Van der Valk Solar Systems ValkBox3 Standard Solar Ramp Instruction Manual

June 12, 2024
Van der Valk Solar Systems

Van der Valk Solar Systems logo Installation manual
ValkBox3Van der Valk Solar Systems ValkBox3 Standard Solar Ramp -
Figure

ValkBox3 Standard Solar Ramp

Van der Valk Solar Systems ValkBox3 Standard Solar
RampVersion 01 | May 2023

Pay attention

  • This manual is not project specific.
  • This manual is not legally binding.
  • No rights may be derived from this installation manual.
  • See datasheet ValkCableCare for cable management.
  • The system is placed in the middle zone of the roof.

Van der Valk Solar Systems ValkBox3 Standard Solar Ramp - Figure
2

Disclaimer

This installation manual composed with the greatest possible care and contains specific information for correct and safe installation of the solar mounting system, including installation drawings and ballast tables, calculated according to the Eurocode regulations. The standard values used for input of these calculations, always need to be checked in advance by the installer for correctness. In case values are different, a project case specific calculation needs to be made. Please contact Van der Valk Solar Systems in this situation.
At all times all currently applicable structural, safety and building regulations must be observed prior to installation of the solar mounting system. The building in question will be subject to a load as a result of the solar mounting system installed/mounted. Solar mounting systems installed on roofs will be exposed to wind and snow loads. Therefore, you are at all times responsible to obtain and use a design calculation to establish whether or not the building will be able to withstand the (extra) load at all times. Where necessary, modifications need to be made by you. Van der Valk will not accept any form of liability upon you not having obtained and used such a required design calculation.
Mounting systems for PV-panels placed on flat roofs should either be mechanically attached to the roof or need to be supported by ballast, to make sure that the solar mounting system is unable to be lifted, tipped over or slide. The required ballast weight per system shown in the tables in this manual ensures that the mounting system can be installed and used safely. In case the inclination of the roofs is 5 degrees or more, the PV-mounting system must always be mechanically fixed to the construction of the roof.
The calculations do not take into account obstacles in the near surrounding such as, for example, high buildings, cliffs and mountains. Restrictions also apply for the position of the solar mounting system on a roof. The solar panels must be installed at a certain distance from the edge of the roof: the middle zone.
The standard warranty is 10 years, which can be extended under certain conditions. The warranty provided is subject to the warranty conditions stated in the general terms and conditions stipulated by Van der Valk Solar Systems B.V. Our terms and conditions shall apply to all our products at all times and can be found on our website: www.valksolarsystems.com
Van der Valk Solar Systems B.V. does not accept any liability for any direct and/or indirect consequences of any act (or omission) ensuing from the information in or failure to observe the instructions provided in this installation manual. The use of the installation manual will at all times be subject to Dutch law.
Van der Valk Solar Systems holds the right to amend this document without further notice.

The ValkBox3 mounting system is a product of:
Van der Valk Solar Systems BV
Netherlands Chamber of Commerce: 27355116
www.valksolarsystems.com

Safety instructions

The ValkBox3 mounting system is installed on roofs and will be exposed to wind and snow. The building in question will be subject to a greater load as a result of the PV system. A design calculation must be used to establish whether or not the building in question will be able to withstand the extra load. Where necessary, modifications will then need to be made.
When installing the ValkBox3 mounting system, the instructions provided in this user manual must be observed at all times. Read this manual carefully and keep it in a safe place. Also follow the instructions stated in the manuals for the other system components that form part of the overall PV system. All current structural, safety and building regulations must be observed. Van der Valk Solar Systems B.V. will never be liable for any direct and/or indirect intangible or consequential loss ensuing from or connected to the failure to observe the instructions provided in this manual.

Starting points
The following starting points apply for the ValkBox3 mounting system:
The standards applied (if applicable for specific solar mounting system)
NEN-EN 1990: Eurocode – Basis of structural design
NEN-EN 1991-1-4: Eurocode 1: Actions on structures – Part 1-4: General actions – Wind actions
NEN7250: Solar energy systems – Integration in roofs and facades – Constructional aspects
BS EN 1991-1-4: British Standard

Type of solar panel
The ValkBox3 mounting system is a universal mounting system for solar panels. The following starting points apply:
Design panels: Standard solar panels with an aluminium frame, with mounting holes for M6 bolts.
Length panels: Up to max 2280 mm
Width panels: 926 – 1150 mm
Type of roofs
The ValkBox3 mounting system can be used to mount panels on flat roofs. The following starting points apply:
Type of roof covering: bitumen, EPDM and concrete
Before installing the ValkBox3 mounting system, make sure that you carefully sweep the roof area. The ValkBox3 mounting system (see later in this manual) may only be placed on flat roofs or ground surface up to a maximum pitch of 5 degrees. The system can not be placed on steeper roofs or surfaces.

Ballast
The ValkBox3 mounting system needs to be supported by ballast, to make sure that the system is unable to move, lift or tip over. This manual indicates how much ballast should be placed on the system based on maximum panel dimensions, wind area and roof height. The number of tiles specified (30 x 30 x 4.5 cm) per position will be vital to ensure that the mounting system can be used safely.
To achieve this, follow the required ballast instructions later in this manual.

Position
Restrictions also apply for the position of the system on a roof. The system must be installed at a certain distance from the edge of the roof, in the so called “middle zone”.
According to the Eurocode for wind loads EN1991-1-4, the edge zone of the roof is 1/5th of the roof height. So for example: if the roof height is 6 meters, a free edge zone of 1,2 meters must be maintained.

