Vertys Solar Group 4-10.5K-DS R1 Macro Series & R1 Moto Series Installation Guide

June 13, 2024
Vertys Solar Group

Vertys Solar Group 4-10.5K-DS R1 Macro Series & R1 Moto Series Installation Guide

Product Information:

  • INVERTER x 1

  • MOUNTING PANEL x 1

  • PV CONNECTOR (+) x 1

  • PV CONNECTOR (-) x 2

  • EXPANSION TUBE x 4

  • Quality Certificate

  • SCREW x 2

  • GPRS/WIFI (Optional)

  1. There are 2 PV+ connectors for 4/5/6K-DS , 3 PV+ connectors for 7/8K-DS and 4 PV+ connectors for 9/10/10.5K-DS
  2. There are 2 PV- connectors for 4/5/6K-DS , 3 PV- connectors for 7/8K-DS and 4 PV- connectors for 9/10/10.5K-DS

Installation Environment

  1. In order to achieve optimal performance, the ambient temperature should be kept lower than 45 °C.
  2. For the convenience of checking the LCD display and possible maintenance activities, please install the inverter at eye level.
  3. Inverters should not be installed near inflammable or explosive items. Any strong electro-magnetic equipment should be kept away from installation site.
  4. Product label and warning symbol shall be clear to read after installation.
  5. Please do not install inverter under direct sunlight, rain and snow.

Installation Environment

Installation Position

  1. The installation method and mounting location must be suitable for the inverter’s weight and dimensions.
  2. Mount on a solid surface.
  3. Select a well-ventilated place sheltered from direct sun radiation.

Installation Position

Installation Space

The installation minimum clearances around the inverter should be no less than the following value:
Dimension

above≥500mm
below≥500mm
the front≥300mm
both sides≥300mm

Mounting The Inverter

  1. Drill 4 Fix Ø11 holes in the wall according to the dimensions, fix the wall mounting bracket on the wall with 4 expansion bolts in accessory bag.
    Mounting The Inverter

  2. Place the inverter on the wall-mounted bracket and install the fix screws.
    Mounting The Inverter

Electrical Connection

PV connection

  1. Connect the PV strings to DC input port of inverter; make sure the maximum open circuit voltage (Voc) of each PV string does not exceed the inverter input voltage Vmax under any condition.

AC connection

  1. Strip off L/N/PE cables as below figure:
    AC connection
No. Description Remark
A Protective layer Diameter ranges :9-16mm
B Length of stripped off 12mm
C Insulate layer Cross section of ac cabl 50mm
D Cross section of ac cables 6-10mm²
  1. Tighten the nut clockwise & Tighten L/N/PE cable screws to the terminals according to markings.

  2. Plug Grid side connector into AC connector of inverter end, rotate and tighten clockwise.

Communication connection

Overview of communication ports:
Communication connection
The first generation WIFI/GPRS module, and it is shipped randomly with inverter.
The second generation WIFI/GPRS module, and it is shipped randomly with inverter.

  1. WIFI/GPRS Communication (optional)
    Connect the WIFI/GPRS module to the COM port of inverter. After successful connection, information
    such as power generation and running state of the inverter can be viewed via the App on the phone.
    The details please refer to the module user manual.The block diagram of the WIFI/GPRS communication
    system is as follows:
    Connection Wife

  2. CT Connection (Optional)
    CT Connection \(Optional\)

  3. DRM and Relay connection
    DRM (demand response modes) it is a special port as specified in the standard AS/NZS4777, and for CEI standard, DRM S0 is the DI port .
    The relay can be set to fault alarm output, it’s a dedicated interface for Europe, User can use LED indicators or other equipment to indicate whether the inverter is in the faulty state. The details please refer to inverter user manual.

Starting The Inverter

Turn on inverter

  1. Turn on inverter DC switch to “ON” position.
  2. Close the DC and AC circuit breaker.

Commissioning

  1. Language setting
    Long press the function button to enter the “set language” interface, hit function button less than 1s to choose the language and long press the function button to confirm the setting.
    Set Language factory Set

  2. Country setting
    Long press the function button to enter the “set country” interface, hit function button less than 1s to choose the country and long press the function button to confirm the setting.
    Set Language factory Set

Documents / Resources

| Vertys Solar Group 4-10.5K-DS R1 Macro Series & R1 Moto Series [pdf] Installation Guide
4-10.5K-DS R1 Macro Series R1 Moto Series, 4-10.5K-DS, R1 Macro Series R1 Moto Series, Series R1 Moto Series, R1 Moto Series, Moto Series
---|---

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals