COMMSCOPE MUK-MSK9L Large Tower Leg Clamp Owner’s Manual
- June 15, 2024
- CommScope
Table of Contents
COMMSCOPE MUK-MSK9L Large Tower Leg Clamp
Product Information
Specifications
- Weight: 1.54 lbs
- Dimensions: 10.0″ (height) x 20.0″ (length) x 3.0″ (width)
- Material: Galvanized steel
- Finish: Not specified
Product Usage Instructions
General Notes
All metric dimensions are in brackets [X. X]. For patent information,
please visit https://www.cs-pat.com.
Design Notes
Before installing the appurtenance, it is important to identify any hazards
or obstructions to the climbing facility and safety climb. Additional products
may be required to maintain the integrity of the safety climb. During
installation, temporary and/or permanent precautionary measures should be
taken to preserve the climbing facility and/or safety climb.
Manufacturing/Special Requirements
Tighten all bolts securing flat plates by the turn-of-nut method. Tighten
all U-bolts using the turn-of-nut method, paying attention to leaving an equal
distance and equal force on each leg of the U-bolt.
Packaging
- The packaging of the product shall meet Commscope requirements per document IS-PL-3005.
- The printed document should be placed inside a polybag and then placed in the shipping container.
- Extra hardware may be supplied, bagged, and shipped.
FAQ (Frequently Asked Questions)
-
Q: Are the dimensions provided in inches or another unit of measurement?
A: Unless otherwise specified, the dimensions are in inches. -
Q: What is the weight of the product?
A: The weight of the product is 1.54 lbs. -
Q: What is the material of the product?
A: The product is made of galvanized steel.
INSTALLATION
-
GENERAL NOTES
- ALL METRIC DIMENSIONS ARE IN BRACKETS [X. X]
- FOR PATENT INFO: https://www.cs-pat.com
-
DESIGN NOTES
2.1 ANY HAZARDS OR OBSTRUCTIONS TO THE CLIMBING FACILITY AND SAFETY CLIMB MUST BE
IDENTIFIED BEFORE INSTALLING THE APPURTENANCE. ADDITIONAL PRODUCTS MAY BE REQUIRED TO MAINTAIN THE INTEGRITY OF THE SAFETY CLIMB. DURING INSTALLATION, TEMPORARY AND/OR PERMANENT PRECAUTIONARY MEASURES SHOULD BE TAKEN TO PRESERVE THE CLIMBING FACILITY AND/OR SAFETY CLIMB. -
MANUFACTURING/SPECIAL REQUIREMENTS
- TIGHTEN ALL BOLTS SECURING FLAT PLATES BY THE TURN-OF-NUT METHOD. TIGHTEN ALL U-BOLTS USING THE TURN-OF-NUT METHOD WITH ATTENTION TO LEAVING EQUAL DISTANCE AND EQUAL FORCE ON EACH LEG OF THE U-BOLT.
-
TEST
-
PACKAGING
- PACKAGING SHALL MEET COMMSCOPE REQUIREMENTS PER DOCUMENT IS-PL-3005
- PRINTED DOCUMENT TO BE PLACED INSIDE POLYBAG AND THEN IN SHIPPING CONTAINER
- EXTRA HARDWARE MAY BE SUPPLIED, BAGGED AND SHIPPED
REVISIONS
COMPONENT PART
COMPONENT PART NUMBERS PROVIDED FOR ASSEMBLY PURPOSES;
INDIVIDUAL COMPONENTS MAY BE SHIPPED AS PARTS WITHIN AN INCLUDED KIT.
TOLERANCES
SAP MATERIAL MASTER
- MUK-MSK9L
FEATURES
C 2023 CommScope, Inc. Confidential