sunways PC Monitoring Software User Manual

June 5, 2024
sunways

Sunways PC Monitoring
User Manual
Ningbo Sunways Technologies Co., Ltd.

About This Manual

1.1 Target Group
This manual is intended for photovoltaic (PV) plant operating personnel and management personnel.
1.2 Purpose
This manual mainly introduces how to create and manage accounts, power plants, devices of Sunways monitoring system.

About Sunways Monitoring System

Note: As the monitoring system will be upgraded periodically, the actual display content may be slightly different from this manual, but it doesn’t affect the use of overall functions.
Major functions
Sunways plants monitoring system mainly includes the following functions:

  • Detailed information of plant & device: All plants’ generation overview, add & edit specific plant and device, check plant&device status, view specific plant&device generation records. See chapter 4 for details.
  • Management function: plant management, device management, organization management.
  • Other functions: change username, bound email and password, system setting.

2.1 Plant view permission explanation

  1. End users can view the plants that have bound the devices in its account.
  2. Once the plant is associated with the installer’s account, the installer can also view this plant, including the superior account.
    Create an end-user account, login/logout and system setting

3.1 Create an end-user account

  1. Access the Sunways monitoring system by entering the URL
    https://www.sunways-portal.com/ in the browser address box.

  2.  Select a proper language from the drop-down menu in the upper-right corner of the login page.

  3. Click “Click to register”. The registration page is displayed.

  4. Enter the end-customer registration information as required.

  5. Click “send”.

  6. Enter the obtained verification code.

  7. Select I have read and agree to “Privacy Policy” and “Terms of Use” and click “Owner Registration”.

  8. Enter the account and password and click “Log In”.
    Note: This method is only used to create an end-user account. An organization account can only be created by another organization account. Please contact your distributor or SF Suntech to create your organization account.

3.2 Login

  1. Access the Sunways monitoring system by entering URL https://www.sunways-portal.com/ in the browser address box.
  2. Select a proper language from the drop-down menu in the upper-right corner of the login page.
  3. Enter the email address associated with the account in the email field.
  4. Enter the password in the password field.
  5. Click “Log In”

3.3 Modify account info
➢ Click the “avatar” in the upper right corner of the page and view the items in the drop-down list box.
➢ Click “Account Info” to change the avatar icon and username.
➢ Click “Mailbox Replacement” to change the bound email.
➢ Click “Change Password” to set a new password.
➢ Click “Log out” to log out of Sunways monitoring system.sunways PC
Monitoring Software - dashboard.

3.4 System settingsunways PC Monitoring Software

Click the “ ” icon in the upper right corner of the page, then edit the company information (only the organization account has this option) and system settings.

3.5 System notification

Click the bell icon in the upper right corner of the page, and the monitoring system notification will be shown, such as new version release, system maintenance, etc.

3.6FAQ &Instructions

Click the “**?**” icon in the upper right corner of the page, FAQs page displays the common usage problem and solutions. Instructions can help you learn more about the monitoring system.

Overview

On the overview page, you can learn about the running status of all plants. In each section, you can see the overall power yield conditions, revenue and energy-saving and emission reduction. Besides, you can view the overall operational status of plants in a dashboard. ![sunways PC Monitoring Software

Plants

Click “Plants” to enter the corresponding interface where information such as Status, Plant Name, Total String Capacity, Current Power, E-total, and Unit Production is displayed.sunways PC Monitoring Software -
Capacity,

5.1 Plant Search bar
Search category: You can search by Plant type, including “Residental Plant”, “Utility Plant”, “C&I Plant”, and “Energy Storage Plant”.
Exact search: Search by entering the exact “Plant Name”, “SN” or “Email”, then click the Search button to view the result.

5.2 Plant Overview
Click the plant name to enter the “Plant Overview” page. The power flow diagram, climate data, plant details, real-time power curve and power yield are shown here. sunways PC Monitoring Software - power

5.3 Device Info
Click the “Device info” button at the side of “Overview” and go to the device details page to check the inverter’s basic information, real-time information, power production, and historical information.![sunways PC Monitoring Software

Select different time units at the top left of the power display section, and then select the time from the right side of the section to view the power generation corresponding to each time.sunways PC Monitoring Software -
Ningbo 3

Select the different parameters to view the corresponding operating data, such as PV current, PV voltage, AC current, AC voltage, Frequency, and Temperature, then select the time from the right side of the section to view the historical curve. Hover the mouse to see the specific data.sunways PC Monitoring
Software - Temperature

Management

Different role management permissions are as follow:

Role Plant management Device management Organization Management
Enduser Yes Yes No
Install/Distributor Yes Yes Yes

6.1 Plant management
6.1.1 Add plant
Click the “add plant” button in the upper right corner to go to the plant creation interface. Fill in all contents that are required here to finish creation.sunways PC Monitoring Software - corner

Note: If the email entered in the plant creation step was already registered by the end-user, the newly created plant will automatically appear on the end user’s account. Otherwise, the system will automatically create a new end-user account with the account entered email and password ST123456.
6.1.2 Plant screening
Enter the filter criteria and click “search” to filter out the eligible plant.
6.1.3 Operate
Click the “ ” icon to jump to the device management page.sunways PC
Monitoring Software - management

Click the “ ” icon to edit the plant information.sunways PC Monitoring
Software - Sunways

Click the “ ” icon to delete this plant. (The plant can only be deleted by the account that created it). sunways PC Monitoring Software -
deleted

6.2 Device management
For device screening, enter the filter criteria and click “search” to filter out the eligible plant.
Edit device name, click “ ” to the device name.sunways PC Monitoring
Software - filter

Delete devices and click the “ ” icon to unbind the device.sunways PC
Monitoring Software - Parameter

6.2.1 Parameter Settings (Only organization account has this function)
Click the “ ” icon to enter into parameters setting page.
Please read the disclaimer carefully, if one agrees, select “I have read and agree to the above statement” and click “confirm”, otherwise click “cancel”. The verification password is the same as the login password. sunways PC
Monitoring Software - login password.1

Note: Please operate under the guidance of professional personnel; otherwise, the equipment may not work properly or the machine may be damaged in serious cases.
6.3 Organization management (only organization account has this function)
6.3.1 Creat sub-organization
The “Administrator” account can create a sub-level account.
Click the “**+**” icon, then enter sub-level account information. Finally, click “ok” to create an account. The default password is “STDE1993”. sunways
PC Monitoring Software - Ningbo Sunways1

Click the “add account” button at the top right of the internal account page. Then enter fill in the username, email, and choose the account role.sunways
PC Monitoring Software - button

Role permission is as follows:

Role Plant Plant Management Device Management
View View Edit Delete
Distributor Administrator
Distributor O&M
Distributor Visitor NULL NULL

6.4 Device log
The device log page displays the operation data of parameter settings. It has historical maintenance records.

Hotline: +86 400-9922-958
Mail:service@sunways-tech.com
Website:www.sunways-tech.com
No. 1, Second Road, Green Industrial Zone, Chongshou Town, CiXi City, ZheJiang Province, China
Version:2022-4

Documents / Resources

| sunways PC Monitoring Software [pdf] User Manual
PC Monitoring, Software, PC Monitoring Software
---|---

References

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals