Blue-White F-2000 Chem Feed Wall Skid Industrial Instruction Manual
- June 13, 2024
- Blue-White
Table of Contents
- Blue-White F-2000 Chem Feed Wall Skid Industrial
- Product Information
- Product Usage Instructions
- Introduction
- Specifications
- Dimensions
- Mounting the Chem-Feed® System
- Component Identification and Typical Operation – Simplex Pump Skid
- Chem-Feed® Skid System Matrix
- WARRANTY
- References
- Read User Manual Online (PDF format)
- Download This Manual (PDF format)
Blue-White F-2000 Chem Feed Wall Skid Industrial
Product Information
Page | Section | Content |
---|---|---|
Page 4 | Introduction | The product undergoes a stringent quality assurance |
program and
may contain trace amounts of clean water. Minimum four hours of
charging is recommended before shipping.
Page 4| Features| The product includes a Pressure Relief Valve to protect
against
over-pressurization, with a setting range of 5-150 psi and a
maximum system pressure of 150 psi. It also includes a Pressure
Gauge with Guard, which can be specified with pressure ranges from
0-30 psi. These features are shipped with all systems. Peristaltic
pump systems are recommended for use.
Page 5| Specifications| Standard available items that ship with most
configurations are
listed. However, customizations may result in components not listed
in the manual.
Page 6| Dimensions| The dimensions provided in the manual are applicable to
all
configurations of the Chem-Feed System. However, the design may
vary.
Page 9| Component Identification and Typical Operation – Simplex Pump
Skid| The page provides an identification of various components and
their typical operation in a simplex pump skid system. Components
include Pulse Dampener, Chemical Feed Flowmeter, Back Pressure
Valve, Gauge, Pressure Gauge, Chemical Output, Calibration
Cylinder, One-way Check Valve, Pressure Relief Valve, Pressure
Switch, Chemical Input, and Y Strainer.
Page 11| Component Identification and Typical Operation – Duplex Pump
Skid System| The page provides an identification of various components and
their typical operation in a duplex pump skid system. Components
include Pressure Gauge, Calibration Cylinder, Chemical Feed
Flowmeter, Pulsation Dampener, Chemical Output, One-way Check
Valves, Pressure Relief Valve, Chemical Input, and Y Strainer.
Product Usage Instructions
Simplex Pump Skid System:
- Connect the chemical solution into the chemical Inlet (V-1).
- Connect the chemical treated system to the outlet (V-8).
- To pump the chemical solution into the system, follow these steps:
- Open ball valve V-1.
- Open ball valve V-3, V-4, and V-5 (if optional equipment included).
- Close ball valve V-2, V-6, and V-7.
- Open ball valve V-8 to inject the chemical solution into your system.
- Start the pump.
Duplex Pump Skid System:
- Connect the chemical solution into the Inlet (V-1).
- Connect the chemical treated system to the outlet (V-13).
- To pump the chemical solution into the system, follow these steps:
- Open ball valve V-1.
- Open ball valve V-3 or V-4, depending on which pump is being used.
- Close ball valve V-2, V-11, and V-12.
- Open ball valve V-5 and/or V-6, depending on your system design.
- Open ball valve V-7, V-8, V-9, V-10, depending on your system
- Open ball valve V-13 to inject the chemical solution into your system.
- Start the pump(s).
Introduction
- Congratulations on purchasing the Chem-Feed® Engineered Wall Skid System. The system is designed with the necessary components to safely inject liquid chemical into a system.
- Your Chem-Feed® Engineered Wall Skid System is pre-configured based on your selections via the matrix or when designed with our engineering staff.
- Please Note: Your new Chem-Feed® System has been pressure tested at the factory with clean water for a minimum of four hours before shipping. You may notice trace amounts of clean water in the system. This is part of our stringent quality assurance program at Blue-White Industries.
Features
Chem-Feed® Engineered Skid Systems were designed and engineered using solid
modeling tools for superior piping installation and easy component
maintenance. Custom engineered universal mounting blocks and pre-machined
mounting slots provide for easy component servicing and replacement. Each
factory built and tested system includes the following standard components:
- Pressure Relief Valve – Protects the system from over-pressurization, 5-150 psi setting range, 150 psi maximum system pressure. Ships on all systems.
- Check Valve – Protects the user from back-flow during pump maintenance. Ships on all systems.
- Flow Verification Sensor – S6A accurately verifies chemical feed. Exclusive to Blue-White®.
