BOSCH SSB255 SSB Gas-Fired Condensing Boiler Instruction Manual

June 3, 2024
Bosch

BOSCH SSB255 SSB Gas-Fired Condensing Boiler Instruction Manual

BOSCH SSB255 SSB Gas-Fired Condensing Boiler Instruction
Manual

Please read this entire document prior to proceeding with any work.

When replacing the fl ue pipe on an installed boiler follow the steps below before proceeding with replacement procedure:

  1. Shutoff and or isolate the external power supply.
  2. Shutoff and disconnect the gas supply pipe.
  3. Shutoff and disconnect the boiler’s supply and return piping.
  4. Drain water from the boiler then remove the tridicator gage, PRV and blow off piping.
  5. Remove the exhaust and combustion air pipes along with the vent adapter.
  6. Reverse steps after installing the stainless steel vent pipe and check system of for leaks.

WARNING:

♦ This bulletin is intended to provide technical guidance to a professional who is licensed and qualified to work on boiler products and components. If you are not qualified to work on such equipment, please obtain the services of such a professional.

WARNING: HAZARDOUS VOLTAGE

♦ Turn off or disconnect power to the boiler before proceeding with any work.

Background

These instructions will assist the installer in removing the boiler’s existing plastic fl ue pipe and replacing it with the stainless steel fl ue pipe component (see table below for part numbers).

BOSCH SSB255 SSB Gas-Fired Condensing Boiler -
Background

Table 1

  • This flue pipe is supplied in two pieces, which fit together when installed.

Removal of Existing Plastic Flue Pipe

7. Rotate the lock at the top on the front panel and remove the front panel as shown (fig.1).

BOSCH SSB255 SSB Gas-Fired Condensing Boiler - Figure
1

Figure 1

8. Remove the power supply connectors (white, black, and green wires) from the main power switch (fi g.2).

BOSCH SSB255 SSB Gas-Fired Condensing Boiler - Figure
2

Figure 2

9. Remove the flue gas probe from the existing plastic flue pipe (fi g.3).

2 | SSB Stainless Steel Flue Pipe – Retrofit Installation Procedure Technical Service Bulletin

BOSCH SSB255 SSB Gas-Fired Condensing Boiler - Figure
3

Figure 3

10. Unscrew the two screws that are located on the right and left sides under the boiler’s top-front panel, and remove the panel (fi g. 4 & 5).

BOSCH SSB255 SSB Gas-Fired Condensing Boiler - Figure
4

Figure 4

BOSCH SSB255 SSB Gas-Fired Condensing Boiler - Figure
5

Figure 5

11. Remove the Tridicator gauge (fig. 6).

BOSCH SSB255 SSB Gas-Fired Condensing Boiler - Figure
6

Figure 6

12. Remove the black plug from the system supply connector (fig.7).

BOSCH SSB255 SSB Gas-Fired Condensing Boiler - Figure
7

Figure 7

13. Unscrew the four screws located on top of the top-rear panel (fig.8).

BOSCH SSB255 SSB Gas-Fired Condensing Boiler - Figure
8

Figure 8

Technical Service Bulletin SSB Stainless Steel Flue Pipe – Retrofit Installation Procedure | 3

14. Disconnect the flexible gray pipe from the plastic air intake collar, and remove the top-rear panel (fi g.9 & 10).

BOSCH SSB255 SSB Gas-Fired Condensing Boiler - Figure
9

Figure 9

BOSCH SSB255 SSB Gas-Fired Condensing Boiler - Figure
10

Figure 10

15. Disconnect the existing plastic flue pipe from the condensate collector (fig.11).

BOSCH SSB255 SSB Gas-Fired Condensing Boiler - Figure
11

Figure 11

16. Remove the existing plastic flue pipe by pulling it up through the top of the boiler (fig.12).

BOSCH SSB255 SSB Gas-Fired Condensing Boiler - Figure
12

Figure 12

Installation of New Stainless Steel Flue Pipe

  1. Insert the new stainless steel flue pipe down through the top of the boiler (fig.13).
    BOSCH SSB255 SSB Gas-Fired Condensing Boiler - Figure
13
    Figure 13

  2. Connect the flue pipe into the condensate collector (fig.14).
    Fully and carefully insert the male end of the pipe into the female end.
    Be sure gasket stays in groove/position while inserting.
    BOSCH SSB255 SSB Gas-Fired Condensing Boiler - Figure
14
    Figure 14

  3. Reinstall the top-rear panel. Reconnect the flexible gray pipe to the air intake and tighten clamp (fig.15).
    BOSCH SSB255 SSB Gas-Fired Condensing Boiler - Figure
15
    Figure 15

  4. Connect the new stainless steel flue pipe to the plastic exhaust collar (fig.16).
    BOSCH SSB255 SSB Gas-Fired Condensing Boiler - Figure
16
    Figure 16

  5. Tighten down the top-rear panel’s four screws (fig.17).
    BOSCH SSB255 SSB Gas-Fired Condensing Boiler - Figure
17
    Figure 17

  6. Reinstall the top-front panel and tighten the two screws (fi g.18 & 19).
    BOSCH SSB255 SSB Gas-Fired Condensing Boiler - Figure
18
    Figure 18
    BOSCH SSB255 SSB Gas-Fired Condensing Boiler - Figure
19
    Figure 19

  7. Install the flue gas probe into the new stainless steel pipe (fig. 20).
    BOSCH SSB255 SSB Gas-Fired Condensing Boiler - Figure
20
    Figure 20

  8. Reconnect the power and ground wires to the switch (fig.21).
    BOSCH SSB255 SSB Gas-Fired Condensing Boiler - Figure
21
    Figure 21

  9. Using Loctite 542, reinstall the Tridicator gauge (fig.22).
    BOSCH SSB255 SSB Gas-Fired Condensing Boiler - Figure
22
    Figure 22

  10. Reinstall the black plug (fig.23).
    BOSCH SSB255 SSB Gas-Fired Condensing Boiler - Figure
23
    Figure 23

  11. Close the boiler’s front panel. If boiler was installed, reconnect the boiler’s electric power and gas supply, pressurize the boiler’s internal water and reconnect existing venting. Test run the boiler to check for flue gas leaks or condensation leaks.
    a. If no leaks are present, the work is complete.
    b. If leaks are present, check the connections and reseat and/or tighten where needed. Run the boiler and again check for leaks.

Bosch Thermotechnology Corp.
65 Grove Street
Watertown, MA 02472
Tel: 1-866-642-3198
Fax: 1-603-965-7581
www.bosch-thermotechnology.us

References

Read User Manual Online (PDF format)

Loading......

Download This Manual (PDF format)

Download this manual  >>

Bosch User Manuals

Related Manuals