TRANE RTAA Air-Cooled Chiller Controls Installation Guide
- June 13, 2024
- Trane
Table of Contents
TRANE RTAA Air-Cooled Chiller Controls
SAFETY WARNING
Only qualified personnel should install and service the equipment. The
installation, starting up, and servicing of heating, ventilating, and air-
conditioning equipment can be hazardous and requires specific knowledge and
training.
Improperly installed, adjusted or altered equipment by an unqualified
person could result in death or serious injury.
When working on the equipment, observe all precautions in the literature
and on the tags, stickers, and labels that are attached to the equipment.
Introduction
Warnings, Cautions, and Notices
Safety advisories appear throughout this manual as required. Your personal safety and the proper operation of this machine depend upon the strict observance of these precautions.
The three types of advisories are defined as follows:
Indicates a potentially
hazardous situation which, if not avoided, could result in death or serious
injury.
Indicates a potentially
hazardous situation which, if not avoided, could result in minor or moderate
injury. It could also be used to alert against unsafe practices.
Indicates a situation that
could result in equipment or property-damage only accidents
Important Environmental Concerns
Scientific research has shown that certain man-made chemicals can affect the
earth’s naturally occurring stratospheric ozone layer when released to the
atmosphere. In particular, several of the identified chemicals that may affect
the ozone layer are refrigerants that contain Chlorine, Fluorine and Carbon
(CFCs) and those containing Hydrogen, Chlorine, Fluorine and Carbon (HCFCs).
Not all refrigerants containing these compounds have the same potential impact
to the environment.
Trane advocates the responsible handling of all refrigerants-including
industry replacements for CFCs and HCFCs such as saturated or unsaturated HFCs
and HCFCs.
Important Responsible Refrigerant Practices
Trane believes that responsible refrigerant practices are important to the environment, our customers, and the air conditioning industry. All technicians who handle refrigerants must be certified according to local rules. For the USA, the Federal Clean Air Act (Section 608) sets forth the requirements for handling, reclaiming, recovering and recycling of certain refrigerants and the equipment that is used in these service procedures. In addition, some states or municipalities may have additional requirements that must also be adhered to for responsible management of refrigerants. Know the applicable laws and follow them.
WARNING
Proper Field Wiring and Grounding Required!
Failure to follow code could result in death or serious injury. All field wiring MUST be performed by qualified personnel. Improperly installed and grounded field wiring poses FIRE and ELECTROCUTION hazards. To avoid these hazards, you MUST follow requirements for field wiring installation and grounding as described in NEC and your local/state electrical codes. Failure to follow code could result in death or serious injury.
WARNING
Personal Protective Equipment (PPE) Required!
Failure to wear proper PPE for the job being undertaken could result in
death or serious injury.
Technicians, in order to protect themselves from potential electrical,
mechanical, and chemical hazards, MUST follow precautions in this manual and
on the tags, stickers, and labels, as well as the instructions below:
- Before installing/servicing this unit, technicians MUST put on all PPE required for the work being undertaken (Examples; cut resistant gloves/sleeves, butyl gloves, safety glasses, hard hat/bump cap, fall protection, electrical PPE and arc flash clothing). ALWAYS refer to appropriate Safety Data Sheets (SDS) and OSHA guidelines for proper PPE.
- When working with or around hazardous chemicals, ALWAYS refer to the appropriate SDS and OSHA/GHS (Global Harmonized System of Classification and Labeling of Chemicals) guidelines for information on allowable personal exposure levels, proper respiratory protection and handling instructions.
- If there is a risk of energized electrical contact, arc, or flash, technicians MUST put on all PPE in accordance with OSHA, NFPA 70E, or other country-specific requirements for arc flash protection, PRIOR to servicing the unit. NEVER PERFORM ANY SWITCHING, DISCONNECTING, OR VOLTAGE TESTING WITHOUT PROPER ELECTRICAL PPE AND ARC FLASH CLOTHING. ENSURE ELECTRICAL METERS AND EQUIPMENT ARE PROPERLY RATED FOR INTENDED VOLTAGE.
WARNING
Follow EHS Policies!
Failure to follow instructions below could result in death or serious injury.
- All Trane personnel must follow the company’s Environmental, Health and Safety (EHS) policies when performing work such as hot work, electrical, fall protection, lockout/tagout, refrigerant handling, etc. Where local regulations are more stringent than these policies, those regulations supersede these policies.
- Non-Trane personnel should always follow local regulations.