Required ballast

The Netherlands
General
The ValkBox3 mounting system must be ballasted by means of tiles, which must be placed on the indicated ballast foundations. In three steps you can easily determine the required ballast;

  • Find the correct wind area for your location on the wind map
  • Use the wind area in combination with the building height for the ballast table
  • Select the required ballast for G1 and G2 in kg and/or number of tiles

Note 1: Min. extra ballast in G1 & G2 has to be 2 x 1 tile (2 x 9 kg).
Note 2: The ballast in G1 & G2 must be equally divided over the rubber ballast carriers.
Note 3: At maximum 17 tiles (30x30x4.5 cm) can be placed on the tile carriers. 4 tiles in G1 and 13 (2×6.5) tiles in G2. This represents a ballast weight of 153 kg).
Environmental factors

Roof zone Middle zone
Terrain category Built area
Roofing materials Bitumen, EPDM or concrete

Windmap The NetherlandsVan der Valk Solar Systems ValkBox3 Standard
Solar Ramp - Windmap The Netherlands Panel: maximum dimensions 1800×1150 mm

Building height| 0 – 5 meter| 5 – 7 meter| 7 – 9 meter| 9 – 12 meter| 12 – 15 meter|
---|---|---|---|---|---|---
Wind area| G1| G2| G1| G2| G1| G2| G1| G2| G1| G2
I (29,5 m/s)| 36| 97| 36| 97| X| X| X| X| X| X| kg
4| 11| 4| 11| X| X| X| X| X| X| tiles
II (27 m/s)| 36| 77| 36| 81| 36| 90| 36| 104| 36| X| kg
4| 9| 4| 9| 4| 10| 4| 12| 4| X| tiles
III (24,5 m/s)| 36| 59| 36| 59| 36| 69| 36| 81| 36| 90| kg
4| 7| 4| 7| 4| 8| 4| 9| 4| 10| tiles

Panel: maximum dimensions 2280×1150 mm

Building height| 0 – 5 meter| 5 – 7 meter| 7 – 9 meter| 9 – 12 meter| 12 – 15 meter|
---|---|---|---|---|---|---
Wind area| G1| G2| G1| G2| G1| G2| G1| G2| G1| G2
I (29,5 m/s)| X| X| X| X| X| X| X| X| X| X| kg
X| X| X| X| X| X| X| X| X| X| tiles
II (27 m/s)| 36| 101| 36| 101| 36| 116| X| X| X| X| kg
4| 11,5| 4| 11,5| 4| 13| X| X| X| X| tiles
III (24,5 m/s)| 36| 78| 36| 78| 36| 90| 36| 105| X| X| kg
4| 9| 4| 9| 4| 10| 4| 12| X| X| tiles

Belgium

General
The ValkBox3 mounting system must be ballasted by means of tiles, which must be placed on the indicated ballast foundations. In three steps you can easily determine the required ballast;

  • Find the correct wind area for your location on the wind map
  • Use the wind area in combination with the building height for the ballast table
  • Select the required ballast for G1 and G2 in kg and/or number of tiles

Note 1: Min. extra ballast in G1 & G2 has to be 2 x 1 tile (2 x 9 kg).
Note 2: The ballast in G1 & G2 must be equally divided over the rubber ballast carriers.
Note 3: At maximum 17 tiles (30x30x4.5 cm) can be placed on the tile carriers. 4 tiles in G1 and 13 (2×6.5) tiles in G2. This represents a ballast weight of 153 kg).

Environmental factors

Roof zone Middle zone
Terrain category III (villages, suburban terrain, permanent forest)
Roofing materials Bitumen, EPDM or concrete

Windmap BelgiumVan der Valk Solar Systems ValkBox3 Standard Solar Ramp -
Windmap Belgium Panel: maximum dimensions 1800×1150 mm

Building height| 0 – 5 meter| 5 – 7 meter| 7 – 9 meter| 9 – 12 meter| 12 – 15 meter|
---|---|---|---|---|---|---
Wind area| G1| G2| G1| G2| G1| G2| G1| G2| G1| G2
23 m/s| 36| 40| 36| 50| 36| 57| 36| 66| 36| 74| kg
4| 4,5| 4| 6| 4| 6,5| 4| 7,3| 4| 8,5| tiles
24 m/s| 36| 46| 36| 56| 36| 64| 36| 74| 36| 82| kg
4| 5,5| 4| 6,5| 4| 7,5| 4| 8,5| 4| 9,5| tiles
25 m/s| 36| 51| 36| 63| 36| 71| 36| 82| 36| 90| kg
4| 6| 4| 7| 4| 8| 4| 9,5| 4| 10| tiles
26 m/s| 36| 57| 36| 69| 36| 79| 36| 90| 36| 99| kg
4| 6,5| 4| 8| 4| 9| 4| 10| 4| 11| tiles

Panel: maximum dimensions 2280×1150 mm

Building height| 0 – 5 meter| 5 – 7 meter| 7 – 9 meter| 9 – 12 meter| 12 – 15 meter|
---|---|---|---|---|---|---
Wind area| G1| G2| G1| G2| G1| G2| G1| G2| G1| G2
23 m/s| 36| 54| 36| 66| 36| 76| 36| 87| 36| 96| kg
4| 6| 4| 7,5| 4| 8,5| 4| 10| 4| 11| tiles
24 m/s| 36| 61| 36| 74| 36| 84| 36| 97| 36| 107| kg
4| 7| 4| 8,5| 4| 9,5| 4| 11| 4| 12| tiles
25 m/s| 36| 68| 36| 82| 36| 93| 36| 107| X| X| kg
4| 8| 4| 9,5| 4| 10,5| 4| 12| X| X| tiles
26 m/s| 36| 75| 36| 91| X| X| X| X| X| X| kg
4| 8,5| 4| 10,5| X| X| X| X| X| X| tiles

