IDO 1400-94001 Trevi Bathtub Instruction Manual

June 4, 2024
iDO

IDO 1400-94001 Trevi Bathtub

Trevi-Bathtub-product

Operating and maintenance instruction

Trevi 1400, 1500, 1600, 1700
  • 1400/9400101001

  • 1395 x 695 x 505

  • 1500/9400201001

  • 1495 x 695 x 505

  • 1600/9400301001

  • 1595 x 695 x 505

  • 1700/9400701001

  • 1695 x 695 x 495

Trevi 1400, 1500, 1600, 1700

Trevi-Bathtub-fig-5

BEFORE YOU TURN THE BATHTUB REMOVE THE PACKAGING. LIFT SPRING AND PULL OUT LEGS UNTIL THEY FALL INTO THE PREDRILLED HOLES.

MOUNTING END AND FRONT

  1. ADJUST THE TUB FEET SO THAT THE BATH IS LEVELTrevi-Bathtub-fig-6

  2. See which of these figures fit your bathroom. Please note any piping. Ensure the front and end are turned right so that fold of the edge on the short sides matches the figure. A and B refer to the figures in parenthesis 3 (parenthesis in A in reversed version).
    START BY ASSEMBLING THE EVENTUAL END (NO END – GO TO POINT 6)

  3. Attach the two support screws provisionally. Make sure they are screwed far enough.Trevi-Bathtub-fig-7

  4. Fit the two end brackets into the oval holes.Trevi-Bathtub-fig-8

  5. Hang the end of the edge of the bathtub. Angle out the panel so it going vertical. Adjust support screw length.
    CONTINUE MOUNTING THE FRONT
    Front mechanisms and the handles are packed in plastic bags with the front.

  6. Install the two front mechanisms. Place the hook so that it engages the edge of the bath straight above, respectively foot. Fold in the lower part of the mechanism the foot and mount the pins.

  7. Mount the front on one of the mechanisms at a time. Push the front over the lower pin and lower over the upper pin. The front is locked with the handle. Put it over the pin and slide to the right.Trevi-Bathtub-fig-11
    CLOSING THE FRONT

  8. Grab the middle and pull the front-outward until the lock releases in both slide rails and the front can be lowered.

  9. Grab with both hands one handle at a time and push the handle under the bathtub edge. The handles keep the front in place.
    OPEN THE FRONTTrevi-Bathtub-fig-14

  10. Grab with both hands on one, then the other handle, and press down. Fold out the front.

  11. Grab the middle of the front and pull upward. If you like support with one hand on the edge of the bath.

  12. Move the grip to the first handle than the second handle and pull up until the slide rails lock.

Maintenance instructions

If the tub is to be installed as a built-in bathtub, please note that each installation is individual. When planning the installation, we recommend that you turn to a professional to ensure the best results. For built-in installation is a service hatch needed to be able to maintain, clean, and inspect pipes, floor drain, and seals. We recommend that the design is built when you have the tub in place to ensure all measurements. The feet should be adjusted so that the largest stress will be on the foot position. You can enjoy your bath for a long time if you manage it well. Clean the bath regularly with mild detergent and a soft cloth. The abrasive effect can scratch the acrylic surface and do it math. A smooth surface is also easier to clean and maintain. If the surface has lost luster, you can get it to shine again by using spa polish or car wax.

Geberit International AG Schachenstrasse 77, CH-8645 Jona documentation@geberit.com www.geberit.com © 09-2021 970.851.00.0(00)

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals