PANDUIT XG-RKS7 Series FlexFusion Equipment Rail Installation Guide
- June 4, 2024
- PANDUIT
Table of Contents
XG-RKS7 Series FlexFusion Equipment Rail
**Installation Guide
**
© Panduit Corp. 2021
FLEXFUSIONTM Equipment Rail Installation
Part Number(s) : XG-RKS6***
XG-RKS7*, XG-RKS8*****
XG-RKS7 Series FlexFusion Equipment Rail
INSTALLATION INSTRUCTIONS
For Technical Support: www.panduit.com/resources/install_maintain.asp
Equipment Rail Installation
- Install Equipment Rail using (3) M8 E-Rail Mount Nut, (3) M8 Hex Head Bolts Torque to 35.6N·m ± 3.5N·m [26.3 ± 2.6 ft-lbs].
- Place E-Rail Mount Nut with the flat surface of nut facing inside of the cabinet. If access is not accessible hold the E-Rail nut by the finger grip area and place in location using slots located on the front to back beam. Line up the e-mail and start the Hex Head Screw. Moving the E-Rail to the desired location before you Torque the Hex Head Screw
- (END OF ROW) Remove Side panels before completing the steps above.
700mm Wide Cabinet shown
Equipment Rail Mount Nut
If access from the side of the cabinet is not accessible, the Equipment Rail
Mount Nut can be installed from inside of the cabinet using slots on Front to
Back Beams as shown above
Equipment Rail Arrangements
- 700mm E-rails have 122mm x 34mm Openings
- 800mm E-rails have 19″ x 1RU Openings
700mm E-RAIL ARRANGEMENT PASS THRU OPENINGS
122mm X 34mm (4.8) X (1.3) FOR 42RU
– 12 PASS THRU OPENINGS 45RU
– 12 PASS THRU OPENINGS 48RU
– 16 PASS THRU OPENINGS 51RU
– 16 PASS THRU OPENINGS
NOTE: *OPENINGS WILL FIT CVPTB1X4 – SOLD SEPARATELY
800mm E-RAIL ARRANGEMENT 4 PASS THRU OPENINGS 19″ X 1RU FOR ALL RU SIZED
CABINETS
For Instructions in Local Languages and Technical Support:
www.panduit.com/resources/install_maintain.asp
www.panduit.com
E-mail: techsupport@panduit.com
Phone: 866-405-6654
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>