Germany
General
The ValkBox3 mounting system must be ballasted by means of tiles, which must be placed on the indicated ballast foundations. In three steps you can easily determine the required ballast;

  • Find the correct wind area for your location on the wind map
  • Use the wind area in combination with the building height for the ballast table
  • Select the required ballast for G1 and G2 in kg and/or number of tiles

Environmental factors

Roof zone Middle zone
Terrain category IV (city)
Height above sea level 350 m

Exclusief North German Lowland

 Roofing materials Bitumen, EPDM or concrete

Windmap Germany![Van der Valk Solar Systems ValkBox3 Standard Solar Ramp

Building height| 0 – 5 meter| 5 – 7 meter| 7 – 9 meter| 9 – 12 meter| 12 – 15 meter|
---|---|---|---|---|---|---
Wind area| G1| G2| G1| G2| G1| G2| G1| G2| G1| G2
1 (22,5 m/s)| 36| 41| 36| 41| 36| 41| 36| 41| 36| 41| kg
4| 5| 4| 5| 4| 5| 4| 5| 4| 5| tiles
2 (25 m/s)| 36| 56| 36| 56| 36| 56| 36| 56| 36| 56| kg
4| 6,5| 4| 6,5| 4| 6,5| 4| 6,5| 4| 6,5| tiles
3 (27,5 m/s)| 36| 72| 36| 72| 36| 72| 36| 72| 36| 72| kg
4| 8| 4| 8| 4| 8| 4| 8| 4| 8| tiles
4 (30 m/s)| 36| 89| 36| 89| 36| 89| 36| 89| 36| 89| kg
4| 10| 4| 10| 4| 10| 4| 10| 4| 10| tiles

Panel: maximum dimensions 2280×1150 mm

Building height| 0 – 5 meter| 5 – 7 meter| 7 – 9 meter| 9 – 12 meter| 12 – 15 meter|
---|---|---|---|---|---|---
Wind area| G1| G2| G1| G2| G1| G2| G1| G2| G1| G2
1 (22,5 m/s)| 36| 55| 36| 55| 36| 55| 36| 55| 36| 55| kg
4| 6,5| 4| 6,5| 4| 6,5| 4| 6,5| 4| 6,5| tiles
2 (25 m/s)| 36| 74| 36| 74| 36| 74| 36| 74| 36| 74| kg
4| 8,5| 4| 8,5| 4| 8,5| 4| 8,5| 4| 8,5| tiles
3 (27,5 m/s)| 36| 94| 36| 94| 36| 94| 36| 94| 36| 94| kg
4| 10,5| 4| 10,5| 4| 10,5| 4| 10,5| 4| 10,5| tiles
4 (30 m/s)| X| X| X| X| X| X| X| X| X| X| kg
X| X| X| X| X| X| X| X| X| X| tiles

United Kingdom

General
The ValkBox3 mounting system must be ballasted by means of tiles, which must be placed on the indicated ballast foundations. In three steps you can easily determine the required ballast;

  • Find the correct wind area for your location on the wind map
  • Use the wind area in combination with the building height for the ballast table
  • Select the required ballast for G1 and G2 in kg and/or number of tiles

Note 1: Min. extra ballast in G1 & G2 has to be 2 x 1 tile (2 x 9 kg).
Note 2: The ballast in G1 & G2 must be equally divided over the rubber ballast carriers.
Note 3: At maximum 17 tiles (30x30x4.5 cm) can be placed on the tile carriers. 4 tiles in G1 and 13 (2×6.5) tiles in G2. This represents a ballast weight of 153 kg).

Environmental factors

Roof zone Middle zone
Terrain category   Town
Height above sea level 50 m
Distance to coast line 5 km
Distance to city border 5 km
Roofing materials Bitumen, EPDM or concrete

Windmap United KingdomVan der Valk Solar Systems ValkBox3 Standard
Solar Ramp - Windmap United Kingdom Panel: maximum dimensions 1800×1150 mm

Building height| 0 – 5 meter| 5 – 7 meter| 7 – 9 meter| 9 – 12 meter| 12 – 15 meter|
---|---|---|---|---|---|---
Wind area| G1| G2| G1| G2| G1| G2| G1| G2| G1| G2
22 m/s| 36| 60| 36| 76| 36| 83| 36| 102| 36| 102| kg
4| 7| 4| 8,5| 4| 9,5| 4| 11,5| 4| 11,5| tiles
23 m/s| 36| 67| 36| 85| 36| 92| X| X| X| X| kg
4| 7,5| 4| 9,5| 4| 10,5| X| X| X| X| tiles
24 m/s| 36| 75| 36| 94| 36| 102| X| X| X| X| kg
4| 8,5| 4| 10,5| 4| 11,5| X| X| X| X| tiles
25 m/s| 36| 83| 36| 104| X| X| X| X| X| X| kg
4| 9,5| 4| 12| X| X| X| X| X| X| tiles
26 m/s| 36| 92| X| X| X| X| X| X| X| X| kg
4| 10,5| X| X| X| X| X| X| X| X| tiles

Panel: maximum dimensions 2280×1150 mm

Building height| 0 – 5 meter| 5 – 7 meter| 7 – 9 meter| 9 – 12 meter| 12 – 15 meter|
---|---|---|---|---|---|---
Wind area| G1| G2| G1| G2| G1| G2| G1| G2| G1| G2
22 m/s| 36| 79| 36| 100| 36| 108| X| X| X| X| kg
4| 9| 4| 11,5| 4| 12| X| X| X| X| tiles
23 m/s| 36| 88| X| X| X| X| X| X| X| X| kg
4| 10| X| X| X| X| X| X| X| X| tiles
24 m/s| 36| 98| X| X| X| X| X| X| X| X| kg
4| 11| X| X| X| X| X| X| X| X| tiles
25 m/s| 36| 108| X| X| X| X| X| X| X| X| kg
4| 12| X| X| X| X| X| X| X| X| tiles
26 m/s| X| X| X| X| X| X| X| X| X| X| kg
X| X| X| X| X| X| X| X| X| X| tiles

Ireland
General
The ValkBox3 mounting system must be ballasted by means of tiles, which must be placed on the indicated ballast foundations. In three steps you can easily determine the required ballast;

  • Find the correct wind area for your location on the wind map
  • Use the wind area in combination with the building height for the ballast table
  • Select the required ballast for G1 and G2 in kg and/or number of tiles

Note 1: Min. extra ballast in G1 & G2 has to be 2 x 1 tile (2 x 9 kg).
Note 2: The ballast in G1 & G2 must be equally divided over the rubber ballast carriers.
Note 3: At maximum 17 tiles (30x30x4.5 cm) can be placed on the tile carriers. 4 tiles in G1 and 13 (2×6.5) tiles in G2. This represents a ballast weight of 153 kg).

Environmental factors

Roof zone Middle zone
Terrain category   Town
Height above sea level 50 m
Distance to coast line 5 km
Distance to city border 5 km
Roofing materials Bitumen, EPDM or concrete

Windmap Ireland![Van der Valk Solar Systems ValkBox3 Standard Solar Ramp

Building height| 0 – 5 meter| 5 – 7 meter| 7 – 9 meter| 9 – 12 meter| 12 – 15 meter|
---|---|---|---|---|---|---
Wind area| G1| G2| G1| G2| G1| G2| G1| G2| G1| G2
25 m/s| 36| 83| 36| 104| X| X| X| X| X| X| kg
4| 9,5| 4| 12| X| X| X| X| X| X| tiles
26 m/s| 36| 92| X| X| X| X| X| X| X| X| kg
4| 10,5| X| X| X| X| X| X| X| X| tiles
27 m/s| 36| 100| X| X| X| X| X| X| X| X| kg
4| 11,5| X| X| X| X| X| X| X| X| tiles
28 m/s| X| X| X| X| X| X| X| X| X| X| kg
X| X| X| X| X| X| X| X| X| X| tiles

Panel: maximum dimensions 2280×1150 mm

Building height| 0 – 5 meter| 5 – 7 meter| 7 – 9 meter| 9 – 12 meter| 12 – 15 meter|
---|---|---|---|---|---|---
Wind area| G1| G2| G1| G2| G1| G2| G1| G2| G1| G2
25 m/s| 36| 108| X| X| X| X| X| X| X| X| kg
4| 12| X| X| X| X| X| X| X| X| tiles
26 m/s| X| X| X| X| X| X| X| X| X| X| kg
X| X| X| X| X| X| X| X| X| X| tiles
27 m/s| X| X| X| X| X| X| X| X| X| X| kg
X| X| X| X| X| X| X| X| X| X| tiles
28 m/s| X| X| X| X| X| X| X| X| X| X| kg
X| X| X| X| X| X| X| X| X| X| tiles

Norway
General

The ValkBox3 mounting system must be ballasted by means of tiles, which must be placed on the indicated ballast foundations. In three steps you can easily determine the required ballast;

  • Find the correct wind area for your location on the wind map
  • Use the wind area in combination with the building height for the ballast table
  • Select the required ballast for G1 and G2 in kg and/or number of tiles

Note 1: Min. extra ballast in G1 & G2 has to be 2 x 1 tile (2 x 9 kg).
Note 2: The ballast in G1 & G2 must be equally divided over the rubber ballast carriers.
Note 3: At maximum 17 tiles (30x30x4.5 cm) can be placed on the tile carriers. 4 tiles in G1 and 13 (2×6.5) tiles in G2. This represents a ballast weight of 153 kg).

Environmental factors

Roof zone Middle zone
Terrain category III (villages, suburban terrain, permanent forest)
Height above sea level 175 m
Roofing materials Bitumen, EPDM or concrete

Windmap Norway Panel: maximum dimensions 1800×1150 mm

Building height| 0 – 5 meter| 5 – 7 meter| 7 – 9 meter| 9 – 12 meter| 12 – 15 meter|
---|---|---|---|---|---|---
Wind area| G1| G2| G1| G2| G1| G2| G1| G2| G1| G2
22 m/s| 36| 53| 36| 53| 36| 56| 36| 65| 36| 72| kg
4| 6| 4| 6| 4| 6,5| 4| 7,5| 4| 8| tiles
25 m/s| 36| 74| 36| 74| 36| 78| 36| 89| 36| 98| kg
4| 8,5| 4| 8,5| 4| 9| 4| 10| 4| 11| tiles
27 m/s| 36| 89| 36| 89| 36| 94| 36| 108| X| X| kg
4| 10| 4| 10| 4| 10,5| 4| 12| X| X| tiles
29 m/s| 36| 106| X| X| X| X| X| X| X| X| kg
4| 12| X| X| X| X| X| X| X| X| tiles
31 m/s| X| X| X| X| X| X| X| X| X| X| kg
X| X| X| X| X| X| X| X| X| X| tiles

Panel: maximum dimensions 2280×1150 mm

Building height| 0 – 5 meter| 5 – 7 meter| 7 – 9 meter| 9 – 12 meter| 12 – 15 meter|
---|---|---|---|---|---|---
Wind area| G1| G2| G1| G2| G1| G2| G1| G2| G1| G2
22 m/s| 36| 70| 36| 70| 36| 74| 36| 85| 36| 94| kg
4| 8| 4| 8| 4| 8,5| 4| 9,5| 4| 10,5| tiles
25 m/s| 36| 96| 36| 96| 36| 102| X| X| X| X| kg
4| 11| 4| 11| 4| 11,5| X| X| X| X| tiles
27 m/s| X| X| X| X| X| X| X| X| X| X| kg
X| X| X| X| X| X| X| X| X| X| tiles
29 m/s| X| X| X| X| X| X| X| X| X| X| kg
X| X| X| X| X| X| X| X| X| X| tiles
31 m/s| X| X| X| X| X| X| X| X| X| X| kg
X| X| X| X| X| X| X| X| X| X| tiles

Wind area | Norway

| m/s| | m/s
---|---|---|---
Provincie Østfold| 22| Askvoll| 28
Except Municipalities:| | Flora| 28
Halden| 24| Gulen| 28
Moss| 24| Bremanger| 29
Rygge| 24| Bremanger near the Ålfotbreen| 29
Råde| 24| Solund| 29
Sarpsborg| 24| Selje| 31
Våler| 24| Vågsøy| 31
Fredrikstad| 26| Provincie Møre og Romsdal| 30
Hvaler| 27| Except Municipalities:|
Provincie Akershus| 22| Rindal| 25
Except Municipality:| | Surnadal| 25
Vestby| 24| Nesset| 26
Provincie Oslo| 22| Norddal| 26
Provincie Hedmark| 22| Stordal| 26
Except Municipalities:| | Stranda| 26
Alvdal| 24| Sunndal| 27
Folldal| 24| Gjemnes| 28
Folldal near Trøndelag| 24| Rauma| 28
Os| 24| Sykkylven| 28
Os near Trøndelag| 24| Tingvoll| 28
Tolga| 24| Volda| 28
Tynset| 24| Ørskog| 28
Tynset Kvikne| 24| Ørsta| 28
Tynset near Trøndelag| 24| Eide| 29
Provincie Oppland| 22| Halsa| 29
Except Municipalities:| | Hareid| 29
Vågå| 23| Molde| 29
Dovre| 24| Skodje| 29
Dovre near Trøndelag| 24| Sula| 29
Lom| 24| Sandøy| 31
Lom near Sogn og Fj.| 24| Frei| Municipality isn’t in the Wind standard
Vang| 24| Tustna| Municipality isn’t in the Wind standard
Vang near Sogn og Fj.| 24| Provincie Sør-Trøndelag| 25
Lesja| 25| Except Municipalities:|
Lesja near Trøndelag/Møre og Romsdal| 25| Malvik| 26
Skjåk| 25| Oppdal| 26
Skjåk near Sogn og Fj./Møre og Romsdal| 25| Rennebu| 26
Provincie Buskerud| 22| Trondheim| 26
Except Municipalities:| | Agdenes| 27
Hemsedal| 24| Rissa| 27
Hemsedal near Sogn og Fj.| 24| Snillfjord| 27
Hol| 24| Hemne| 28
Hol near Hordeland /Sogn og Fjordane| 24| Bjugn| 29
Hurum| 24| Osen| 29
Nore og Uvdal| 24| Roan| 29
Nore og Uvdal near Hordeland| 24| Åfjord| 29
Ål| 24| Frøya| 30
Ål near Sogn og Fj.| 24| Hitra| 30
Provincie Vestford| 23| Ørland| 30
Except Municipalities:| | Provincie Nord-Trøndelag| 26
Hof| 22| Except Municipalities:|
Lardal| 22| Lierne| 24
Nøtterøy| 24| Meråker| 25
Sandefjord| 24| Røyrvik| 25
Stokke| 24| Snåsa| 25
 Tønsberg| 24| Flatanger| 29
Larvik| 25| Fosnes| 29
Tjøme| 26| Leka| 29
Provincie Telemark| 22| Leka on the mainland| 29
Except Municipalities:| | Nӕrøy| 29
Bamble| 23| Vikna| 30
Porsgrunn| 23| Provincie Nordland| 29
Fyresdal| 24| Except Municipalities:|
Kragerø| 24| Beiarn| 26
Tinn| 24| Evenes| 26
Tokke| 24| Fauske| 26
Vinje| 24| Grane| 26
Vinje near Rogaland/Hordaland| 24| Hattfjelldal| 26
Provincie Aust-Agder| 24| Hemnes| 26
Except Municipalities:| | Rana| 26
Arendal| 26| Saltdal| 26
Grimstad| 26| Sørfold| 26
Lillesand| 26| Ballangen| 27
Risør| 26| Tjeldsund| 27
Tvedestrand| 26| Tysfjord| 27
Provincie Vest-Agder| 24| Hamarøy| 28
Except Municipalities:| | Narvik| 28
Flekkefjord| 26| Sortland| 28
Flekkefjord near Rogaland| 26| Vefsn| 28
Kristiansand| 26| Vefsn along the fjord| 28
Lyngdal| 26| Vefsn Mosjøen| 28
Søngne| 26| Vevelstad| 28
Farsund| 28| Alstahaug| 30
Lindesnes| 28| Bindal| 30
Mandal| 28| Bodø| 30
Provincie Rogaland| 26| Dønna| 30
Except Municipalities:| | Flakstad| 30
Hjelmeland| 24| Herøy| 30
Sauda| 24| Leirfjord| 30
Suldal| 24| Lurøy| 30
Vindafjord| 24| Lurøy on the mainland| 30
Eigersund| 27| Nesna| 30
Sokndal| 27| Sømna| 30
Bokn| 28| Vega| 30
Haugesund| 28| Vestvågøy| 30
Klepp| 28| Andøy| 31
Randaberg| 28| Moskenes| 31
Rennesøy| 28| Røst| 31
Sola| 28| Trӕna| 31
Time| 28| Vӕrøy| 31
Hå| 29| Skjerstad|  Municipality isn’t in the Wind standard
Kvitsøy| 29| Provincie Troms| 26
Karmøy| 30| Except Municipalities:|
Utsira| 30| Bardu| 24
Ølen| Municipality isn’t in the
Wind standard| Målselv| 24
Provincie Hordaland| 26| Strofjord| 24
Except Municipalities:| | Gáivuona/Kåfjord| 25
Etne| 24| Balsfjord| 26
Etne near the Folgefonna| 24| Gratangen| 26
Granvin| 24| Ibestad| 26
Kvam| 24| Lavangen| 26
Modalen| 24| Lyngen| 26
Samnanger| 24| Salangen| 26
Ulvik| 24| Skånland| 26
Vaksdal| 24| Sørreisa| 26
Voss| 24| Dyrøy| 27
Osterøy| 25| Harstad| 27
Radøy| 27| Lenvik| 27
Austevoll| 28| Nordreisa| 27
Austrheim| 28| Tranøy| 27
Bømlo| 28| Tromsø| 27
Fjell| 28| Bjarkøy| 28
Sund| 28| Kv ӕ    nangen| 28
Øygarden| 29| Skjervøy| 28
Fedje| 30| Karlsøy| 29
Provincie Sogn og Fjordane| 24| Berg| 30
Except Municipalities:| | Torsken| 30
Aurland| 25| Provincie Finnmark| 29
Eid| 26| Except Municipalities:|
Fjaler| 26| Kárájoga / Karasjok| 24
Førde| 26| Guovdageaidnu / Kautokeino| 24
Førde near the Jostedalsbreen| 26|  Deanu/Tana| 27
Gaular| 26| Porsanger| 27
Gloppen| 26| Unjárgga / Nesseby| 27
Gloppen near the Ålfotbreen and Jostedalsbreen| 26| Alta| 28
Hornindal| 26| Berlevåg| 30
Hyllestad| 26| Gamvik| 30
Høyanger| 26| Hasvik| 30
Lӕrdal| 26| Måsøy| 30
Naustdal| 26| Nordkapp| 30
| | Vardø| 30
| | Provincie Svalbard| 30

