Schneider Electric A9Z51225 EVlink Smart Wallbox Shock Protection Instruction Manual

June 13, 2024
Schneider Electric

A9Z51225 EV link Smart Wall box Shock Protection
Instruction Manual

A9Z51225 EV link Smart Wall box Shock Protection

Acti9 ibid B type EV – A9Z51ppp – A9Z52ppp

PLEASE NOTE

  • The installation, maintenance and eventual replacement of this device must only be carried out by a qualified electrician.
  • This device must not be repaired.
  • All applicable local, regional and national regulations must be complied with during the installation, use, maintenance and replacement of this device.
  • This device should not be installed if, when unpacking it, you observe that it is damaged.
  • Schneider Electric cannot be held responsible in the event of non-compliance with the instructions in this document and in the documents to which it refers.
  • The service instruction must be observed throughout the life time of this device.

Description

Schneider Electric A9Z51225 EVlink Smart Wallbox Shock Protection -
Description

A Large circuit identification area
B Test button
C Isolated terminals IP20
D VISI-TRIP window
E Rocker with VISI-SAFE
F Dual lock
G Use this terminal for comb busbar when mixing Acti9 ibid with double terminal MCBs (offer available in some countries only)
H Terminal for wire

Installation

DANGER

HAZARD OF ELECTRIC SHOCK, EXPLOSION, OR ARC FLASH

  • Shut down the equipment before starting work.
  • Use a voltage tester with a suitable rated voltage.
    Failure to follow these instructions will result in death or serious injury.

Schneider Electric A9Z51225 EVlink Smart Wallbox Shock Protection -
Installation

Wiring

Electrical wiring

  • Wire all active conductors and external cables (L1, L2, L3 and the neutral conductor N) to the device.
  • Remember to test your product after installation (see section 4 Test).

Schneider Electric A9Z51225 EVlink Smart Wallbox Shock Protection -
Installation1

Operating test

WARNING

PRODUCT OUT OF ORDER
Run a self diagnostic test of device after installing it, and then at regular intervals by pressing the Test button (marked T). (see drawing below).
Failure to follow these instructions can result in death, serious injury, or equipment damage.Schneider Electric A9Z51225 EVlink Smart Wallbox Shock
Protection - Description1

Dielectric test

NOTICE

RISK OF DAMAGE TO THE EQUIPMENT ACTI9 ibid
Disconnect all input and output wires from the Acti9 ibid device before running an insulation resistance test (dielectric test).
Failure to follow these instructions can result in equipment damage.Schneider Electric A9Z51225 EVlink Smart Wallbox Shock Protection -
Description2

PHA17138-04
Schneider Electric Industries SAS
35, rue Joseph Moniker
CS 30323
F – 92506 Ruel Malmaison Cedex
www.se.com
PHA17138-04
© 2022 Schneider Electric
– All rights reserved.

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Schneider Electric User Manuals

Related Manuals