this operating manual carefully before use.
- Only connect this boiler charging unit to a power supply which matches the supply voltage stated on the boiler charging unit’s data plate.
- The power supply on the boiler charging unit must be disconnected before completing any maintenance, cleaningor repair work.
- Maintenance, cleaning and repair work may be carried out by trained specialist personnel only.
- If the boiler charging unit is damaged or is not functioning orrectly, it must no longer be used. In this case, contact your specialist dealer immediately.
- Observe the maintenance instructions and intervals.
- Protect the boiler charging unit against the effects of weather.
- Never use the boiler charging unit outdoors.
- The boiler charging unit may only be used in accordance with its intended use.
Intended use
The boiler charging unit is used to reduce the time required to reach the
boiler operating temperature (to avoid dropping below the dew point). This
extends the service life of the boiler while also reducing the emission of
harmful substances.
The boiler charging unit is fully pre-assembled and is designed for wall-
mounting. The boiler charging unit is not intended for use by persons
(including children) with reduced physical, sensory or mental capabilities, or
lack of specialist knowledge or experience.
Foreseeable misuse
The following is regarded as foreseeable misuse
- operating the boiler charging unit contrary to the specifications;
- using the boiler charging unit for use other than its intended use;
- making modifications to the boiler charging unit not agreed with the manufacturer;
- using replacement or wear parts not approved by the manufacture;
- operating the boiler charging unit outdoors (parts and components are not UV-resistant).
Operator’s responsibility
The operator must ensure that:
- the boiler charging unit is only used for its intended purpose;
- the boiler charging unit is installed, operated and maintained according to the specifications in the Installation and Operating Manual;
- the boiler charging unit is only operated according to local directives and occupational health and safety regulations;
- all precautions have taken to avoid hazards originating from the boiler charging unit;
- all precautions for first aid and fire suppression are carried out;
- only authorised and trained users have access to and operate the boiler charging unit;
- users have access to this Installation and Operating Manual at all times.
Users
Only qualified persons may operate the boiler charging unit or carry out
service and maintenance work.
Operators
An operator is deemed to be qualified if they have read this operating manual
and understood the potential hazards associated with improper behaviour.
Fitters/commissioners
Due to their technical training, expert knowledge and consideration of the
relevant standards, provisions, regulations and laws, fitters/commissioners
are able to carry out work on the boiler charging unit and to identify and
prevent potential hazards.
Technical features
3 Technical features|
---|---
Hydraulic data| KSLC20| KLSC25| KLSC32
Max. operating pressure| 6 bar| 6 bar| 6 bar
Ambient temperature| | -2 °C to +40 °C (observe pump specifications)|
Operating temperature| | +2 °C to +90 ° (observe pump specifications)|
Gravity brake opening pressure| 10 mbar| 10 mbar| 10 mbar
Kvs bypass| 6.3| 10.0| 18.0
Temperature display range| 0 – 120 °C| 0 – 120 °C| 0 – 120 °C
Temperature setting range controller| 5 – 95 °C| 5 – 95 °C| 5 – 95 °C
Pre-setting controller| 60 °C| 60 °C| 60 °C
Dimensions| KSLC20| KLSC25| KLSC32
---|---|---|---
Width x height x depth with EPP shell| 240 x 310 x 217 mm| 300 x 370 x 240 mm|
300 x 370 x 240 mm
Centre distance| 90 mm| 125 mm| 125 mm
Sealing surfaces distance| 293 mm| 342.5 mm| 342.5 mm
Connections to pipe network| KSLC20| KLSC25| KLSC32
