WATCHDOG v3 CB NXT Control Board User Guide

June 17, 2024
WatchDog

WATCHDOG v3 CB NXT Control Board

Product Specifications:

  • Model: WatchDog NXT Control Board v3
  • Compatible with: WatchDog NXT models
  • Components: Various sensors, cables, power terminals

Product Usage Instructions

Step 1: Remove Control Board Cover
Remove the two screws from the control board cover and lift off the cover.

Step 2: Unplug Wires
Use needle nose pliers to unplug the wires from the control board.

Step 3: Remove Control Board
Use a screwdriver or drill to remove the 4 screws holding the control board in place (one in each corner).

Step 4: Install Replacement Control Board
Lift the control board out and set it aside. Insert the replacement control board. Reverse the process to install the board – insert the screws, rewire according to the wiring diagram on page 4, and replace the control board cover.

FAQ:

Q: What should I do if I encounter difficulties when unplugging the wires?
A: If you have trouble unplugging the wires, gently wiggle them while pulling with the needle nose pliers to avoid damaging the connectors.

Q: Can I use a power drill to remove the screws?
A: Yes, you can use a power drill to remove the screws, but be cautious not to overtighten or strip them when reinstalling.

Tools:

  • Phillips Head Screwdriver
    -OR-

  • 2 Phillips Drill (Optional)

  • Needlenose Pliers (Optional)

  • Replacement Control Board

INSTRUCTION

  1. Using a drill or screwdriver, remove the screws on the side panel so you have access to the control board (the side opposite the drain).WATCHDOG-v3-CB-NXT-Control-Board-1
  2. Remove the two screws from the control board cover and lift off the cover.WATCHDOG-v3-CB-NXT-Control-Board-2
  3. At this point you will need to unplug the wires from the control board (needle nose pliers can be helpful)WATCHDOG-v3-CB-NXT-Control-Board-3
  4. Next, use a screwdriver or drill to remove the 4 screws holding the control board in place (one in each corner).
  5. Finally, lift the control board out and set aside. Insert the replacement control board. Reverse the process to install the board- insert the screws, rewire (see wiring diagram on page 4), and replace control board cover.

WatchDog NXT Control Board v3

WATCHDOG-v3-CB-NXT-Control-Board-6

  1. Pump Sensor (water level)
  2. Pump Sensor (error code)
  3. Coil Sensor
  4. RH Sensor
  5. Display Cable
  6. Cat 5 Cable (remote)
  7. Thermostat Terminal
  8. 115V Power
  9. Compressor Capacitor (red)
  10. Fan (red or brown, neutral)
  11. Fan Capacitor (blue, neutral)
  12. Compressor (black, neutral)
  13. 115V Power (white, neutral)
  14. Terminal Auxillary Power (black/white wire )
  15. Valve, unused on NXT models
  16.  Terminal Pump Connector (blue/brown wire)

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

WatchDog User Manuals

Related Manuals