Sweden
General
The ValkBox3 mounting system must be ballasted by means of tiles, which must be placed on the indicated ballast foundations. In three steps you can easily determine the required ballast;

  • Find the correct wind area for your location on the wind map
  • Use the wind area in combination with the building height for the ballast table
  • Select the required ballast for G1 and G2 in kg and/or number of tiles

Note 1: Min. extra ballast in G1 & G2 has to be 2 x 1 tile (2 x 9 kg).
Note 2: The ballast in G1 & G2 must be equally divided over the rubber ballast carriers.
Note 3: At maximum 17 tiles (30x30x4.5 cm) can be placed on the tile carriers. 4 tiles in G1 and 13 (2×6.5) tiles in G2. This represents a ballast weight of 153 kg).

Environmental factors

Roof zone Middle zone
Terrain category III (villages, suburban terrain, permanent forest)
Roofing materials Bitumen, EPDM or concrete

Windmap SwedenVan der Valk Solar Systems ValkBox3 Standard Solar Ramp -
Windmap Sweden Panel: maximum dimensions 1800×1150 mm

Building height| 0 – 5 meter| 5 – 7 meter| 7 – 9 meter| 9 – 12 meter| 12 – 15 meter|
---|---|---|---|---|---|---
Wind area| G1| G2| G1| G2| G1| G2| G1| G2| G1| G2
22 m/s| 36| 29| 36| 37| 36| 44| 36| 51| 36| 57| kg
4| 3,5| 4| 4,5| 4| 5| 4| 6| 4| 6,5| tiles
23 m/s| 36| 34| 36| 43| 36| 49| 36| 58| 36| 64| kg
4| 4| 4| 5| 4| 5,5| 4| 6,5| 4| 7,5| tiles
24 m/s| 36| 39| 36| 48| 36| 56| 36| 64| 36| 72| kg
4| 4,5| 4| 5,5| 4| 6,5| 4| 7,5| 4| 8| tiles
25 m/s| 36| 44| 36| 54| 36| 62| 36| 72| 36| 79| kg
4| 5| 4| 6| 4| 7| 4| 8| 4| 9| tiles
26 m/s| 36| 49| 36| 60| 36| 69| 36| 79| 36| 87| kg
4| 5,5| 4| 7| 4| 8| 4| 9| 4| 10| tiles