Boiler (top)| 1” M, flat sealing| 1/2″ M, flat sealing| 2” M, flat sealing
Tank (bottom)| 1” M, flat sealing| 11/2″ M, flat sealing| 11/2″ M, flat
sealing
2 x screw fitting (top connection)| –| 1 1/2” union nut x 1” F| 2″ union nut ×
11/4″ F
Tightening torques for screw fittings| KSLC20| KLSC25|
KLSC32
3/4″| 35 Nm| 35 Nm| 35 Nm
1″| 55 Nm| 55 Nm| 55 Nm
11/4″| –| 90 Nm| 90 Nm
11/2″| –| 130 Nm| 130 Nm
2″| –| –| 190 Nm
Materials| KSLC20| KLSC25| KLSC32
Fittings| CW617N| CW617N| CW617N
Pipes| Stainless steel Ø33 mm| Tubular steel| Tubular steel
Plastics| impact-resistant and temperature-resistant| impact-resistant and
temperature-resistant| impact-resistant and temperature-resistant
Flat seals| AFM 34/2| AFM 34/2| AFM 34/2
Bypass pipe| CW617N| CW617N| CW617N
Gravity brake| POM, NBR, stainless steel| POM, NBR, stainless steel| POM, NBR,
stainless steel
O-rings| EPDM| EPDM| EPDM
Insulation| EPP| EPP| EPP
Retaining bracket| Spring steel| –| –
Wall brackets| Galvanised sheet steel| Galvanised sheet steel| Galvanised
sheet steel
Circulation pump| | |
Pressure loss diagram
Dimensions
Component overview
- Ball valve with gravity brake1) (return)
- Ball valve (supply)
- Circulation pump
- Actuator including regulator
- 3-way mixing valve
- Bypass pipe
- Wall bracket
- Sensor well for supply line temperature sensor from the actuator
- Spacer (on KLSC32 only)
- Tank return
- Boiler return
- Boiler supply
- Tank supply
Installation and commissioning
DANGER Electricity! Risk of death from electric shock! h Work on live
parts must be carried out only by trained electricians. h Disconnect the power
supply to the unit before carrying out any installation, maintenance, cleaning
or repair work and secure it against reconnection.
NOTICE The boiler charging unit may only be installed and commissioned by
specialist personnel who have been duly trained and authorised by the
manufacturer.
CAUTION When carrying out repairs and replacing parts, the prescribed
mounting positions and flow directions for the individual components to be
replaced must be observed.
CAUTION Material damage due to water hammer. Water hammer may occur if
the shut-off valves are opened and closed quickly. h Always open and close the
shut-off valves slowly and in a controlled way.
Installation diagram
Before installing the unit and starting it for the first time, check all
screw fittings and retighten if necessary!
Tightening torque:
| KSLC20| KLSC25| KLSC32
---|---|---|---
3/4″| 35 Nm| 35 Nm| 35 Nm
1″| 55 Nm| 55 Nm| 55 Nm
11/4″| –| 90 Nm| 90 Nm
11/2″| –| 130 Nm| 130 Nm
2″| –| –| 190 Nm
Requirements
- The fittings are preassembled at the factory; however, the tightness of the seal is to be checked before commissioning (pressure test).
- Observe Fig. 7-1 on page 8 and Fig. 7-2 on page 8 when mounting the unit.
- Remove the boiler charging unit (A) front cover.
- Mark the drilling points for mounting the boiler charging unit.
- Drill holes for the relevant size screws and wall plugs.
- Insert the wall plug (1 x for KLSC20 and 2 x for KLSC25 / KLSC32).
- For KLSC20 only. Screw the dowel screw into the wall plug leaving at least 50 mm protruding.
- Locate the boiler charging unit vertically on the wall.
- For KLSC25 and KLSC32 only. Fix 2 screws into the wall plugs.
- Remove the thermometer handles (B) and the intermediate insulation (C).
- Connect the supply and return lines and check all screw connections are tight.
Starting the unit
Requirements
- The boiler charging unit is fully assembled.
Connection of the power supply
-
Connect the power supply (see separate pump documentation).
-
The boiler charging unit automatically switches itself on when the power supply is connected.
-
Vent the heating system.
NOTICE The boiler charging unit must be switched off
during the venting process. -
. Fit intermediate insulation (C) and thermometer
-
Fit the boiler charging unit front cover.
