COPELAND CC200 Expansion Module User Guide
- June 17, 2024
- Copeland
Table of Contents
COPELAND CC200 Expansion Module
Specifications
- Power: Powered From Expansion Port of CC200 Main Controller
- Ambient Operating Temperature: 20-85% RH; non-condensing
- Power Supply: 24VDC, max 20W PELV (Class 2 Source)
- Enclosure Dimensions: 110mm x 183mm (4 5/16 x 7 3/16)
- Valve Type:
- Pulse Valve: 24/120/230VAC, 20W Max
- Unipolar Valve: 12VDC, max 300mA/Phase (Class 2 circuit)
- Bipolar Valve: 12VDC, max 500mA/Phase (Class 2 circuit)
- Construction: DIN rail mounting control to be incorporated in Class I or Class II appliances
- Rated Impulse Voltage: 2500V
- Pollution Degree: 2
- Over-voltage Category: II
- Type of Action: 1.C
Product Usage Instructions
Step 1: Determine if you need an Expansion Module
An Expansion Module should be added for a second or third coil. Each coil
will have temp sensors and a transducer and will be wired to the respective
Expansion Module.
Step 2: Addressing the Expansion Module
Set the address of each Expansion Module:
- – Expansion Module one must be set to address 1 (Position 1 up)
- – Expansion Module two to address 2 (Position 2 up)
- – Expansion Module three to address 3 (Positions 1 and 2 up)
Step 3: Install the Expansion Module
Make sure power is OFF to the CC200 Main
Controller. Power will be restored in a later step.
Install Expansion Module 1:
- – Install on the DIN rail adjacent to the CC200’s right side.
- – Align Expansion port terminals V+, V-, LAN+, and LAN- with Expansion Module 1 terminals.
- – Slide the Expansion Module into the CC200 Expansion port so both devices fasten together.
Connect Expansion Modules 2 and 3 if present.
Step 4: Terminate sensors on the Expansion Module
- a. Terminate sensors according to the CC200 manual.
- b. Once terminations are complete and ports are connected, restore power to the CC200 Main Controller. The Expansion
Module’s PWR ON LED will illuminate green indicating supply power is present.
FAQ
For Technical Support:
Call: 833-409-7505 or Email:
ColdChain.TechnicalServices@copeland.com
For the full user manual, scan the QR
code: 026-4715 | R8 |V1023 copeland.com
The CC200 Expansion Module is built with the necessary onboard IO to add additional IO for modular coil case designs or multi-evaporator walk-in boxes.
- One TRIAC for control of PWM (pulse width modulation) EEV valve or one stepper motor control for EEPR stepper or EEV stepper.
- One digital input: user-configurable purposes.
- One pressure input for suction pressure transducer.
- Three color-coded temperature inputs for discharge air, return air, and defrost termination plus coil out temperature.
- Expansion port connector for easy connection to CC200 Main Controller
Specifications
Mounting and Installation
-
Step 1: Determine if you need an Expansion Module.
-
An Expansion Module should be added for a second or third coil. Each coil will have temp sensors and a transducer and will be wired to the respective Expansion Module.
-
Step 2: Addressing the Expansion Module.
-
Set the address of each Expansion Module using the ON/OFF dip switch bank on the top left corner of the hardware.
-
Expansion Module one must be set to address 1
-
(Position 1 up), Expansion Module two to address 2
-
(Position 2 up), Expansion Module three to address 3 (Positions 1 and 2 up).
-
Step 3: Install the Expansion Module.
-
Make sure power is OFF to the CC200 Main Controller. Power will be restored in a later step.
-
Install Expansion Module 1 on the DIN rail adjacent to the CC200’s right side. The CC200 Expansion port terminals V+, V-, LAN+ and LAN- will be aligned with Expansion Module 1 Expansion port terminals. Slide the Expansion Module into the CC200 Expansion port so both device’s Expansion port connectors fasten together.
-
If Expansion Modules 2 and 3 are present, connect to Expansion Module 1’s Expansion port using the same manner described in the above step.
No wiring is needed between the CC200 Main Controller and CC200 Expansion Module. Power and communication are sourced from the CC200 Expansion port and passed through each Expansion Module Expansion port. -
Step 4: Terminate sensors on the Expansion Module and refer to the drawing and specifications in the CC200 manual for terminal numbers and how to terminate.
-
Once all sensor terminations are complete and the Expansion Module Expansion port is securely plugged into the CC200 Expansion port, restore the 24VDC supply power to the CC200 Main Controller. Once connected, the Expansion Module PWR ON LED will illuminate green indicating supply power is present.
For Technical Support
Call: 833-409-7505 or
Email:
ColdChain.TechnicalServices@copeland.com
For the full user manual, scan the QR code:
The contents of this publication are presented for informational purposes only and they are not to be construed as warranties or guarantees, express or implied, regarding the products or services described herein or their use or applicability. Copeland reserves the right to modify the designs or specifications of such products at any time without notice. Responsibility for proper selection, use and maintenance of any product remains solely with the purchaser and end-user. ©2023 Copeland is a trademark of Copeland LP.
References
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>