Safety Precaution

General Disclaimer

  • The information in this quick installation guide is subject to change due to product updates or other reasons. This guide cannot replace the product labels or the safety precautions in the user manual unless otherwise specified. All descriptions here are for guidance only.
  • Before installations, read through the quick installation guide and the user manual to learn about the product and the precautions.
  • All installations should be performed by trained and knowledgeable technicians who are familiar with local standards and safety regulations.
  • Check the deliverables for correct model, complete contents, and intact appearance. Contact after sales service if any damage is found or any component is missing.
  • Use insulating tools and wear personal protective equipment when operating the equipment to ensure personal safety. Wear anti-static gloves, cloths, and wrist strip when touching electron devices to protect the inverter from damage.
  • Strictly follow the installation, operation, and configuration instructions in this guide and user manual. The manufacturer shall not be liable for equipment damage or personal injury if you do not follow the instructions. For more warranty details, please visit http://www.goodwe.com.
Safety Disclaimer

DC Side:

  1. Ensure the component frames and the bracket system are securely grounded.
  2. Connect the DC cables using the delivered DC connectors and terminals. The manufacturer shall not be liable for the equipment damage if other connectors or terminals are used.
  3. Ensure the DC cables are connected tightly and securely.
  4. Measure the DC cable using the multimeter to avoid reverse polarity connection. Also, the voltage should be under the permissible range (≤1100V).

AC Side

  1. The voltage and frequency at the connecting point should meet the on-grid requirements.
  2.  An additional protective device like the circuit breaker or fuse is recommended on the AC side. Specification of the protective device should be at least 1.25 times the AC output rated current.
  3. PE cable of the inverter must be connected firmly. The resistance between the neutral wire and the earth cable is less than 10Ω.
  4. You are recommended to use copper cables as AC output cables. Contact the manufacturer if you want to use aluminum cables.

Inverter Side:

  1. Terminals at the bottom of the inverter cannot bear much load. Otherwise, the terminals will be damaged.
  2. All labels and warning marks must be clear after the installation. Do not scrawl, damage or block any label on the device.
  3. Warning labels on the inverter are as following.
  • High voltage hazard. Power off the inverter first before any operations.
  • Read through the guide before any operations.
  • High temperature hazard. Do not touch the equipment to avoid being hurt.
  • Delayed discharge. Wait until the components are totally discharged after power off.
  • N/A

Check Items Before Switching Power ON

  1. The inverter is firmly installed at a clean place where is well-ventilated and easy-to-operate.
  2. The PE cable, DC input cable, AC output cable, and communication cable are connected correctly and securely.
  3. Cable ties are routed properly and evenly, and no burrs.
  4. Unused ports and terminals are sealed.
  5. The voltage and frequency at the connection point meet the on-grid requirements.

Product Introduction

Parts

GOODWE-SMT-Series-36KW-On-Grid-Inverter-FIG-1

  1. DC Switch
  2. PV Input Terminal
  3. WiFi/4G/LAN/GPRS Module Port
  4. Communication Cable Port[1]
  5. AC Terminal
  6. Indicator
  7. LCD[2]
  8. Button
  9. Mounting Plate
  10. Handle[3]
  11. Fan
  12. PE Terminal
  13. DRED or RSD or RS485 or USB, depending on different inverters.
  14. Some models are designed without LCD.
  15. The handle is optional

Dimensions

GOODWE-SMT-Series-36KW-On-Grid-Inverter-FIG-2

Inverter Installation

Packing List

GOODWE-SMT-Series-36KW-On-Grid-Inverter-FIG-3

  • Number of expansion bolts, PIN terminals, screws, COM connector, PV connectors are various depending on different inverters. The actual accessories may be different.
  • Communication module types: WiFi/4G/LAN/GPRS etc. The actual module delivered depends on the communication method of the selected inverter.
  • The COM connector is used to connect RS485, and remote shutdown communication cables.
  • USB cable is optional

Space Requirements

GOODWE-SMT-Series-36KW-On-Grid-Inverter-FIG-4GOODWE-SMT-Series-36KW-On-Grid-Inverter-FIG-5 Angle Requirements

GOODWE-SMT-Series-36KW-On-Grid-Inverter-FIG-6

Installing the Inverter
Avoid the water pipes and cables buried in the wall when drilling holes.

GOODWE-SMT-Series-36KW-On-Grid-Inverter-FIG-7

Installing inverters without handles

GOODWE-SMT-Series-36KW-On-Grid-Inverter-FIG-8

Electrical Connection

Connecting the PE Cable

GOODWE-SMT-Series-36KW-On-Grid-Inverter-FIG-9

Connecting the AC Cable

GOODWE-SMT-Series-36KW-On-Grid-Inverter-FIG-10

Connecting the DC Cable

GOODWE-SMT-Series-36KW-On-Grid-Inverter-FIG-10GOODWE-SMT-Series-36KW-On-Grid-Inverter-FIG-12

Connecting DRED or RS485 6pin Communication Cable (optional)

GOODWE-SMT-Series-36KW-On-Grid-Inverter-FIG-13

Connecting Remote Shutdown 2pin Communication Cable (optional)

GOODWE-SMT-Series-36KW-On-Grid-Inverter-FIG-14

Connecting USB Cable (optional)

Connecting RS485 5pin Communication Cable (optional)

GOODWE-SMT-Series-36KW-On-Grid-Inverter-FIG-16

Installing Communication Module

Power On

User Manual

  1. If it displays Select Country/Region on the LCD when you power on the equipment for the first time, you can set the safety country via the LCD or SolarGo APP. For more details, refer to Commissioning part. For other settings, please refer to the user manual.
  2. Observe the indicators to check the inverter status. If any fault exists, please refer to the Troubleshooting part in the user manual

GOODWE-SMT-Series-36KW-On-Grid-Inverter-FIG-19GOODWE-SMT-Series-36KW-On-Grid-Inverter-FIG-20

Commissioning

Commissioning via LCD
Select the right safety country via LCD if the inverter is equipped with an LCD.

GOODWE-SMT-Series-36KW-On-Grid-Inverter-FIG-21

Commissioning via SolarGo APP

Note

  1. Search for“ Solar Go APP” in Google Play or App Store.
  2. Operation steps are the same for Android system and iOS system, althoug the two interfaces are slightly different. The introduction here is based on Android system.
  3. Log in using the initial password for the first time and change the password as soon as possible. To ensure account security, you are advised to change the password periodically and keep the new password in mind.

GOODWE-SMT-Series-36KW-On-Grid-Inverter-FIG-233SolarGo App

Bluetooth: SOL-BLE**** WiFi: SOL-WiFi**** WiFi initial password: 12345678 Scan the QR Code on the equipment if you need to use GPRS or 4G. * are the last 8 digits of the inverter SN.

GOODWE-SMT-Series-36KW-On-Grid-Inverter-FIG-22

  • Initial password for Bluetooth/WiFi: 1234
  • Initial Password for GPRS or 4G : the last 4 digits of the inverter bar code

SEMS Portal App

GOODWE-SMT-Series-36KW-On-Grid-Inverter-FIG-25

GOODWE Official Website

SolarGo App

GOODWE-SMT-Series-36KW-On-Grid-Inverter-FIG-233

340-00559-01

JIANGSU GOODWE POWER SUPPLY TECHNOLOGY CO.,LTD No. 90 Zijin Rd., New District, Suzhou, 215011, China

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals