THE BUCKET COMPANY 13 GALLON Ez-Pz Collapsible Reservoir Instruction Manual
- June 13, 2024
- THE BUCKET COMPANY
Table of Contents
EZ-PZ
COLLAPSIBLE RESERVOIR
Includes Fittings & Accessories
INSTRUCTION
MANUAL
PRODUCT BREAKDOWN
ASSEMBLY INSTRUCTIONS
-
UNPACK THE CONTENTS – DOUBLE CHECK THAT ALL PARTS ARE CORRECT
-
UNBOX AND OPEN YOUR EZ-PZ COLLAPSIBLE RESERVOIR
-
INSERT ALL SUPPORT POLES IN THE SIDE SLEEVES OF THE EZ-PZ COLLAPSIBLE RESERVOIR
-
INSIDE THE RESERVOIR, INSERT THE 3/4″ MALE OVERFLOW FITTING INTO THE DRAINAGE PORT.
THEN CONNECT THE 3/4″ DOUBLE UNION FEMALE VALVE ON THE OUTSIDE.
DOUBLE CHECK THE SILICONE WASHERS ARE INSIDE THE RESERVOIR AND SECURELY TIGHTENED. -
INSIDE THE RESERVOIR, INSERT THE 3/4″ MALE OVERFLOW FITTING TO THE OVERFLOW PORT AT THE TOP. THEN CHOOSE TO CLOSE WITH CAP OR CONNECT OTHER FITTINGS AND ACCESSORIES.
-
USE THE REMAINING FITTINGS AND ACCESSORIES FOR YOUR PREFERRED OUTLET/INLET CONNECTIONS.
Ensure that the Ez-Pz Collapsible Reservoir is placed on a flat and smooth
surface to prevent damage.
Do not attempt to move the Ez-Pz Collapsible Reservoir when full. The
reservoir must be completely drained prior to moving.
Customer Support
Phone #: 786-580-3990
E-mail:
customerservice@thebucketcompany.com
Website: www.thebucketcompany.com
Romulus, Michigan, USA
STAY CONNECTED
@thebucketcompany
www.thebucketcompany.com
References
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>