Product Information

Specifications

  • Product Name: ip00 modules
  • Frames: fr9 to fr14
  • Release Date: 28.02.2019

Delivered Modules / Installing AC Chokes and Power Module

Products Included in the Delivery

The following products are included in the delivery:

  • Power module
  • AC choke
  • Control unit

Note : In FR9, the AC choke is inside the power module.

Lifting the Power Module

To lift the power module, follow these steps:

  1. Place the lifting hooks symmetrically in at least two holes.
  2. Ensure that the lifting devices can carry the weight of the module.

Installing the Power Module

To install the power module, consider the following measurements:

Frame| Device Width A/mm| Supporting Bar Range B/mm| Recommended Cabinet Width C/mm
---|---|---|---
FR9| 480| A – 50 mm| 600
FR10| 500| A – 50 mm| 600
FR11| 709| A – 20 mm| 800
FI9| 239| A – 50 mm| 400
FI10| 239| A – 50 mm| 400
FI12| 478| A – 50 mm| 600
FI13| 708| A – 50 mm| 800

Note: For detailed drawings, refer to the manual.

Ventilation

Steering the Internal Air Flow

To steer the internal airflow, consider the following:

  • Ensure that outgoing air is directed out of the cabinet to avoid mixing with incoming cooling air.

Arranging Ventilation of the Enclosure

To arrange ventilation of the enclosure, follow these guidelines:

  1. Ensure the closure is well-ventilated to keep the temperature below the maximum operating temperature.
  2. Repeated overheating will shorten the lifetime of the converter.

FAQ (Frequently Asked Questions)

DELIVERED MODULES / INSTALLING

AC CHOKES AND POWER MODULE

Products included in the deliveryDanfoss-FR9-VACON-NXP-Air-Cooled-
fig-1
NOTE! FR12 = 2 x FR10; FI14 = 2 x FI13 power modules.
NOTE! In FR9, the AC choke is inside the power module.

Lifting the power module

c Weight kg
FR9 146
FR10 123
FR11 210
FI9 65
FI10 100
FI12 200
FI13 302

NOTE! Place the lifting hooks symmetrically in at least two holes. The lifting devices must be able to carry the weight of the module.
NOTE! The maximum allowed lifting angle is 45°.

Installing the power module

Danfoss-FR9-VACON-NXP-Air-Cooled-fig-3

Frame| Device width A/mm| Supporting bar range B/mm| Recommended cabinet width C/mm
---|---|---|---
FR9| 480| A – 50 mm| 600
FR10| 500| A – 50 mm| 600
FR11| 709| A – 20 mm| 800
FI9| 239| A – 50 mm| 400
FI10| 239| A – 50 mm| 400
FI12| 478| A – 50 mm| 600
FI13| 708| A – 50 mm| 800

NOTE! For detailed drawings, see the manual

VENTILATION

Steering the internal airflow

NOTE! Outgoing air must be directed out of the cabinet so that it does not mix with incoming cooling air.

Arranging ventilation of the enclosure

CAUTION! It is of utmost importance for the operation and lifetime of the frequency converter that the closure is well-ventilated to keep the temperature below the maximum operating temperature. Repeated overheating will shorten the lifetime of the converter

Table 1. Ventilation requirements table

__

__

Frame

| __

Cooling air required m 3/h

| Minimum air hole on switchgear/dm 2
---|---|---
1) Inlet| 2) Outlet
FR9| 1300| 9.1| 7
FR10| 2000| 9.5| 5
FR11| 3000| 14| 7.5
FI9| 1150| 5.5| 3
FI10| 1400| 6.5| 4
FI12| 2800| 13| 7
FI13| 4200| 19.5| 10.5

GROUNDING AND CABLING THE UNIT

Connecting the internal power cable

Danfoss-FR9-VACON-NXP-Air-Cooled-fig-6

See the IP00 Module Installation Manual for details. NOTE! No external choke in FR9.

Installing the optical fibers

Installing the motor cable

contact

  • Vacon  Ltd
  • Member of the Danfoss Group
  • Runsorintie 7
  • 65380 Vaasa
  • Finland
  • www.danfoss.com

References

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals