COMMSCOPE SFG23RHDXL13 Guy Tower Sector Frame Installation Guide

June 1, 2024
CommScope

CommScope SFG23RHDXL13 Guy Tower Sector Frame

COMMSCOPE-SFG23RHDXL13-Guy-Tower-Sector-Frame-
product

Specifications

  • Model: SFG23RHDXL13-4-96
  • Dimensions: 120″ (H) x 156″ (L) x 120″ (W)
  • Mass: 1018.51 lbs
  • Volume: 3592.65
  • Surface Area: 30869.05

Product Usage Instructions

General Notes

Ensure all metric dimensions are interpreted as [X.X]. For patent information, visit https://www.cs-pat.com.

Design Notes

Prior to installing the appurtenance, identify any hazards or obstructions to the climbing facility and safety climb. Additional products may be needed to maintain safety. During installation, take temporary and/or permanent precautionary measures to preserve the climbing facility and/or safety climb.

Tighten all bolts securing flat plates using the turn-of-nut method. U-bolts should also be tightened using the turn-of-nut method, ensuring equal distance and force on each leg of the U-bolt.

Test

No specific test instructions are provided in the manual extract.

Packaging

The packaging must meet CommScope requirements as per document IS-PL-3005. Printed documents should be placed inside a polybag before placing them in the shipping container. Extra hardware may be supplied, bagged, and shipped.

GENERAL NOTES

  1. ALL METRIC DIMENSIONS ARE IN BRACKETS [X.X]
  2. FOR PATENT INFO: https://www.cs-pat.com

DESIGN NOTES

  1. ANY HAZARDS OR OBSTRUCTIONS TO THE CLIMBING FACILITY AND SAFETY CLIMB MUST BE IDENTIFIED PRIOR TO INSTALLING THE APPURTENANCE. ADDITIONAL PRODUCTS MAY BE REQUIRED TO MAINTAIN THE INTEGRITY OF THE SAFETY CLIMB. DURING INSTALLATION, TEMPORARY AND/OR PERMANENT PRECAUTIONARY MEASURES SHOULD BE TAKEN TO PRESERVE THE CLIMBING FACILITY AND/OR SAFETY CLIMB.
  2. UP TO 5.0° TAPER AVAILABLE ON MODELS THAT SUPPORT ADJUSTMENT

MANUFACTURING/SPECIAL REQUIREMENTS

TIGHTEN ALL BOLTS SECURING FLAT PLATES BY THE TURN-OF-NUT METHOD. TIGHTEN ALL U-BOLTS USING THE TURN-OF-NUT METHOD WITH ATTENTION TO LEAVING EQUAL DISTANCE AND EQUAL FORCE ON EACH LEG OF THE U-BOLT.

TEST

PACKAGING

  1. PACKAGING SHALL MEET COMMSCOPE REQUIREMENTS PER DOCUMENT IS-PL-3005.
  2. PRINTED DOCUMENTS ARE TO BE PLACED INSIDE A POLYBAG AND THEN IN A SHIPPING CONTAINER.
  3. EXTRA HARDWARE MAY BE SUPPLIED, BAGGED AND SHIPPED.

COMMSCOPE-SFG23RHDXL13-Guy-Tower-Sector-Frame-fig-1 COMMSCOPE-SFG23RHDXL13-Guy-Tower-Sector-Frame-
fig-2 COMMSCOPE-SFG23RHDXL13-Guy-Tower-Sector-
Frame-fig-3 COMMSCOPE-SFG23RHDXL13-Guy-
Tower-Sector-Frame-fig-4 COMMSCOPE-
SFG23RHDXL13-Guy-Tower-Sector-Frame-fig-5 COMMSCOPE-SFG23RHDXL13-Guy-Tower-Sector-Frame-
fig-6

ACCESSORIES ORDERED SEPARATELY

COMMSCOPE-SFG23RHDXL13-Guy-Tower-Sector-Frame-fig-7

FAQ

Q: Are additional components required for installation?

A: The manual specifies the included parts for assembly purposes. Individual components may be shipped separately within the kit.

References

Read User Manual Online (PDF format)

Loading......

Download This Manual (PDF format)

Download this manual  >>

CommScope User Manuals

Related Manuals