Packing List

sunways -STS 3-6kW -Series- Grid-connected- PV- Inverter
-Single -Phase- Dual- MPPT- 1

Note

  1. Export limit & control version 2pcs; RS485 and DRED version 1pcs (This connector is already pre-installed inside the inverter).
  2. DRED version only (This connector is already pre-installed inside the inverter).

Installation Spacing

sunways -STS 3-6kW -Series- Grid-connected- PV-
Inverter -Single -Phase- Dual- MPPT- 2

Bracket Dimensions

Use the wall bracket as the template to mark the position of 4 holes on the wall.sunways -STS 3-6kW -Series- Grid-connected- PV- Inverter -Single
-Phase- Dual- MPPT- 3

Mounting the Inverter

Insert the expansion tubes into the holes and tighten them, then fix the bracket onto the wall with expansion screws by using a cross screwdriver. Lift up the inverter with both hands, hang the back rail on the fixed wall bracket carefully.sunways -STS 3-6kW -Series- Grid-connected- PV- Inverter -Single
-Phase- Dual- MPPT- 4

DC Connector Assembly Procedure

Use a 2.5-4mm² PV cable, strip off the cable sheath for 7mm, insert the stripped head into the metal terminal and use a crimping plier to press it tight, insert the metal terminal into the corresponding PV connector and tighten the nut.sunways -STS 3-6kW -Series- Grid-connected- PV- Inverter
-Single -Phase- Dual- MPPT- 5

DC Connector Connection

nsert the positive and negative connectors into the inverter PV connectors respectively.
Note :

  1. Disconnect the AC breaker on the grid side when connecting the PV connectors.
  2. The DC switch must be switched to “OFF” position.

Ground Terminal Connection

Note: Inverter must be well-grounded for resisting surge voltage shock and improving EMI performance.

AC Connector Assembly

Strip off the AC cable sheath for 50mm, and strip off the end of L/N/PE each cable for 8mm.sunways -STS 3-6kW -Series- Grid-connected- PV- Inverter
-Single -Phase- Dual- MPPT- 8

Insert the stripped end of L/N/PE cable into the AC terminal head. Tighten the screws in the terminal with an Allen-key to ensure a reliable connection.sunways -STS 3-6kW -Series- Grid-connected- PV- Inverter -Single
-Phase- Dual- MPPT- 9

AC Connector Connection

An AC breaker must be connected on the AC side of the inverter. The recommended AC cable and breaker for Sunways STS 3-6kW series single-phase inverters are shown in the following table: Connect the AC connector to the inverter AC terminal, and the slight “click” represents the connection is in place.

Model   Copper wire Breaker
STS-3KTL 4mm² 20A
STS-3.6KTL 4mm² 25A
STS-4.2KTL 4mm² 32A
STS-4.6KTL 4mm² 32A
STS-5KTL 6mm² 40A

STS-6KTL

Note: Check the

| 6mm²

local standar

| ds 40A        e

for mor

sunways -STS 3-6kW -Series- Grid-connected- PV- Inverter -Single -Phase-
Dual- MPPT- 10

Grid Connection Steps

  1. Check whether all connectors are correctly connected.
  2. Switch the AC breaker on.
  3. Turn the DC Switch to “ON” position.
  4. The inverter starts self-checking and the screen displays “checking”.
  5. After self-checking is completed, the inverter will start to generate power. The power indicator will be light up and the real-time power will be displayed on the screen.

Monitoring Device Installation

Insert the module into the COM port at the inverter bottom and pay attention to the direction of the module when assembling (the side with indicator light is facing up). A “click” sound heard represents the assembly is in place.sunways -STS 3-6kW -Series- Grid-connected- PV- Inverter -Single
-Phase- Dual- MPPT- 11

For first time use, the WiFi module needs to be configured. Follow-ing the “WiFi Configuration Guide” below. If the WiFi password has changed. The WiFi dongle will need to be reconfigured.

WiFi module configuration guide

  1. WiFi module configuration.

    • Insert the WiFi module into the COM port at the bottom of the inverter and power on the inverter.
    •  Using a laptop or Smartphone and turn on the WLAN connection.
    • Search for the WiFi name “sunways-WiFi****” (*represents the last 8 numbers of the inverter SN) and click the WiFi name.
    • WiFi connection succeeded as shown in Figure 17.
  2. Open the Website http://10.10.100.254, see the following picture, the username and password are all “admin” and click “Sign in”.sunways -STS 3-6kW -Series- Grid-connected- PV- Inverter -Single -Phase- Dual- MPPT- 13

  3. Log in to the “System” interface.
    Note: Click the “Chinese/English” in the upper right corner to switch the interface language.

  4. Select “STA setting” and click “Scan”. A list of WiFi network will show up.sunways -STS 3-6kW -Series- Grid-connected- PV- Inverter -Single -Phase- Dual- MPPT- 14

  5. Select the household’s WiFi name and click “OK”.
    Note: Only support 2.4GHz WiFi.

  6. In the pop-up window, click “OK” to key in the WiFi password.sunways -STS 3-6kW -Series- Grid-connected- PV- Inverter -Single -Phase- Dual- MPPT- 15

  7. Input the password in the blank and click “Save”.
    Note: Password is case sensitive.

  8. The system will show “Saved Successfully!”, click “Restart” to complete the WiFi configuration.sunways -STS 3-6kW -Series- Grid-connected- PV- Inverter -Single -Phase- Dual- MPPT- 16

  9. After the reboot, the green indicator on the WiFi module will be always on.

References