HAT COLLECTIVE 1TCH-3-3 One Touch Three Over Three Monitor Mounting Kit Installation Guide
- June 15, 2024
- HAT COLLECTIVE
Table of Contents
1TCH-3-3 One Touch Three Over Three Monitor Mounting Kit
Installation Guide
PARTS LIST
* Thru mount hardware not included.
CLAMP MOUNT
CONFIGURATION** RAIL MOUNT CONFIGURATIONAdjust leveling legs to ensure mast is vertical and stable
on desk.Plug in power cable to electrical outlet.
Test operation by pressing the up and down buttons.
Leave unit in a raised or lowered position to make installation easier as
needed.With lower work
surface in desired position, fully tighten the (4) screws as shown.ARE YOU INSTALLING
A 1TCH-1, 1TCH-3, 1TCH-1/1, 1TCH-3/3? IF NOT, PLEASE CONTINUE TO STEP 19. ARE YOU
INSTALLING A 1TCH-2, 1TCH-3, 1TCH-2/2, 1TCH-3/3?
IF NOT, PLEASE CONTINUE TO STEP 22.**
Human Active Technology
800 524 2744
customerservice@team-hat.com
team-hat.com
References
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>