Hunter 19807 4 Light Chandelier Instruction Manual
- June 3, 2024
- Hunter
Table of Contents
Hunter 19807 4 Light Chandelier
INSTALLATION
PREPARING FOR INSTALLATION
Carefully remove all contents from the carton. Shut off the power at the
circuit breaker and completely remove the old fixture from the ceiling,
including the old mounting bracket. Remove the new mounting bracket assembly
from the bag. One end of the threaded post (D) should be attached to the
mounting bracket (A) with a hex nut (E) in place. The other end should have
the canopy loop (G) attached. Unscrew the canopy loop ring (H) from the canopy
loop (G). Depending on the placement of your junction box the position of
threaded post (D) may need to be adjusted to allow the canopy to be flush with
the ceiling. Determine this by lifting mounting bracket (A) up to the junction
box and place canopy (F) over the canopy loop (G), so that it is flush with
the ceiling. Adjust the position of threaded post (D) on the mounting bracket
(A) so that the canopy (F) covers at least half of the exterior threads on the
canopy loop (G) while it is securely connected to threaded post (D). The
threaded post (D) can be adjusted by loosening hex nut (E) to allow movement
of threaded post (D) on mounting bracket (A). Once the ideal position of the
threaded post (D) is determined, tighten up the hex nut (E) onto the threaded
post (D) just beneath the mounting bracket (A) to secure the threaded post in
place.
ASSEMBLING THE FIXTURE
Attach cleat (R) to the threaded post on the bottom of fixture (Q) making sure
that the corners of (R) are positioned between the socket arms. Thread wires
through and screw rod (O) to threaded post on the top of fixture (Q). Slide
cleat (N) and cross plate (M) over threaded post of rod (O). Slide frame piece
(P) into slots on cleats (R, N). Secure cross plate (M) onto frame piece (P)
with screw (L). Do not fully tighten screws (L) until all frame pieces (P) are
in place. Thread wires through and screw hanging ring (K) onto threaded post
of rod (O). Fit cleat plate (S) over cleat (R), place cover (T) over cleat
plate (S), and secure with a finial (U). By measuring, determine the correct
number of chain links needed for proper hanging height. To shorten the
fixture, trim the wires to the desired length. Leave at least 8 to 10 inches
of wire in addition to the desired length. If necessary, use a pair of pliers
to open and remove any excess chain. Attach one quick-connect link (J) to each
end of the chain (I). Use one quick-connect link (J) to attach chain (I) to
the hanging ring (K) and securely close it. Feed the fixture wires up through
the chain (every three links or so) pulling the wires until taut. Slide canopy
loop ring (H) and canopy (F) onto the chain/wire and thread wires through
canopy loop (G). Use the remaining quick-connect link (J) to attach chain (I)
to the canopy loop (G). Have a helper support the fixture’s weight and attach
the mounting bracket (A) to the junction box by securely tightening the
mounting screws (C).
CONNECTING THE WIRES
Attach the fixture’s wires to the power supply wires from the junction box.
Connect black to black (Live); white to white (grounded); grounding to
grounding (green or copper). Twist the ends of the wire pairs together. Then,
twist on a wire connector. Make sure all twists are in the same direction.
Loop the fixture’s ground wire around the grounding screw (B) and tighten it.
If there is no ground wire (green or copper) from the junction box, contact a
qualified electrician.
FINISHING THE INSTALLATION
Place the canopy (F) flush to the ceiling and slide the canopy loop ring (H) up beneath the canopy. Tightly screw the canopy loop ring (H) onto the canopy loop (G) to properly secure the canopy (F) in place. Install light bulbs (not included) in accordance with the fixture’s specifications. Do not exceed the recommended wattage. Your installation is now completed. Turn on the power and test the fixture.
CLEANING TIPS
Treat the fixture gently! Regular cleaning will reduce the need for deep cleaning. For regular cleaning, turn off the light and wipe down the fixture with a clean lint-free cotton or microfiber cloth. Never spray the cleaner directly onto the fixture.
TOOLS
Here are the tools you’ll need to complete your installation
- Ladder
- Screwdriver
- Pliers
- Wire Strippers
- 4 Light Chandelier
- Fixture weight +2 Ibs:
- Peso +2 lb:
- Poids fixe +2 lbs:
Hardware Service Kit/Kit De Mantenimiento Del Equipo/Trousse De Maintenance Quincaillerie
Part #/Pieza #/Pièce # Model/Modelo/Modèle Finish/Finish/Fini
Brushed Nickel/Níquel Pulido/
_KE99701214_ 19807 Nickel _Brossé_
Noble Bronze/Bronce Noble/
_KE99702834_ 19808 Bronze _Noble_
__
WARNING
- To avoid possible electrical shock, before installing your light fixture, disconnect the power by turning off the circuit breakers to the outlet box associated with the wall switch location.
- The lighting fixture must be grounded. If the ground wire for the installation site is not present, immediately STOP installation and consult a qualified electrician.
- All wiring must be in accordance with national and local electrical codes ANSI/NFPA 70. If you are unfamiliar with wiring or in doubt, consult a qualified electrician.
READ AND SAVE THESE INSTRUCTIONS These instructions are provided for your safety. It is very important that they are read carefully and completely before beginning the installation of the lighting fixture.
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>