Growatt ARK-2.5H-A1 BMS for HVC Battery Units Installation Guide
- June 15, 2024
- Growatt
Table of Contents
Growatt ARK-2.5H-A1 BMS for HVC Battery Units
Installation environment
Installation tools
System size
Check
Check HVC60050-A1 List
HVC60050-A 1 X 1
|
Wall bracket X1
|
Warranty card X1
Quick installation Manual X1
---|---|---
Power cable (to battery)X1
|
Expansion screw X2
M4X10 combination X2
M6flange nutX1
|
PlugX1
Wall bracket
CheckARK2.5H-A1 List
ARK2.5H-A1 X1
|
Serial cable X1
|
Wall bracket X1
---|---|---
Warranty card X1
|
Expansion screw X2
M4X10 combination X2
M6 flange nut X1
Check accessories
HVC60050-A
1
(A)
|
ARK2.5H-A1
(B)
|
ARK2.51-1-A1
cable
(C)
---|---|---
ARK 2.5H-A1
Series cable
(D)
|
ARK-2.SH-A 1
Base
(E)
Installation Method | Compound Mode |
---|---|
Standard Wall-Mounted Installation | A+B+C |
Standard floor installation | A+B+C+E |
Wall-Mounted Battery system stacked in two line | A+B+C+D |
Floor installation battery system stacked in two line | A+B+C+D+E*2 |
Floor installation with base
Installation Location Requirements
Note:
- If more than 4 batteries are used, base mounting is recommended.
- For floor installation with base, the maximum stack number of the battery is ten.
But if the battery number is greater than six, we recommend stacking them in two lines
Installation Procedure
Note:
The safety part needs to be installed at the top battery, however, once the
number of the battery pack is higher than 7, one more safety part should be
installed in the middle battery which is shown the last step.
Wall-Mounted Installation Process
Installation Location Requirements
Note:
The number of wall-mount installations should not exceed four.
Please make sure that the weight capacity of wall should exceed 150kg.
Installation Procedure
- Adjust the screw to ensure the battery in horizontal position
install Environment
Note:
Build sun& rain shade 1o avoid direct exposure 1o sunlight and rain.
Wire Connection
HVC60050-A1 Connection end face introduction
ARK 2.5H-A1 Connection end face introduction
1 | Links 0 CAN communication | 5 | GND terminal |
---|---|---|---|
2 | LINK 1 CAN communication | 6 | Safety vent |
3 | Module negative terminal | 7 | GND terminal |
4 | Module positive terminal |
Diagram of wiring connection
Note:
The switch connect PCS toARK-2.5H-A 1, we recommend the use of molded case
circuit breaker with rated working voltage greater than 750V and rated working
current greater than 63A.
Terminal Connection
Power terminal
Note:
Press the piston indicated in the figure above before disconnecting the power
terminal.
Communication terminal
Battery system switch operation
-
Power ON battery system
Turn the circuit breaker to the “ON” state, press the POWER button for 5-6 seconds, wail for the battery system LED light to light up, indicating that the boot is complete. -
Power off battery system
Battery side Tum the breaker of to “OFF” to tum off the entire battery system.
Key operation
Power Button
Situation| Touch| Definition|
---|---|---|---
System off| Press{>5S)| Power on
Note: When multiple battery system are used in parallel connection, you only need to press one key of any module to start the system.
Service and contact
Shenzhen Growatt New Energy CO.,Ltd
No. 28 Guangming Road, Shiyan Street, Bao’an District, Shenzhen, P.R. China
86 0755 27471942
service@ginverter.com
W: www.ginverter.com
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>