Sentinel 443028 Kinetic MVHR Range Plus B Heat Recovery Unit
Specifications :
- Product Name: Sentinel Kinetic MVHR Range
- Models: Sentinel Kinetic, Sentinel Kinetic F, Sentinel Kinetic Plus, Sentinel Kinetic High Flow
- Condensate Drain: Available on right or left-hand side
Product Description:
The Sentinel Kinetic MVHR Range includes models such as Sentinel Kinetic,
Sentinel Kinetic F, Sentinel Kinetic Plus, and Sentinel Kinetic High Flow.
These units are designed with the option of having the condensate drain on
either the right or left-hand side for flexibility during installation.
Installation:
- Refer to the provided installation guide for detailed instructions on setting up the unit.
- Ensure proper positioning of the condensate drain based on the chosen model (right or left-hand side).
- Follow the wiring diagrams provided for optimal performance.
Wiring Instructions:
For wiring the Sentinel Kinetic MVHR unit, follow the wiring options
provided below based on your setup:
Option 1 – Mains Voltage Boost Switch Diagram:
- Connect the necessary cables as per the diagram.
- Ensure proper connection to the ‘BMS’ port and use a 3 pole isolator if applicable.
- Position the mains boost switch outside designated zones for safety.
Option 2 – Low Voltage Boost Switch Diagram:
- Use recommended cable types and connect to the SW4 connection only.
- Follow the diagram for correct wiring of the low voltage boost switch.
FAQ:
-
Q: Can I install the unit without professional help?
A: It is recommended to have a qualified technician install the Sentinel Kinetic MVHR unit to ensure proper setup and performance. -
Q: Where should I position the boost switch?
A: The boost switch should be positioned outside zones such as bathrooms for safety reasons.
Quick installation guide
- Power 3 Amp Switched Spur beside Unit
- Controller wire 15m of 4 core cable with RJ connection on one side supplied with controller
- Controller connection RJ plug fitted to terminal board marked BMS
- Volt Free Boost Momentary boost switch from bathrooms – 2 core 0.5 to SW4 terminal
- Switched Live boost 240 switch live to black wire on fly lead or LS terminal (additional re lay may be required)
- Condensation Drain 22mm on unit to be connected to waterless trap and 32mm waste pipe
- Orientation Right and Left hand models available (can be converted on site if required)
- Spigot installation The spigots can be position on top or side of unit
Product Description
- Sentinel Kinetic, Sentinel Kinetic F, Sentinel Kinetic Plus & Sentinel Kinetic High Flow
- Units are available with the condensate drain on the right or left hand side.
Installation
Vent Axia Sentinel Kinetic MVHR Wiring
Option 1 – Mains Voltage Boost Switch Diagram
Mains Boost Switches MUST be positioned outside zones e.g. outside bathroom etc
Option 2 – Low Voltage Boost Switch Diagram
All boost switches are to be wired to the SW4 connection only.
BPC Ventilation Ltd
- 8 Redlands Road
- Larne
- BT40 lAX
- T: 028 2827 5150
- E: info@bpcventilation.com
- W: www.bpcventilation.com
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>