Controller and actuator adjustment
Setpoint temperature is preset to 60 °C.
Further information on the controller and actuator be found in the accompanying instructions.
- Thermometer handle settings
- Operating position: gravity brake ready to work; ball valve open.
- Drain: gravity brake open; ball valve half open (only included in the return line).
- Service position: ball valve closed.
Switching the KLSC20 supply and return lines Initial setup: the supply is on the left-hand side. Disconnect the power supply and secure against reconnection.
-
Remove the lines from the bracket.
-
Remove the actuator from the 3-way mixing valve.
-
Disconnect the connecting pipe from the 3-way mixing valve.
-
Change the lines over.
The supply is now on the right-hand side. -
Loosen the connection to the ball valve, rotate the return line and then tighten the connection to the ball valve again.
-
Remove the end cap from the 3-way mixing valve and then use it to close off the opposite side.
-
Connect the connecting pipe to the 3-way mixing valve and fit the lines into the bracket.
Reset the regulating insert (spindle) and fit the actuator (see 8.7 on page
13).
Observe the separate operating instructions for the actuator. Check the seals
on the boiler charging unit are not leaking. Switching the KLSS25 and
KLSC32 supply and return lines Initial setup: the supply is on the
left-hand side. Disconnect the power supply and secure against
reconnection.
-
Loosen the lower nut on the pump connection.
-
Remove the thermowell and the end cap.
-
Rotate the pump and the return ball valve by 180 degrees.
-
Loosen the nut on the supply ball valve and rotate by 180 degrees. Remove the actuator from the 3-way mixing valve.
-
Rotate the boiler charging unit by 180 degrees. Tighten all screw fittings and other connectors. The thermowell must be placed on the outer side.
The supply is now on the right-hand side. -
Reset the regulating insert (spindle) and fit the actuator (see 8.8 on page 13).
Observe the separate operating instructions for the actuator. Check the seals on the boiler charging unit are not leaking. Maintenance****
DANGER Electricity!Risk of death from electric shock!
- Maintenance work on the boiler charging unit may only be carried out once the power supply has been disconnected.
WARNING Hot water!Severe scalding possible.
- Do not put hands into hot water when draining the boiler charging unit. Allow the boiler charging unit to cool down before completing any maintenance, cleaning or repair work.
WARNING Hot surfaces!Severe scalding possible.
- Do not hold pipework or components while the unit is in operation. Allow the boiler charging unit to cool down before completing any maintenance, cleaning or repair work. Wear heat-resistant safety gloves if it is necessary to work on hot components.
NOTICE Maintenance of the boiler charging unit must be carried out only by specialist personnel who have been duly trained and authorised by the manufacturer.
Annual maintenance schedule 1. General visual inspection
- Check the unit for leaks and retighten connections with flat seals or replace the seals.
Functional check
- Check the correct adjustment and operating and performance parameters.
- Check for noisy operation.
- Check with the user in the event of anomalies.
Ball valves
- Check for correct operation of shut-off valves and ball valves.
Pump
• Be aware of noise build-up in the pump.
Mixing valve
- Check functionality of mixing valve.
Post-maintenance checks
- Check all loosened screw connections for a firm seating and retighten if necessary.
- Remove all tools, materials and other equipment used from the work area.
- Bleed the system..
Replacing wear parts
Note that the boiler charging unit has parts which are subject to wear that naturally occurs as a result of normal use even when properly maintained and serviced. Specifically, these are mechanical parts and parts which are in contact with hot water and steam such as hoses, seals, valves, etc. Normal wear and tear is not a defect and is not covered under warranty or guarantee. Nevertheless, defects and malfunctions may only ever be remedied by trained specialist personnel.Contact your specialist dealer for more information.
Removing the circulation pump
- Disconnect the power supply and secure against reconnection.
- Remove the boiler charging unit (A) front cover.
- Close the shut-off valves.
- Remove the thermometer handles (B) and the intermediate insulation (C).
- Disconnect the circulation pump (D) from the power supply.
Undo the nuts (X) and remove the circulation pump.
Installing the circulation pump
- Replace damaged or defective seals if necessary.
- Fit the circulation pump and tighten the nuts (X) (see Chapter 3 on page 4 for tightening torques).
- Connect the circulation pump (D) to the power supply.
- Slowly open the ball valve by turning the thermometer handle (B).
- Slowly pressurise the boiler charging unit and vent the system.
- Check the seals on the boiler charging unit are not leaking.
- Reconnect the power supply to the boiler charging unit.
- Remove the thermometer handles (B).
- Fit the intermediate insulation (C), thermometer handles (B) and front cover (A).
Removing the 3-way mixing valve
- Disconnect the power supply and secure against reconnection.
- Remove the boiler charging unit (A) front cover.
- Close all shut-off valves by rotating the thermometer handle.
- Remove the thermometer handles (B) and the intermediate insulation (C).
- Move the regulating insert (spindle) to centre position using the lever on the actuator.
- Remove the actuator (S).
Remove the mixer (M) by loosening the union nuts (X).
Instructions for fitting/removing the actuator can be found in the relevant
manufacturer’s manual.
Fitting the 3-way mixing valve
- Replace the seals on the screw connections.
- Insert the 3-way mixing valve (M) and tighten the nuts (see Chapter 3 on page 4 for tightening torques).
- Fit the actuator (S).
- Slowly open the ball valve by turning the thermometer handle (B).
- Reconnect the power supply to the boiler charging unit.
- Remove the thermometer handles (B).
- Fit the intermediate insulation (C), thermometer handles (B) and front cover (A).
Instructions for fitting/removing the actuator can be found in the relevant manufacturer’s manual.
3-way mixing valve actuator settings for KLSC20
NOTICE When reinstalling the actuator, make sure the bearing shaft is in
the correct position. When setting up the regulating insert (spindle) for the
first time, refer to the images below.
3-way mixing valve actuator settings for KLSC25 and KLSC32
NOTICE When reinstalling the actuator, make sure the bearing shaft is in
the correct position. When setting up the regulating insert (spindle) for the
first time, refer to the images below.
Disposal
WARNING Improper disposal can lead to contamination of the
environment and groundwater!
When disposing of components and operating materials, the provisions
and guidelines of the country of use must be observed.
- Make sure the current to all subassemblies and components has been disconnected.
- Remove the boiler charging unit in the correct way or engage a specialist company to do this.
- Separate the subassemblies and components into recyclable materials and operating materials.
Dispose of the subassemblies and components in accordance with local laws and
provisions or take them to a recycling facility.
Return to manufacturer
Contact the manufacturer if you wish to return the boiler charging unit or
component parts.
Informing authorities and the manufacturer
Inform the manufacturer when decommissioning and disposing of the boiler
charging unit for statistical purposes.
Warranty
WATTS products are tested extensively. WATTS therefore guarantees only the replacement or, at the sole discretion of WATTS, the free-of-charge repair of components of the supplied products where these, in the opinion of WATTS, exhibit verifiable manufacturing faults. Warranty claims due to defects or defects of title may be asserted within one (1) year of delivery/transfer of risk. Excluded from the warranty are damages attributable to normal use of the product or wear and damages resulting from modifications or non-authorised repairs on the products, for which WATTS rejects all claims for compensation (direct or indirect). (For more detailed information, please refer to our website.) In all cases, supply is subject to the General Terms and Conditions, which can be found at www.wattswater.eu/gtc/. Godramsteiner Hauptstr. 167 • 76829 Landau • Germany Tel. +49 6341 9656 0 • Fax +49 6341 9656 560 WIDE@wattswater.com • www.wattswater.de © 2021 Watts KLSC20-KLSC25-KLSC32 -IM-DE-W-UK-08-2021-Rev.0 | Part no. 10084836
References
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>