Panel: maximum dimensions 2280×1150 mm

Building height| 0 – 5 meter| 5 – 7 meter| 7 – 9 meter| 9 – 12 meter| 12 – 15 meter|
---|---|---|---|---|---|---
Wind area| G1| G2| G1| G2| G1| G2| G1| G2| G1| G2
22 m/s| 36| 40| 36| 50| 36| 58| 36| 68| 36| 75| kg
4| 4,5| 4| 6| 4| 6,5| 4| 8| 4| 8,5| tiles
23 m/s| 36| 46| 36| 57| 36| 66| 36| 76| 36| 84| kg
4| 5,5| 4| 6,5| 4| 7,5| 4| 8,5| 4| 9,5| tiles
24 m/s| 36| 52| 36| 64| 36| 73| 36| 85| 36| 94| kg
4| 6| 4| 7,5| 4| 8,5| 4| 9,5| 4| 10,5| tiles
25 m/s| 36| 58| 36| 71| 36| 81| 36| 94| 36| 103| kg
4| 6,5| 4| 8| 4| 9| 4| 10,5| 4| 11,5| tiles
26 m/s| 36| 65| 36| 79| 36| 90| 36| 103| X| X| kg
4| 7,5| 4| 9| 4| 10| 4| 11,5| X| X| tiles

Finland
General

The ValkBox3 mounting system must be ballasted by means of tiles, which must be placed on the indicated ballast foundations. In three steps you can easily determine the required ballast;

  • Find the correct wind area for your location on the wind map
  • Use the wind area in combination with the building height for the ballast table
  • Select the required ballast for G1 and G2 in kg and/or number of tiles

Environmental factors

Roof zone Middle zone
Terrain category III (villages, suburban terrain, permanent forest)
Roofing materials Bitumen, EPDM or concrete

Windmap Finland![Van der Valk Solar Systems ValkBox3 Standard Solar Ramp

Panel: maximum dimensions 1800×1150 mm

Building height| 0 – 5 meter| 5 – 7 meter| 7 – 9 meter| 9 – 12 meter| 12 – 15 meter|
---|---|---|---|---|---|---
Wind area| G1| G2| G1| G2| G1| G2| G1| G2| G1| G2
21 m/s| 36| 40| 36| 50| 36| 57| 36| 66| 36| 73| kg
4| 4,5| 4| 6| 4| 6,5| 4| 7,5| 4| 8,5| tiles
22 m/s| 36| 46| 36| 57| 36| 65| 36| 74| 36| 82| kg
4| 5,5| 4| 6,5| 4| 7,5| 4| 8,5| 4| 9,5| tiles
26 m/s| 36| 72| 36| 87| 36| 98| X| X| X| X| kg
4| 8| 4| 10| 4| 11| X| X| X| X| tiles

Panel: maximum dimensions 2280×1150 mm

Building height| 0 – 5 meter| 5 – 7 meter| 7 – 9 meter| 9 – 12 meter| 12 – 15 meter|
---|---|---|---|---|---|---
Wind area| G1| G2| G1| G2| G1| G2| G1| G2| G1| G2
21 m/s| 36| 54| 36| 66| 36| 75| 36| 86| 36| 95| kg
4| 6| 4| 7,5| 4| 8,5| 4| 10| 4| 11| tiles
22 m/s| 36| 61| 36| 75| 36| 85| 36| 97| 36| 107| kg
4| 7| 4| 8,5| 4| 9,5| 4| 11| 4| 12| tiles
26 m/s| 36| 94| X| X| X| X| X| X| X| X| kg
4| 10,5| X| X| X| X| X| X| X| X| tiles

Poland
General
The ValkBox3 mounting system must be ballasted by means of tiles, which must be placed on the indicated ballast foundations. In three steps you can easily determine the required ballast;

  • Find the correct wind area for your location on the wind map
  • Use the wind area in combination with the building height for the ballast table
  • Select the required ballast for G1 and G2 in kg and/or number of tiles

Note 1: Min. extra ballast in G1 & G2 has to be 2 x 1 tile (2 x 9 kg).
Note 2: The ballast in G1 & G2 must be equally divided over the rubber ballast carriers.
Note 3: At maximum 17 tiles (30x30x4.5 cm) can be placed on the tile carriers. 4 tiles in G1 and 13 (2×6.5) tiles in G2. This represents a ballast weight of 153 kg).

