Enerlites 975510-C-D Two Gang Brass Floor Box with TRWR Plug and Datacom Instruction Manual
- June 17, 2024
- ENERLITES
Table of Contents
Enerlites 975510-C-D Two Gang Brass Floor Box with TRWR Plug and Datacom
Instruction Manual
SPECIFICATIONS
Cover Material: Brass(C), Nickel-Plated Brass(S), Stainless Steel (SS)
Receptacle Rating: 20A 125VAC
Box Material: Galvanized Steel
Knockout size: 1/2″ and 3/4″
Adjustable Height: up to 1″ depth
DESCRIPTION/ FEATURES
Included is a Two gang floor box assembly with a tamper & weather resistant 20 amp duplex receptacle and data com, FB-06 box, gasket and cover.
- Compact and stylish design with adjustable height function metal box with the choice of Brass(C), Nickel-Plated Brass(S) or Stainless steel (SS).
- Corrosion resistant hardware ensure long life span and reliable performance. Easy access to power when you need it.
- Used for carpet and wood floors.
WARNING
Turn the POWER OFF at the circuit breaker before installing the Floor
Box
Read and understand these instructions before installing. This device is intended for installation in accordance with the National Electric Code and local regulations. It is recommended that a qualified electrician performs this installation. Make sure to turn off the circuit breaker or fuse(s) and make sure power is off before wiring the device. Use copper wire only, or equivalent.
NOTES:
10-12 AWG Stranded or Solid Copper wire is recommended.
DIMENSIONS
Cover Plate
Box
FLOOR BOX INSTALLATION
Before Installation:
Ensure there is sufficient depth & space below the subfloor.
Step 1
For carpeted floors:
Cut out a section of carpet smaller than the size of the cover.
For wood sub-floors and finished hardwood floors:
- Tape the template on the area you want to place the floor box.
- Use a knife to cut the outline of the box. Start with the ears and move inwards.
- Following the outline, cut the box shape without the ears completely through the sub-floor or hardwood floor.
- Following the outline, cut 3/8″ deep into the sub-floor or hardwood for the mounting ears.
- Using a router is recommended
- Using a router is recommended
Step 2
- Remove knockouts and secure the box onto the floor. Pull the wires through the opening of the floor and the knockout and connect the wires based on the wiring diagram.
- Use the proper connector/ clamp at the knockouts to secure the wires and to avoid accidental wire stripping.
- Secure the box to the opening using wood screws.
WIRING DIRECTIONS
WARRANTY INFORMATION
This device is warranted to be free of material and workmanship defects for 2
years from the date of purchase.
Original receipt or proof of purchase from an authorized retailer must be
presented upon warranty claim. ALL
claims must be verified and approved by Energies, Inc. Warranties from other
Energies products may vary. This warranty is nontransferable and does not
cover normal wear and tear or any malfunction, failure, or defect resulting
from misuse, abuse, neglect, alteration, modification, or improper
installation. To the fullest extent permitted by the applicable state law,
Energies shall not be liable to the purchaser or end user customer of Energies
products for direct, indirect, incidental, or consequential damages even if
Energies has been advised of the possibility of such damages. Energies’ total
liability under this or any other warranty, express or implied, is limited to
repair, replacement or refund. Repair, replacement or refund are the sole and
exclusive remedies for breach of warranty or any other legal theory.
© 2018 Energies Inc. CA,
U.S.A.
WWW.ENERLITES.COM
0207180124-01
REV 20230802
References
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>