- Inlet Y Strainer – Protects system components from damage cause by dirt or debris.
- Calibration Cylinder – Confirm pump output under system conditions. Specify cylinder volumes from 3 GPH to 128 GPH.
- Pulsation Dampener – Protect the system components from pulsation. Recommended for diaphragm pump systems. Not recommended for peristaltic pump systems.
- Pressure Gauge with Guard – Isolate and protect the system pressure gauge. Specify pressure ranges from 0-30 psi, 0- 100 psi, or 0-200 psi.
- Strut Mounts – FRP strut is provided with the skid to ensure sturdy support for wall mounting.
- Corrosion Resistant – Chem-Feed® frame constructed of chemically resistant polyethylene.
- Pump Mount Bracket – Constructed of chemically resistant polyethylene.
Specifications
Items listed below are standard available items and ship with most configurations. Your system may be customized with components not listed below.
- Skid: Chemically resistant polyethylene structure
- Pump (sold separately)
- FLEXFLO® A 1, A2., A3 or A4 peristaltic pumps
- CHEM-FEED® CD1, C2, C3 or CD3 diaphragm pumps
- Piping: 1/2″ PVC Schedule 80 (optional CPVC, PVDF, CHEM PROLINE®)
- Seals: FKM seals (optional EPDM)
- Tubing (T):
- Reinforced braided PVC, 200 psi max, certified NSF 51 / 61.
- The pump inlet and outlet flexible tubing connections are terminated to half unions and secured to the barbed fitting with stainless steel clamps. (Optional: 1/2″ PTFE, 1/4″ PE, 1/4″ PTFE)
- Tubing Clamps: 300 series SS band, 400 series SS screw
- Unions (U): PVC body, schedule 80 (optional CPVC, PVDF)
- Ball Valves (V): True unions, PVC body, PTFE shaft bearings and seats (optional CPVC, PVDF)
- Pressure Relief Valve (PRV): PVC body, PTFE primary diaphragm seal. Non-wetted components:
- EPDM secondary seal, zinc plated steel spring, stainless steel external hardware, HDPE pressure adjustment screw. Infinite adjustment from 10-150 psi. (optional CPVC, PVDF)
- Calibration Cylinder (CC)
- PVC body, PVC end caps, 1/2″ PVC pipe outlet vent.
- Available volumes: 3 GPH (100ml), 8 GPH (250ml), 16 GPH (500ml), 32 GPH (1000ml), 64 GPH (2000ml), and 128 GPH (4000ml). (Optional Glass)
- Pulsation Dampener (PD)
- CPVC body, 10 cubic inch volume (optional PVDF)
- Gauge W/Guard (G)
- Gauge: liquid filled stainless steel with blowout plug, bottom mount, 1/4″ NPT theads.
- Available pressure ranges: 0-30 psi, 0-100, psi, 0-200 psi.
- Guard: PVC body, temperature compensated oil filled. (optional CPVC, PVDF)
- Check Valve (CV)
- PVC body. Cracking pressure: 1.0-1.5 psi
- Maximum working pressure: inlet= 150 psi, back= 100 psi (optional CPVC, PVDF)
- Flow Sensor (S6A)
- Available Flow Ranges: 10 – 5,000 ml/min, 100-10,000 ml/min
- Y Strainer (S)
- PVC body, 1/32″ Mesh (optional CPVC, PVDF)
- Pressure Switch (PSH)
- 316 Stainless Steel
- Back-Pressure Valve (BPV)
- PVC body, 0-150 PSI Range (optional CPVC, PVDF)
- Universal Mounting Blocks
- PA 12
- Pump Mounting Brackets
- 316 Stainless Steel
- Skid Mounting Strut
- FRP
- Mounting Hardware
- 304 Stainless Steel
- Maximum Working Pressure
- 150 psig (10.3 bar)
- Operating Temperature
- 14 °F to 115 °F (-10 ·c to 46 °C)
- Maximum Overall Dimensions
- 30″ W x 48″ H x 17 .29″ D (76.2W x 121.9H x 43.9D cm)
- Skid Weight
- 45 lb. (Not including pump)
- Approximate Shipping Weight
- 230 lb. (105 kg) (Pumps ship separately)
- Approximate Shipping Dimensions
- 17″ x 32″ x 50″ (Pumps ship separately)
Dimensions
Your Chem-Feed System may be designed differently from drawings below. However, the dimensions shown below remain the same no matter your configuration.
