SANTEC YY-CU10-TM AVA Collection Instruction Manual
- June 15, 2024
- SANTEC
Table of Contents
SANTEC YY-CU10-TM AVA Collection Instruction Manual
TEST FOR PROPER FUNCTION BEFORE CLOSING WALLS!
FLUSH BOTH SUPPLY LINES BEFORE INSTALLATION ‘CU’ STYLE HANDLE TRIM FOR 4-PORT, 5-PORT AND STOP V ALVES.
MINIMUM HOLE SIZE FOR THE HANDLE TRIMS IS 1 5/8” AND MAXIMUM OF 1 3/4”
INSTALLATION INSTRUCTION
INSTALLING THE VALVE WITH THE TRIM
-
Instail the valve onto the wall with at least 2-1/2″ space between the center of the valve inlet and the finished wall.
-
Screw the extension all thread and stem onto the valve making sure it is all the way in
-
Mark the extension all thread flushed to the wall, remove it and cut. Do the same with the stem but this time cut 1/4″ less than the extension thread in order to attach handle.
-
Cut off the excess All Thread and Stem (remember to cut the Stem 1/4″ shorter)
-
Replace the handle onto the stem. Tighten the handle set screw firmly.
-
Apply the finish trim.
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>