STEELGREEN SG36 Zero-Turn Sprayer Spreader Instruction Manual

June 13, 2024
STEELGREEN

INSTRUCTION MANUAL
STAINLESS STEEL RATE DIAL HOLDER OPTION
Models: SG36, SG42, SG46, & SG52

SG36 Zero-Turn Sprayer Spreader

RATE DIAL HOLDER INSTALL INSTRUCTIONS

STEP ONE: Remove the clip and spinner.
CAUTION!
Be sure the hopper is empty before starting the following steps.

STEP TWO: Set the rate dial to “6” and measure the gate opening .
NOTE: Write down the measurement to be used to install the new dial holder.

NOTE: Holes will need to be drilled in gate frame.
Step 3 is optional, the gate assembly is silicone to the hopper tub. It will have to be re-silicone if removed.
NOTE: If you choose to leave the assembly on the unit, remove the hopper shaft to slide the rate dial holder assembly out.

STEP THREE:

  • Disconnect the gate and diffuser cable.
  • Remove the (8) bolts and remove the gate assembly from the hopper tub.

WARNING!
If you choose to leave the assembly attached to the tub, place a peace of wood between the frame and hopper tub to keep from drilling through the hopper tub.
STEP FOUR:

  • Squeeze the rate dial holder to disconnect it from the gate assembly.
  • Slide the rate dial assembly along with the gate out of the frame.

STEELGREEN SG36 Zero-Turn Sprayer Spreader - Fig4

STEP FIVE: Disconnect the gate from the guide.

STEELGREEN SG36 Zero-Turn Sprayer Spreader - Fig5

STEP SIX:

  • Insert the guide through the opening of the rate dial provided with the kit.
  • Re attach the gate to the guide.

STEELGREEN SG36 Zero-Turn Sprayer Spreader - Fig6

STEP SEVEN: Slide the new rate dial holder assembly into the frame.

STEELGREEN SG36 Zero-Turn Sprayer Spreader - Fig7

STEP EIGHT:

  • Set the new rate dial to “6”.
  • Mark the holes on the plate using the measurement from step 2.
  • Remove the rate dial and gate assembly.
  • Drill the holes in the plate.

STEELGREEN SG36 Zero-Turn Sprayer Spreader - Fig8

STEP NINE:

  • Re attach the assembly to the hopper tub if it was removed.
    NOTE: Be sure to re-silicone between the rate dial assembly and hopper tub.

  • Re connect the gate and diffuser cables.

  • Re install the new rate dial holder assembly.

  • Attach the rate dial holder assembly to the frame with the (4) 1/4” X 1/2” bolts & (4) 1/4” nylock nuts provided with the kit.

STEP TEN:

  • Re attach the hopper shaft if it was removed.
  • Re attach the spinner and clip.

MADE IN THE USA
Steel Green Mfg.
824 S State Road 39
Lebanon, IN 46052
(765)-481-2890
www.steelgreenmfg.com

MANUAL PART NO. MANUAL REV. DESCRIPTION KIT PART NO.
SGM-036 C STAINLESS STEEL RATE DIAL HOLDER OPTION K10027

Read User Manual Online (PDF format)

Loading......

Download This Manual (PDF format)

Download this manual  >>

Related Manuals