TS02 Floor Standing Sheet Metal Folder
Thank you for purchasing a Sealey product. Manufactured to a high standard,
this product will, if used according to these instructions, and properly
maintained, give you years of trouble free performance.
IMPORTANT: PLEASE READ THESE INSTRUCTIONS CAREFULLY. NOTE THE SAFE
OPERATIONAL REQUIREMENTS, WARNINGS & CAUTIONS. USE THE PRODUCT CORRECTLY AND
WITH CARE FOR THE PURPOSE FOR WHICH IT IS INTENDED. FAILURE TO DO SO MAY CAUSE
DAMAGE AND/OR PERSONAL INJURY AND WILL INVALIDATE THE WARRANTY. KEEP THESE
INSTRUCTIONS SAFE FOR FUTURE USE.
SAFETY
- Wear approved safety goggles, gloves, and footwear, when operating the folder. Your local Sealey dealer offers a complete range of safety equipment.
- Use the tool only for its intended purpose.
- Regularly check all parts of the folder for damaged parts. DO NOT use if any of its components are broken, worn or damaged.
- Use original Sealey spare parts and accessories. Use of non-recommended spare parts may be dangerous and will invalidate warranty.
- Ensure good footing, wear non slip footwear.
- DO NOT operate this tool while under the influence of drugs, alcohol or other impairing medication.
- DO NOT Allow unqualified persons to operate the metal folder. Keep children away from the tool.
INTRODUCTION
Floor standing sheet metal folder, fitted with mounting plates. Capable of bending a 1mm rod, of limited length, up to and beyond a 90° angle. The unique patented endless design and removable folding plate allows the user to fold, channel and offset any length of sheet metal up to 20 Gauge thick, by simply moving the sheet as required after each fold. With adjustable fold plate to help achieve the cleanest fold possible. Ideal for the small garage or restoration operation.
SPECIFICATION
MODEL NO: | TS02 |
---|---|
Capacity | 20 Gauge Sheet, Ø1mm Rod |
1 | Top/Base plate clamp |
---|---|
2 | Adjustment/Positioning |
3 | Removable Folding Plate |
4 | Centre adjustment nut |
5 | Top Plate |
6 | Standing plate |
7 | Folding Handles |
OPERATION
41. Unpack the unit and check that all parts are included and not damaged.
Should you experience a problem contact your supplier immediately.
4.2. Position folder where it is to be mounted, ensuring that the handles
fig.1.7 hang vertically over the front of the floor space so as can be used
without obstruction, use plates to steady during use fig.1.6.
4.3. By using centre adjustment nut fig.1.4 ensure top and base plate are
parallel, this may require adjustment from time to time. 44. Release clamps
fig.1.1 at either end of folder so that as mall test piece of sheet metal can
be inserted between the top and base plates. fig.1.3
45. Position the test piece, adjust the top plate by use of clamps fig.1.1
lightly tighten, use a spanner to adjust cam fig1.2, so that base and top
plate are aligned.
46. Ensure that there is even pressure on both ends.
47. Raise the top folding plate fig.1.3 by lifting handles to create the
fold. From this test, you will be able to determine how and where the fold
appears. When satisfied with the test results, proceed with the actual
workpiece.
48. By rotating the end clamps through the vertical axis, longer lengths of
metal sheet can be folded, i.e. fold a section, unclamp, move sheet, reclamp,
fold second section etc.
**ENVIRONMENT PROTECTION**
Recycle unwanted materials instead of disposing of them as waste. All tools,
accessories and packaging should be sorted, taken to a recycling centre and
disposed of in a manner which is compatible with the environment. When the
product becomes completely unserviceable and requires disposal, drain any
fluids (if applicable) into approved containers and dispose of the product and
fluids according to local regulations.
Note: It is our policy to continually improve products and as such we
reserve the right to alter data, specifications and component parts without
prior notice.
Important: No Liability is accepted for incorrect use of this product.
Warranty: Guarantee is 12 months from purchase date, proof of which is
required for any claim.
Sealey Group, Kempson Way, Suffolk Business Park, Bury St Edmunds, Suffolk.
IP32 7AR
01284 757500
01284 703534
sales@sealey.co.uk
www.sealey.co.uk
© Jack Sealey Limited
TS02 Issue 2 (H) 24/10/22
Original Language Version
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>