Simplex Pump System: Duplex Pump System:
Mounting Pump to the Chem-Feed® System
Mounting the Chem-Feed® System
- Locate mounting position of skid on wall.
- Use dimensions and strut to mark location for wall anchors.
- Remove strut from skid, and mount to wall with anchors.
- Re-mount skid to strut.
- Mount pump(s).
Component Identification and Typical Operation – Simplex Pump Skid
* PRV = Pressure Relief Valve preset at 50psi
How To Operate the Chem-Feed® Skid System – Single Pump Skid
- Connections:
- Connect chemical solution into chemical Inlet (V-1)
- Connect chemical treated system to outlet. (V-8)
- To Pump chemical solution into system.
- Open ball valve V-1.
- Open ball valve V-3, V-4, and V-5 (if optional equipment included). Close ball valve V-2, V-6, and V-7.
- Open ball valve V-8 to inject chemical solution into your system.
- Start pump.
- To calibrate pump / system.
- Open ball valve V-1.
- Open ball valve V-7.
- Close ball valve V-2, V-6, and V-8.
- Start pump and run until calibration cylinder is filled to top calibration line. Do not leave pump unattended during this operation.
- Stop pump once calibration cylinder is filled.
- Close ball valves V-1 and V-7.
- Open ball valve V-2 and V-8 to inject chemical solution into your system.
- Note the chemical solution level in the calibration cylinder.
- To calibrate pump at maximum speed into your system, Press the prime button on pump. The prime mode runs the pump at maximum speed for 60 seconds (1 minute) on all
- Blue-White® pumps.
- To calibrate pump at your desired feed rate, you must pre-program your pump speed before running this routine. Please refer to the instruction manual for your pump to adjust feed rate and additional calibration instructions. Repeat process to ensure accuracy of calibration.
Component Identification and Typical Operation – Duplex Pump Skid System * PRV = Pressure Relief Valve preset at 50psi
How To Operate the Chem-Feed® Duplex Skid System
- Connections:
- Connect chemical solution into Inlet. (V-1)
- Connect chemical treated system to outlet. (V-13)
- To Pump chemical solution into system.
- Open ball valve V-1.
- Open ball valve V-3,or V-4, depending on which pump is being used. Close ball valve V-2, V-11, and V-12.
- Open ball valve V-5 and / or V-6. Depending on your system design. Open ball valve V-7, V-8, V-9, V-10 depending on your system design. Open ball valve V-13 to inject chemical solution into your system.
- Start pump(s).
- To calibrate pump(s) / system.
- Open ball valve V-1.
- Open ball valve V-3 or V-4, depending on which pump you’re calibrating.
- Open ball valve V-5 or V-6, depending on which pump you’re calibrating.
- Close ball valve V-2, V-11, and V-13.
- Open ball valve V-12. This open valve will direct chemical into calibration cylinder.
- Start pump and run until calibration cylinder is filled to top calibration line. Do not leave pump unattended during this operation!
- Stop pump once calibration cylinder is filled.
- Close ball valves V-1 and V-12.
- Open ball valve V-2 and V-13 to inject chemical solution into your system.
- Note the chemical solution level in the calibration cylinder.
- To calibrate pump at maximum speed into your system, Press the prime button on pump. The prime mode runs the pump at maximum speed for 60 seconds (1 minute) on all
- Blue-White® pumps.
- To calibrate pump at your desired feed rate, you must pre-program your pump speed before running this routine. Please refer to the instruction manual for your pump to adjust feed rate and additional calibration instructions. Repeat process to ensure accuracy of calibration.
Chem-Feed® Skid System Matrix
Model Number Matrix
CHEM-FEED® Simplex Wall Skid System Matrix – Industrial NOTES:
- When ordering pumps for skids, pump head orientation is standard LEFT facing only.
- Terminal Boxes quoted and mounted separately.
- All skids are pressure tested prior to shipment. Pumas are purchased and shipped separately
CHEM-FEED® Duplex Wall Skid System Matrix – Industrial NOTES:
- When ordering pumps for skids, pump head orientation is standard LEFT facing only.
- Terminal Boxes quoted and mounted separately
WARRANTY
Limited Warranty
The skid is a quality product and is warranted for 24 months from date of
purchase (proof of purchase is required). The skid will be repaired or
replaced at our discretion. The pump(s) have a separate warranty and are not
covered under this warranty.
What is not Covered
The pump(s) included with skid have a separate warranty. Refer to pump warranty page for information.
