SANTEC 3429AT91-TM Generic Wall Mount Widespread Corneer Set Instruction Manual
- June 15, 2024
- SANTEC
Table of Contents
SANTEC 3429AT91-TM Generic Wall Mount Widespread Corneer Set
Product Information
- Product Name: SANTEC Spout and Handle Assembly
- Model Number: PS-6_ _00-U
- Finish Options: Please specify the finish when ordering the part
Specifications:
- Spout Body: PS-6_ _00-U
- Handle Assembly: Please specify option code when ordering the part
- Teflon Washer: PM-099
- Broach Extension: PM-020
- O-Ring: PM-017
- All Threads: PM-955
- Bonnet Nut: PM-956
Product Usage Instructions
Valve Installation (1):
- Before installing the valve, ensure that the measurement between the center of the valve inlet and the outside wall is correctly aligned. The MIN/MAX label on the mudguard can be used as a guide.
- Take note of the backset measurement (2-3/4) for extra thickness dimensions when roughing in the valves.
- Install the valve, making sure it is accurately plumbed in.
- Test for proper function before closing walls.
Valve Installation (2):
- Using 1/2 IPS, connect the corner valves to the spout base at the desired spread. Ensure that the hole size for the spout and handle is no more than 1-1/4 in diameter.
Spout Installation:
- The spout should be threaded onto the pipe until it is secured, with the spout facing downward. Do not use excessive force when threading the spout.
Handle Trim Installation:
- Thread the bonnet nut, all thread, and insert the broach assembly onto the valve and lightly tighten assembly with a 1 plumber’s socket wrench.
- Thread the escutcheon completely onto the all thread, ensuring the broach properly engages the handle (orientation of the handle is not important at this point).
- Measure the distance remaining between the handle base and wall, remove all trim items from the valve, and cut the excess distance from the end of the all thread and broach assembly.
- Rethread the bonnet nut, all thread, and insert the broach assembly back onto the valve and snugly tighten the assembly with a 1 plumber’s socket wrench.
- Ensure the valve is in the closed position and align the handle to its respective OFF Position on the trim.
- Thread the escutcheon on the handle onto the all thread and broach assembly, ensuring the handle position remains in the closed position.
FAQ:
-
Q: What is the hole size for the spout and handle?
A: The hole size for both the spout and handle should be no longer than 1/2 in diameter. -
Q: How should I thread the spout onto the pipe?
A: Thread the spout onto the pipe until it is secured, with the spout facing downward. Do not use excessive force when threading the spout.
KEEP THIS INSTRUCTION BOOKLET FOR FUTURE REFERENCE
SANTEC has the right to make necessary design changes when applicable.
Illustration may not depict actual products
Parts Breakdown
1 | PS-6_ _00-U ** | Spout Body * |
---|---|---|
2 | ** | Handle Assembly * |
3 | PM-099 | Teflon Washer |
4 | PM-020 | Broach Extension |
5 | PM-017 | O-Ring |
6 | PM-955 | All Threads |
7 | PM-956 | Bonnet Nut |
1 | WM-0020-1 | SA Corner Valve |
---|---|---|
2 | P0418 | Hot Cartridge Estate |
3 | P0419 | Cold Cartridge Estate |
4 | PM-1110 | Mud Guard Stop Valve |
Please specify the finish when ordering the part.
Please specify option code when ordering the part.
Valve
NOTE : Hole size for the spout and handle is 1-1/4”
Valve Installation
NOTE : Where tile construction is planned for the finished walls, allow
for extra thickness dimensions when roughing in the valves.
Determine where the finished wall will be. This measurement is necessary to
accurately plumb in the valve.
Install the valve making sure that the measurement between the center of the
valve inlet and the outside of the finish wall is 2-3/4″. This measurement is
called the backseat. The MIN/MAX label on the mudguard can be used as a guide
.
NOTE : Test for proper function before closing walls.
Valve Installation (2)
Using 1/2” IPS, connect corner the valves to the spout base at the desired
spread.
Again, allow no more than 1-1/4” diameter holes for the spout and handles.
BACKSET FROM FINISH WALL
Spout
Spout Installation
NOTE : The length of threaded pipe coming out from the finish wall should
be no longer than 1/2″. Wrap the pipe threading for the spout with Teflon
tape. Then thread the spout onto the pipe until it is secured with the spout
facing down
WARNING : Do not use excessive force when threading the spout.
Handle Trim
Trim Installation
- Step 1-Thread the bonnet nut, all thread, and insert the broach assembly onto the valve and lightly tighten the assembly with a 1” plumber’s socket Wrench. See Diagram A.
- Step 2- Thread the escutcheon completely onto the all thread ensuring the broach properly engages the handle (orientation of the handle is not important at this point)
- Step 3- Measure the distance remaining between the handle base and wall, remove all trim items from the valve, and cut the excess distance from the end of the all thread and broach assembly.
- Step 4- Rethread the bonnet nut,all thread, and insert the broach assembly back onto the valve and snugly tighten the assembly with a 1” plumber’s socket wrench.
- Step 5- Ensure the valve is in the closed position and align the handle to its respective “OFF” Position on the trim.
- Step 6- Thread the escutcheon on the handle onto the all thread and broach assembly ensuring The handle position remains in the closed position.
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>