PANDUIT XG-RKS7 Series FlexFusion Equipment Rail Installation Guide

September 3, 2022
PANDUIT

XG-RKS7 Series FlexFusion Equipment Rail
**Installation Guide

**

© Panduit Corp. 2021
FLEXFUSIONTM Equipment Rail Installation
Part Number(s) : XG-RKS6***
XG-RKS7*
, XG-RKS8*****

XG-RKS7 Series FlexFusion Equipment Rail

INSTALLATION INSTRUCTIONS

For Technical Support: www.panduit.com/resources/install_maintain.asp

Equipment Rail Installation

  • Install Equipment Rail using (3) M8 E-Rail Mount Nut, (3) M8 Hex Head Bolts Torque to 35.6N·m ± 3.5N·m [26.3 ± 2.6 ft-lbs].
  • Place E-Rail Mount Nut with the flat surface of nut facing inside of the cabinet. If access is not accessible hold the E-Rail nut by the finger grip area and place in location using slots located on the front to back beam. Line up the e-mail and start the Hex Head Screw. Moving the E-Rail to the desired location before you Torque the Hex Head Screw
  • (END OF ROW) Remove Side panels before completing the steps above.

700mm Wide Cabinet shown

Equipment Rail Mount Nut
If access from the side of the cabinet is not accessible, the Equipment Rail Mount Nut can be installed from inside of the cabinet using slots on Front to Back Beams as shown above

Equipment Rail Arrangements

  • 700mm E-rails have 122mm x 34mm Openings
  • 800mm E-rails have 19″ x 1RU Openings

700mm E-RAIL ARRANGEMENT PASS THRU OPENINGS
122mm X 34mm (4.8) X (1.3) FOR 42RU
– 12 PASS THRU OPENINGS 45RU
– 12 PASS THRU OPENINGS 48RU
– 16 PASS THRU OPENINGS 51RU
– 16 PASS THRU OPENINGS
NOTE: *OPENINGS WILL FIT CVPTB1X4 – SOLD SEPARATELY
800mm E-RAIL ARRANGEMENT 4 PASS THRU OPENINGS 19″ X 1RU FOR ALL RU SIZED CABINETS

For Instructions in Local Languages and Technical Support:
www.panduit.com/resources/install_maintain.asp
www.panduit.com
E-mail: [email protected]
Phone: 866-405-6654

Read User Manual Online (PDF format)

Loading......

Download This Manual (PDF format)

Download this manual  >>

Related Manuals