ECOLAB MP – MA Dual Pressure Serien Advanced Main Station Installation Guide

June 4, 2024
ECOLAB

ECOLAB MP – MA Dual Pressure Serien Advanced Main Station

General information

For safety reasons it is important to read all of the enclosed information ( Installation guide, Service manual, Spare parts, Operating instructions) before mounting this equipment.. In addition, the legislation in force at the time of purchase must always be considered in connection with the installation and mounting of this equipment, no matter the contents of this manual.
If there are matters of dispute please contact your dealer.
This equipment is produced and tested by specially qualified personnel, following approved instructions to ensure our high level of product quality. After the product is finished and tested it is manually inspected with the ultimate test carried out just before the product is released for shipping. To obtain our high level of quality and long life we use stainless steel parts. These parts, in defiance of our manual inspections may still have some sharp edges, which can present a cut hazard. Therefore it is advised always to use protective gloves and show caution when installing the equipment.

Preparation

If the wall is made of bricks or concrete, the enclosed screws and rawl plugs are usable, otherwise you have to make sure that the carrying capacity of the wall is sufficient.
Note: The pipeline must be rinsed through before the system is connected. See service manual.
Please see ill. no 3 for further information on where to lift where unpacking and mounting the unit.
Note: Remove cover before the system is mounted on the wall.

Placing/application

  • Main station must be placed in frost free rooms only.
  • Free space around the main station: min 1500 mm.
  • Max. ambient temp. 40°C.
  • Non vibrating surface.

Water supply

| MP3, MA3| MP4, MA4| MP1..DP, MA1..DP
---|---|---|---
Water volume| 100 1/min.| 135 1/min| 135 1/min
Pressure| 2 – 8 bar| 2 – 8 bar| 2 – 8bar
Max. temperature| 70°C| 70°C| 70°C

The supply line must be sized so that it can supply the minimum indicated pressure and water volume when connected to this equipment.
Note: It is recommended to mount a mixing system on the water connection immediately before the outlet which is used.
Recomented water hardness 14-18 dH°.
If not supplied, filter should be mounted.

Air supply

Air supply for the system is to meet the following specifikations:

  • Pressure 5 – 10 bar
  • Consumption 200 Nl/min.

Power supply

Connection instruction is mounted on the cables.
The phase order is subordinated

Earth Leakage Circuit Breaker (ELCB).
When using an earth leakage circuit breaker (ELCB) also known as a residual current device (RCD) or a residual current circuit breaker (RCCB) in a system that incorporates a variable speed drive connected to 3 phase 400 V.
The trip level of the ELCB has to be 300 mA (30 mA used in house hold will malfunction due to earth leakage)
NB! Installation must always be in accordence with local legistration.

| MP3, MA3| MP4, MA4| MP1..DP, MA1..DP
---|---|---|---
Voltage:| 3/PE 400/480 V 320 -0%…528 +0%| 3/PE 400/480 V 320 -0%…528 +0%| 3/PE 400/480 V 320 -0%…528 +0%
Frequenz:| 50/60 Hz 48 -0%…62 +0%| 50/60 Hz 48 -0%…62 +0%| 50/60 Hz 48 -0%…62 +0%
Motor load:| 4 kW| 5.5 kW| 5.5 kW
Nominal current:| 10.6 A| 14.2 A| 14.2 A
Fuse:| 16 A| 20 A| 20 A
L1, L2, L3, PE| 2.5 mm2| 2.5 mm2| 2.5 mm2

Piping

The pipe system should be made of stainless steel pipes. The pipe joints should be made in a way that makes separation possible in case of e.g. repairs, movement or similar.

Pipe connections MP3, MA3 MP4, MA4 MP1..DP, MA1..DP
Water 5/4″ RG 5/4″ RG 5/4″ RG
Air 6 mm 6 mm 6 mm

Assembly

Dimensions see fig.1
It is recommended to mount the main station at an appropriate height (approx. 1 m above the floor) on a brick or concrete wall, according to the mounting instructions. To make the mounting easier, it is recommended to mark auxiliary lines on the wall according to fig. 2. The main station must be lifted in this way that the auxiliary point on the right of the cabinet is flush with the horizontal and the vertical auxiliary lines on the wall, after which the main station is hung over the fitting.
Tighten the main station with the enclosed screws and rawlplugs.

© 2005 All rights reserved
Ecolab GmbH & Co. OHG
P.O. Box 13 04 06
D-40554 Düsseldorf
www.ecolab.com
Tel.: +49 211 98 93 203 – Fax: +49 211 98 93 223

References

Read User Manual Online (PDF format)

Loading......

Download This Manual (PDF format)

Download this manual  >>

ECOLAB User Manuals

Related Manuals