MAJESTIC ECHEL36IN-C Echelon II Linear Direct Vent Fireplace Instruction Manual

June 13, 2024
Majestic

ECHEL36IN-C Echelon II Linear Direct Vent Fireplace

Product Information

The product is a fireplace manufactured by Hearth & Home
Technologies. It comes in several models, including ECHEL36IN-C,
ECHEL36STIN-C, ECHEL48IN-C, ECHEL48STIN-C, ECHEL60IN-C, and
ECHEL72IN-C. The fireplace is designed to provide heat and ambiance
to a room.

It is important to note that the installer should follow the
provided standard work checklist in addition to the instructions in
the installation manual. Failure to install the appliance correctly
can result in fire or explosion. Only components and accessories
approved by Hearth & Home Technologies should be used, as
unapproved ones may cause the fireplace to overheat.

Product Usage Instructions

Appliance Install

  1. Verify that the chase is insulated and sealed (refer to page
    26).

  2. Ensure the required factory included non-combustible board is
    installed (refer to page 46).

  3. Bend up the standoffs into the installation position and secure
    them (refer to page 43).

  4. Verify clearances to combustibles (refer to pages 16-25).

  5. Level and secure the fireplace (refer to page 45).

  6. Verify clearance to header (refer to pages 18-19).

  7. Ensure heat management system(s) and/or power vent are properly
    installed.

Venting/Chimney

  1. Ensure the venting configuration complies with the vent
    diagrams (refer to pages 32-39).

  2. Install, lock, and secure the venting in place with proper
    clearance. It may need to be ordered separately.

  3. Install firestops (refer to Section 5).

  4. Install the attic insulation shield (refer to page 42).

  5. Install and seal the exterior wall/roof flashing (refer to
    Section 7).

  6. Install and seal the terminations (refer to Section 7).

Electrical

  1. Provide unswitched power (110-120 VAC) to the appliance.
  2. Properly install switch wires (refer to Section 8, pages
    54-57).

Gas

  1. Ensure the appliance is the proper one for the fuel type. If a
    conversion was performed, make sure it was done correctly.

  2. Perform a leak check and verify the inlet pressure (refer to
    Section 9, pages 58-61).

  3. Verify the proper air shutter setting for the installation
    type.

Finishing

  1. Do not install combustible materials in non-combustible
    areas.

  2. Verify that all clearances meet the installation manual
    requirements.

  3. Finish the installation using either the inside fit or overlap
    fit method.

  4. Remove the bottom finishing template and finishing guards.

  5. Ensure that mantels and wall projections comply with
    installation manual requirements.

Appliance Setup

  1. Remove all packaging and protective materials from both the
    inside and outside of the appliance.

  2. Ensure that refractories and media are installed
    correctly.

  3. Install and secure the glass assembly.

ATTENTION INSTALLER:

Follow this Standard Work Checklist

This standard work checklist is to be used by the installer in conjunction with, not instead of, the instructions contained in this

installation manual. Customer:

Date Installed:

Lot/Address:

Location of Fireplace:

Installer:

Model (circle one): ECHEL36IN-C ECHEL36STIN-C ECHEL48IN-C

Dealer/Distributor Phone #

ECHEL48STIN-C ECHEL60IN-C ECHEL72IN-C

Serial #:

WARNING! Risk of Fire or Explosion! Failure to install appliance according to these instructions can lead to a fire or explosion. Install ONLY components and accessories approved by Hearth & Home Technologies. Unapproved components and accessories could cause fireplace to overheat.

Appliance Install Sections 3 and 6
Verified that the chase is insulated and sealed. (Pg. 26) Required factory included non-combustible board is installed. (Pg 46) Standoffs bent up into installation position and secured. (Pg. 43) Verified clearances to combustibles. (Pg. 16-25) Fireplace is leveled and secured. (Pg. 45) Verified clearance to header. (Pg. 18-19) Heat management system(s) and/or power vent properly installed.

YES

IF NO, WHY?





Venting/Chimney Sections 4,5 and 7
Venting configuration complies to vent diagrams. (Pg 32-39)
Venting installed, locked, and secured in place with proper clearance.
(May need to order separately.)
Firestops installed. (Section 5) Attic insulation shield installed. (Pg 42) Exterior wall/Roof flashing installed and sealed. (Section 7) Terminations installed and sealed. (Section 7)




Electrical Section 8 (Pg 54-57)
Unswitched power (110-120 VAC) provided to the appliance. Switch wires properly installed.


Gas Section 9 (Pg 58-61)
Proper appliance for fuel type. Was a conversion performed?
Leak check performed and inlet pressure verified. Verified proper air shutter setting for installation type.



Finishing Section 10 (Pg 62-73)
Combustible materials not installed in non-combustible areas.
Verified all clearances meet installation manual requirements. Finishing done correctly using inside fit or overlap fit method. Bottom finishing template and finishing guards removed.
Mantels and wall projections comply with installation manual requirements.





Appliance Setup Section 11 (Pg 74-78)

All packaging and protective materials removed (inside & outside of appliance).


Refractories and media installed correctly.


Glass assembly installed and secured.


Accessories installed properly.


Decorative barrier front properly installed. (May need to order separately.)


Manual bag and all of its contents are removed from inside/under the appliance and given to party responsible for use and operation.
Started appliance and verified no gas leaks exist. Lights work in all switched positions (if so equipped).



Component heat shield is installed. (Pg. 56)


Hearth & Home Technologies recommends the following: · Photographing the installation and copying this checklist for your file. · That this checklist remain visible at all times on the appliance until the installation is complete. Comments: Further description of the issues, who is responsible (Installer/ Builder/ Other Trades, etc) and corrective
action needed


Comments Communicated to party responsible ____ by __on ___

= Contains updated information.

(Builder / Gen. Contractor/) (Installer)

(Date)
2608-982 Rev. F 4/23

Read User Manual Online (PDF format)

Loading......

Download This Manual (PDF format)

Download this manual  >>

Related Manuals