Schneider Electric A9Z51225 EVlink Smart Wallbox Shock Protection Instruction Manual
- June 13, 2024
- Schneider Electric
Table of Contents
A9Z51225 EV link Smart Wall box Shock Protection
Instruction Manual
A9Z51225 EV link Smart Wall box Shock Protection
Acti9 ibid B type EV – A9Z51ppp – A9Z52ppp
PLEASE NOTE
- The installation, maintenance and eventual replacement of this device must only be carried out by a qualified electrician.
- This device must not be repaired.
- All applicable local, regional and national regulations must be complied with during the installation, use, maintenance and replacement of this device.
- This device should not be installed if, when unpacking it, you observe that it is damaged.
- Schneider Electric cannot be held responsible in the event of non-compliance with the instructions in this document and in the documents to which it refers.
- The service instruction must be observed throughout the life time of this device.
Description
A Large circuit identification area
B Test button
C Isolated terminals IP20
D VISI-TRIP window
E Rocker with VISI-SAFE
F Dual lock
G Use this terminal for comb busbar when mixing Acti9 ibid with double
terminal MCBs (offer available in some countries only)
H Terminal for wire
Installation
DANGER
HAZARD OF ELECTRIC SHOCK, EXPLOSION, OR ARC FLASH
- Shut down the equipment before starting work.
- Use a voltage tester with a suitable rated voltage.
Failure to follow these instructions will result in death or serious injury.
Wiring
Electrical wiring
- Wire all active conductors and external cables (L1, L2, L3 and the neutral conductor N) to the device.
- Remember to test your product after installation (see section 4 Test).
Operating test
WARNING
PRODUCT OUT OF ORDER
Run a self diagnostic test of device after installing it, and then at regular
intervals by pressing the Test button (marked T). (see drawing below).
Failure to follow these instructions can result in death, serious injury,
or equipment damage.
Dielectric test
NOTICE
RISK OF DAMAGE TO THE EQUIPMENT ACTI9 ibid
Disconnect all input and output wires from the Acti9 ibid device before
running an insulation resistance test (dielectric test).
Failure to follow these instructions can result in equipment
damage.
PHA17138-04
Schneider Electric Industries SAS
35, rue Joseph Moniker
CS 30323
F – 92506 Ruel Malmaison Cedex
www.se.com
PHA17138-04
© 2022 Schneider Electric
– All rights reserved.
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>