Copyright
This document and the information in it are the property of Trane, and may not be used or reproduced in whole or in part without written permission. Trane reserves the right to revise this publication at any time, and to make changes to its content without obligation to notify any person of such revision or change.
Trademarks
All trademarks referenced in this document are the trademarks of their
respective owners.
Plexiglas is a registered trademark of Arkema France Corporation.
Discussion
Electronic component availability has required Trane to obsolete the MOD01421 (1U1 control module) which includes BRD03015. The following procedure describes the process by which you can upgrade your 130–400 ton RTAA chiller to the newer clear language display (CLD) control system, eliminating the need for the obsolete module.
Table 1. KIT16221 contents
Description | Quantity | Part Number (a) |
---|---|---|
Clear Language Display | 1 | MOD00942 |
CPM 1U1 | 1 | MOD01424 |
Bezel with adhesive tape | 1 | COV02180 |
Transformer, 120 to 24 Vac | 1 | TRR00463 |
Connector, CPM to CLD | 2 | CON01543 |
Mounting brackets and hardware | 1 | KIT16214 |
(a) Part Numbers may change over time.
Replacement Procedure
WARNING
Live Electrical Components!
During installation, testing, servicing and troubleshooting of this product, it may be necessary to work with live electrical components. Have a qualified licensed electrician or other individual who has been properly trained in handling live electrical components perform these tasks. Failure to follow all electrical safety precautions when exposed to live electrical components could result in death or serious injury.
-
Stop the chiller if it is running.
a. Open the left control panel door (as you’re facing the control panel).
b. Toggle the Chiller Switch to the Stop/Reset position.
c. Wait for all running compressors to shut down (approximately 20 sec). -
ecord unit configuration settings from menus P1, P2, P3, P4, and P5.
a. Use to Table 2 through Table 6 to record the configuration settings if your chiller display and keypad are still functional. If you are unable to retrieve the configuration settings from your chiller and they were not recorded elsewhere, use your unit model number and refer to Figure 8, p. 22 in RTAA- IOM-3 (Installation,Operation, and Maintenance: Air-Cooled Series® Rotary Liquid Chillers). For default configuration settings not identified in the unit model number, refer to p. 94–97 of RTAA-IOM-3.
b. Use the following key sequence to access hidden menus P4 and P5.
i. Press the Set Point Down button to the left and the up/down display arrows until the display reads P0.
ii. Press the Set Point Up button twice.
iii. Press the Set Point Down button once.
iv. Press the Set Point Up button twice.
v. Press the Set Point Down button once.
vi. Press the Set Point Up button twice.
vii.You should now be at menu P4. Press the Set Point Up button once to get to menu ****P5.
Unit Configuration Settings
Table 2. Menu P1
10| Front Panel Chilled Water Setpoint|
---|---|---
11| Design Delta Temperature Setpoint|
12| Differential to Start Setpoint|
13| Front Panel Current Limit Setpoint|
14| Outdoor Air Temperature (optional)| Not a Setting
15| Low Ambient Lockout d/E|
16| Low Ambient Lockout Setpoint|
17| Condenser Entering Water Temperature (Not applicable for RTAA)|
18| Condenser Leaving Water Temperature (Not applicable for RTAA)|
19(1)| Service Pumpdown Circuit 1 d/E|
19(2)| Service Pumpdown Circuit 2 d/E|
1A(1)| Circuit Lockout – Circuit 1 d/E|
1A(2)| Circuit Lockout – Circuit 2 d/E|
1b(1)| Diagnostics Reset – Circuit 1 d/E|
1b(2)| Diagnostics Reset – Circuit 2 d/E|
Table 3. Menu P2
20–28 | These menu items are not settings | Not settings |
---|---|---|
29(A) | Compressor A Starts | |
29(B) | Compressor B Starts | |
29(C) | Compressor C Starts | |
29(D) | Compressor D Starts | |
2A(A) | Compressor A Hours | |
2A(B) | Compressor B Hours | |
2A(C) | Compressor C Hours | |
2A(D) | Compressor D Hours |
Table 4. Menu P3
30| External Chilled Water Setpoint d/E|
---|---|---
31| External Current Limit Setpoint d/E|
32| Ice Machine Control d/E|
33| Active Ice Termination Setpoint| Not a setting
34| Front Panel Ice Termination Setpoint|
35| Return Reset d/E|
36| Zone Reset d/E|
37| Outdoor Reset d/E|
38| Reset Ratio Setpoint|
39| Start Reset Setpoint|
3A| Maximum Reset Setpoint|
3b| External Circuit Lockout d/E|
Table 5. Menu P4
40| Leaving Water Temperature Cutout Setpoint|
---|---|---
41| Low Refrigerant Temperature Cutout Setpoint|
42| Condenser Limit Setpoint|
43| Balanced Compressor Starts and Hours (Lead/Lag) d/E|
44| SI Display Units d/E|
45| Unit Line Voltage|
46| Under/Over Voltage Protection d/E|
47| Phase Imbalance Protection d/E|
48| Phase Reversal Protection d/E|
49| Superheat Setpoint|
4A(1)| EXV Control Response Setpoint – Circuit 1|
4A(2)| EXV Control Response Setpoint – Circuit 2|
4b| Leaving Water Temperature Control Response Setpoint|
4C| ICS Address|
4d(1)| Fan Control Deadband Bias – Circuit 1|
4d(2)| Fan Control Deadband Bias – Circuit 2|
4E| Programmable Relay Setup|
4F| Restart Inhibit Timer|
Table 6. Menu P5
50| Number of Compressors|
---|---|---
51(A)| Compressor A Tons|
51(B)| Compressor B Tons|
51(C)| Compressor C Tons|
51(D)| Compressor D Tons|
52| Low Water Temperature EXV Gain Compensation d/E|
53| Fan Control d/E|
54(1)| Number of Fans on Circuit 1|
54(2)| Number of Fans on Circuit 2|
55| Reduced Inrush Starting d/E|
56(A)| Compressor A Current Overload Setting|
56(B)| Compressor B Current Overload Setting|
56(C)| Compressor C Current Overload Setting|
56(D)| Compressor D Current Overload Setting|
57| GP Compressor Unit| Disabled
58| Low Ambient – Half Air Flow Fan d/E|
59| Low Ambient Two Speed Motors d/E|
5A| Night Noise Setback d/E|
5b(1)| Number of EXV’s on Circuit 1|
5b(2)| Number of EXV’s on Circuit 2|
5C(1)| Future Option|
5C(2)| Future Option|
WARNING
Hazardous Voltage w/Capacitors!
Disconnect all electric power, including remote disconnects and discharge
all motor start/run capacitors before servicing. Follow proper lockout/tagout
procedures to ensure the power cannot be inadvertently energized. For variable
frequency drives or other energy storing components provided by Trane or
others, refer to the appropriate manufacturer’s literature for allowable
waiting periods for discharge of capacitors. Verify with an appropriate
voltmeter that all capacitors have discharged. Failure to disconnect power and
discharge capacitors before servicing could result in death or serious
injury.
For additional information regarding the safe discharge of capacitors, see
PROD-SVB06*-EN
-
Disconnect and lockout the power to the chiller.
a. Open the unit disconnect switch that feeds power to the chiller.
b. Install lockout/tagout lock(s). -
Cut the hole for the new CLD in the control panel door.
a. Remove the existing clear Plexiglas® window from the control panel door.
b. If necessary, remove the control panel door from the chiller.
c. Measure and mark 4.75 in. from the middle hole on top of the existing cutout to just outside the right and left edges.
d. Measure and mark 1 in. from top edge of existing hole.
e. Measure and mark 11 in. down from the mark made in the previous step.
f. Trace square on door as shown in Figure 1, p. 7.
g. Cut along the traced lines.
h. Deburr the edges of the new hole.
Figure 1. Existing cutout and modifications required
-
Install the CLD2 into the control panel door.
a. Using the new CLD as your template. Hold up the new CLD to the hole and make marks where holes should be drilled.
b. Drill holes.
c. Starting at the top, attach brackets from the outside of the door in such a way that the door panel is sandwiched between the CLD on the inside and mounting brackets on the outside of the door panel as shown in Figure 2. The screw head should be flush with the bracket.
d. Tighten the nuts so that the gasket on the CLD is properly compressed.
e. Remove the tape backing from the plastic bezel and apply it to the outside of the door opening so it covers the mounting brackets.
Figure 2. New CLD assembly
-
Replace the 1U1 module.
a. If required, mark the wires connected to TB1, TB2, TB3, TB4, and TB5.
b. Remove all wires and connectors from the 1U1 module.
c. Loosen but do not remove the two lower 1U1 mounting screws.
d. Remove the two upper 1U1 mounting screws. If star washers exist on any of the screws, be careful not to lose them.
e. Remove the 1U1 from the control panel.
f. Install the new 1U1 into the control panel reusing the same screws.
g. Replace the two upper 1U1 mounting screws.
h. Tighten the two lower 1U1 mounting screws.
i. Re-connect wiring to the 1U1. There are differences between TB4 on the old and new 1U1.
Refer to Table 7 when reconnecting’s wiring to that terminal block.
Table 7. Old-to-new wiring terminal positions on CPM Terminal| 130-400T RTAA 1U1| New RTAA 1U1
---|---|---
TB4-1| ALARM (COMMON)| ALARM (COMMON)
TB4-2| ALARM (NORMALLY OPEN)| ALARM (NORMALLY OPEN)
TB4-3| ALARM (NORMALLY CLOSED)| ALARM (NORMALLY CLOSED)
TB4-4| COMPRESSOR RUNNING (COMMON)| COMPRESSOR RUNNING (COMMON)
TB4-5| COMPRESSOR RUNNING (NORMALLY OPEN)| COMPRESSOR RUNNING (NORMALLY OPEN)
TB4-6| COMPRESSOR RUNNING (NORMALLY CLOSED)| MAXIMUM CAPACITY (COMMON)
TB4-7| MAXIMUM CAPACITY (NORMALLY COMMON)| MAXIMUM CAPACITY (NORMALLY OPEN)
TB4-8| MAXIMUM CAPACITY (NORMALLY OPEN)| EVAPORATOR PUMP (COMMON)
TB4-9| | EVAPORATOR PUMP (NORMALLY OPEN) -
Install the 24 Vac transformer.
- Install the 120/24 Vac transformer in the bottom part of the control panel to the left of 1TB3.
Install the transformer so the primary connections face 1TB3.
- Install the 120/24 Vac transformer in the bottom part of the control panel to the left of 1TB3.
-
Install additional wiring.
a. Connect the 24 Vac transformer primary (120 Vac side) wires to 1TB3-1 and 1TB3-2.
b. Connect the 24 Vac transformer secondary to CLD terminals J2-1 and J2-2.
c. Connect the IPC communications wires.
Note: IPC communications is a daisy-chain communications system that is connected to the J1 connectors on all of the modules in the RTAA control system except for the CLD.
i. Inspect all of the J1 connectors on the upper left-hand side of each silver control module and find two open terminals on the IPC communications bus.
ii. When you find two open terminals, remove the white cover from the back of the orange plug and use a small screwdriver to push 18 AWG wires into the knives on the connector until they cut through the wire insulation and hold the conductors securely.
iii. Re-install the white plug cover.
Note: If there are no open J1 terminals, you can splice into the IPC communications link using butt splices or wire nuts. Connect the other end of the IPC communications wires to J1-1 and J1-2 on the new CLD module. -
Remove lockout lock and restore power to the chiller.
-
Configure the chiller.
a. Use the settings recorded in Step 2, p. 4 to configure the new CLD. Refer to p. 72 of RTAA-SVX01A-EN (Installation, Operation, and Maintenance: Series R® Air-Cooled Rotary Liquid Chillers) to help you enter settings into the new CLD.
b. Variable Speed Fans should be set to DISABLE for both circuits.
Re-start the chiller by pressing the green Auto button on the keypad.
Starts and Hours
Note: The compressor starts and hours recorded in Step 2, p. 4 cannot be transferred into the new control system. Therefore, it is recommended that you record these numbers for all compressors. All counters will start from zero in the new CLD control system.
Chilled Water Pump Control
The new control system you’re installing has an added feature. It has a normally open contact output that can be used to control the evaporator water pump. Refer to Table 7, p. 9 for the connection points on the new 1U1 module. Chilled Water Pump can be set to ON or AUTO in the Operator Settings menu. If this setting is ON, the pump output will remain energized any time the control system is powered. If set to AUTO, the pump output will be energized whenever the chiller is put into the Auto mode and will de-energize from 1 to 30 minutes (the default is 10 minutes) after the chiller leaves the Auto mode. The 1- to 30-minute timer can be configured in the Chilled Water Pump Off Delay setting.
Optional Remote Display Panel
If there is a remote display panel connected to your RTAA chiller, the following settings in your CLD will need to be made:
ICS Address: 32
Setpoint Source: Tracer
A new operating code may be displayed on the remote coded panel that is not listed on the black decal on the front of your remote display. The new operating mode is 300 Stopped By Remote Display. This mode will be displayed as Stopped by Tracer at the chiller front panel.
Trane – by Trane Technologies (NYSE: TT), a global climate innovator – creates comfortable, energy efficient indoor environments for commercial and residential applications. For more information, please visit trane.com or tranetechnologies.com.
Trane has a policy of continuous product and product data improvement and reserves the right to change design and specifications without notice. We are committed to using environmentally conscious print practices.
References
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>