- Removal, or re-installation, and any related labor charge.
- Freight to the factory.
- Skids that have been tampered with, or in pieces.
- Damage to the skid that results from misuse, carelessness, abuse, lack of maintenance, or alteration that is out of Blue-White’s control.
- Skids damaged by or acts of nature.
Blue-White does not assume responsibility for any loss, damage, or expense
directly or indirectly related to or arising out of the use of its products.
Failure must have occurred due to defect in material or workmanship and not as
a result of operation of the product other than in normal operation as defined
in the pump operation manual.
The warranty status is determined by the skid’s serial label and the sales
invoice or receipt. The serial label must be on the skid and be legible. The
warranty status of the skid will be verified by Blue-White or a factory
authorized service center.
Obtaining In-Warranty Repair
Contact the factory to obtain a RMA (Return Material Authorization) number.
Carefully pack the system as instructed. Please enclose a brief description of
the problem as well as the original invoice or sales receipt, or copy showing
the date of purchase. Prepay all shipping costs. COD shipments will not be
accepted. Warranty service must be performed by the factory or an authorized
service center. Damage caused by improper packaging is the responsibility of
the sender. When In-Warranty repair or replacement is completed, the factory
pays for return shipping to the dealer or customer.
Product Use Warning
- Blue-White products are manufactured to meet the highest quality standards in the industry. Each product instruction manual includes a description of the associated product warranty and provides the user with important safety information. Purchasers, installers, and operators of Blue-White products should take the time to inform themselves about the safe operation of these products. In addition, Customers are expected to do their own due diligence regarding which products and materials are best suited for their intended applications. Blue-White is pleased to assist in this effort but does not guarantee the suitability of any particular product for any specific application as Blue-White does not have the same degree of familiarity with the application that the customer/end user has. While Blue-White will honor all of its product warranties according to their terms and conditions, Blue-White shall only be obligated to repair or replace its defective parts or products in accordance with the associated product warranties.
- BLUE-WHITE SHALL NOT BE LIABLE EITHER IN TORT OR IN CONTRACT FOR ANY LOSS OR DAMAGE WHETHER DIRECT, INDIRECT, INCIDENTAL, OR CONSEQUENTIAL, ARISING OUT OF OR RELATED TO THE FAILURE OF ANY OF ITS PARTS OR PRODUCTS OR OF THEIR NONSUITABILITY FOR A GIVEN PURPOSE OR APPLICATION.
Chemical Resistance Warning
- Blue-White offers a wide variety of wetted parts. Purchasers, installers, and operators of Blue-White products must be well informed and aware of the precautions to be taken when injecting or measuring various chemicals, especially those considered to be irritants, contaminants or hazardous. Customers are expected to do their own due diligence regarding which products and materials are best suited for their applications, particularly as it may relate to the potential effects of certain chemicals on Blue-White products and the potential for adverse chemical interactions.
- Blue-White tests its products with water only. The chemical resistance information included in this instruction manual was supplied to Blue-White by reputable sources, but Blue-White is not able to vouch for the accuracy or completeness thereof.
- While Blue-White will honor all of its product warranties according to their terms and conditions, Blue-White shall only be obligated to repair or replace its defective parts or products in accordance with the associated product warranties.
- BLUE-WHITE SHALL NOT BE LIABLE EITHER IN TORT OR IN CONTRACT FOR ANY LOSS OR DAMAGE, WHETHER DIRECT, INDIRECT, INCIDENTAL, OR CONSEQUENTIAL, ARISING OUT OF OR RELATED TO THE USE OF CHEMICALS IN CONNECTION WITH ANY BLUE-WHITE PRODUCTS.
Users of electrical and electronic equipment (EEE) with the WEEE marking per
Annex IV of the WEEE Directive must not dispose of end of life EEE as unsorted
municipal waste, but use the collection framework available to them for the
return, recycle, recovery of WEEE and minimize any potential effects of EEE on
the environment and human health due to the presence of hazardous substances.
The WEEE marking applies only to countries within the European Union (EU) and
Norway. Appliances are labeled in accordance with European Directive
2002/96/EC.
Contact your local waste recovery agency for a Designated Collection Facility
in your area.
5300 Business Drive Huntington Beach, CA 9264S USA
TEL: 714-893-8529
FAX: 714-894-9492
www.blue-white.com
sales@blue-white.com
customerservice@blue-white.com
References
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>