DAWNYIELD 3 Tier Golden Bar Cart Instruction Manual
- June 17, 2024
- DAWNYIELD
Table of Contents
DAWNYIELD 3 Tier Golden Bar Cart
Specifications
- Product: 3-Tier Bar Cart
- Components: A to W as listed in the manual
- Assembly Tools: Allen wrench, screws of various sizes
- Dimensions: Varies based on assembly
- Material: Iron, Wood
- Color: Black
Product Usage Instructions
Assembly Steps:
- Mount the four casters (N) on the bottom.
- Connect side racks (A & B) with long iron pipes (C) using M6x30mm screws (Q).
- Install board (I-2) at the bottom using M6x20mm screws (P).
- Install long pipes without holes (C) between side racks and one long pipe with raised section (D).
- Install the middle vertical rack (K) with M6x30mm screws (Q).
- Install Small Board (J) with ST7x40mm screws (R) and short iron pipes with no holes (F) on top.
- Secure the W-shaped rack (L) between the middle vertical rack and side rack with M6x12mm screws (O).
- Fix cup racks (U) on the top board (I-1) with self-tapping screws (V).
- Install long iron pipes with one hole (G) and top board (I-1).
- Install cart handle rail (M) and long iron pipes without holes (C).
Note: Please refer to the manual for detailed instructions and illustrations.
Frequently Asked Questions (FAQ)
-
Q: What are the dimensions of the assembled bar cart?
A: The dimensions may vary based on assembly, please refer to the manual for specifics. -
Q: Can the bar cart be disassembled for storage?
A: Yes, you can disassemble the bar cart following the reverse of the assembly steps. -
Q: How should I clean the bar cart?
A: Use a damp cloth to wipe down the surfaces. Avoid harsh chemicals that may damage the material.
3-Tier Bar Cart Installation Steps
Important Assembly Advice
- In order to avoid the situation that some parts cannot be installed, please make sure to follow the correct installation order.
- Parts of assembly will be MUCH EASIER with 2 people.
- Please keep a mild tightness on all the screwing during assembly. After the whole bar cart is assembled, firmly tighten all the screws.
Components
Assembly Instructions
Step 4
- Install two long pipes wither with M6x30mm screws (Q) in
- Install one long pipe with ram M6x30mm screws (Q). Insert t the raised section on pipe (Da
Step 10
- Install cart handrail (M) with M6x20mm screws (P).
- Install two long iron pipes without hole (C) by M6x30mm screws (Q).
AFTER-SALES CONTACT: (1)646 820 2494
Monday to Saturday: 9:00am to 18:00pm
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>