Environmental factors

Roof zone Middle zone
Terrain category III (villages, suburban terrain, permanent forest)
Roofing materials Bitumen, EPDM or concrete

Windmap PolandVan der Valk Solar Systems ValkBox3 Standard Solar Ramp -
Windmap Poland Panel: maximum dimensions 1800×1150 mm

Building height| 0 – 5 meter| 5 – 7 meter| 7 – 9 meter| 9 – 12 meter| 12 – 15 meter|
---|---|---|---|---|---|---
Wind area| G1| G2| G1| G2| G1| G2| G1| G2| G1| G2
1| 36| 54| 36| 60| 36| 66| 36| 72| 36| 78| kg
4| 6| 4| 7| 4| 7,5| 4| 8| 4| 9| tiles
2| 36| 83| 36| 92| 36| 100| X| X| X| X| kg
4| 9,5| 4| 10,5| 4| 11,5| X| X| X| X| tiles
3| 36| 54| 36| 60| 36| 66| 36| 72| 36| 78| kg
4| 6| 4| 7| 4| 7,5| 4| 8| 4| 9| tiles

Panel: maximum dimensions 2280×1150 mm

Building height| 0 – 5 meter| 5 – 7 meter| 7 – 9 meter| 9 – 12 meter| 12 – 15 meter|
---|---|---|---|---|---|---
Wind area| G1| G2| G1| G2| G1| G2| G1| G2| G1| G2
1| 36| 71| 36| 79| 36| 86| 36| 95| 36| 102| kg
4| 8| 4| 9| 4| 10| 4| 11| 4| 11,5| tiles
2| 36| 108| X| X| X| X| X| X| X| X| kg
4| 12| X| X| X| X| X| X| X| X| tiles
3| 36| 71| 36| 79| 36| 86| 36| 95| 36| 102| kg
4| 8| 4| 9| 4| 10| 4| 11| 4| 11,5| tiles

Spain
General
The ValkBox3 mounting system must be ballasted by means of tiles, which must be placed on the indicated ballast foundations. In three steps you can easily determine the required ballast;

  • Find the correct wind area for your location on the wind map
  • Use the wind area in combination with the building height for the ballast table
  • Select the required ballast for G1 and G2 in kg and/or number of tiles

Note 1: The ballast in G1 & G2 must be equally divided over the rubber ballast carriers.
Note 2 Always check in advance if the required weight for ballast tiles can be placed correctly under the system. The tiles need to be placed in a stable position, so they can not move or fall off the rubber support feet.

Environmental factors

Roof zone Middle zone
Terrain category III (villages, suburban terrain, permanent forest)
Height above sea level < 1000 m
Roofing materials Bitumen, EPDM or concrete

Windmap SpainVan der Valk Solar Systems ValkBox3 Standard Solar Ramp -
Windmap Spain Panel: maximum dimensions 1800×1150 mm

Building height| 0 – 5 meter| 5 – 7 meter| 7 – 9 meter| 9 – 12 meter| 12 – 15 meter|
---|---|---|---|---|---|---
Wind zone| G1| G2| G1| G2| G1| G2| G1| G2| G1| G2
A (26 m/s)| 36| 66| 36| 79| 36| 90| 36| 102| 36| 112| kg
B (27 m/s)| 36| 72| 36| 87| 36| 98| 36| 112| 36| 125| kg
C (29 m/s)| 36| 86| 36| 103| 36| 116| 36| 137| 36| 153| kg

Panel: maximum dimensions 2280×1150 mm

Building height| 0 – 5 meter| 5 – 7 meter| 7 – 9 meter| 9 – 12 meter| 12 – 15 meter|
---|---|---|---|---|---|---
Wind zone| G1| G2| G1| G2| G1| G2| G1| G2| G1| G2
A (26 m/s)| 36| 86| 36| 103| 36| 117| 36| 134| 36| 151| kg
B (27 m/s)| 36| 95| 36| 113| 36| 128| 36| 150| 36| 168| kg
C (29 m/s)| 36| 113| 36| 136| 36| 158| 36| 183| 36| 204| kg

In case the space under the panel is insufficient for the size of the ballast tiles, the system needs to be mechanically fixed to the roof. Please contact Van der Valk Solar Systems for recommendations.

Portugal
General
The ValkBox3 mounting system must be ballasted by means of tiles, which must be placed on the indicated ballast foundations. In three steps you can easily determine the required ballast;

  • Find the correct wind area for your location on the wind map
  • Use the wind area in combination with the building height for the ballast table
  • Select the required ballast for G1 and G2 in kg and/or number of tiles

Note 1: Min. extra ballast in G1 & G2 has to be 2 x 1 tile (2 x 9 kg).
Note 2: The ballast in G1 & G2 must be equally divided over the rubber ballast carriers.
Note 3: At maximum 17 tiles (30x30x4.5 cm) can be placed on the tile carriers. 4 tiles in G1 and 13 (2×6.5) tiles in G2. This represents a ballast weight of 153 kg).

Environmental factors

Roof zone Middle zone
Terrain category III (villages, suburban terrain, permanent forest)
Height above sea level < 1000 m
Roofing materials Bitumen, EPDM or concrete

Windmap Portugal![Van der Valk Solar Systems ValkBox3 Standard Solar Ramp

Building height| 0 – 5 meter| 5 – 7 meter| 7 – 9 meter| 9 – 12 meter| 12 – 15 meter|
---|---|---|---|---|---|---
Wind zone| G1| G2| G1| G2| G1| G2| G1| G2| G1| G2
A (27 m/s)| 36| 72| 36| 72| 36| 72| 36| 72| 36| 72| kg
4| 8| 4| 8| 4| 8| 4| 8| 4| 8| tiles
B (30 m/s)| 36| 93| 36| 93| 36| 93| 36| 93| 36| 93| kg
4| 10,5| 4| 10,5| 4| 10,5| 4| 10,5| 4| 10,5| tiles

Panel: maximum dimensions 2280×1150 mm

Building height| 0 – 5 meter| 5 – 7 meter| 7 – 9 meter| 9 – 12 meter| 12 – 15 meter|
---|---|---|---|---|---|---
Wind zone| G1| G2| G1| G2| G1| G2| G1| G2| G1| G2
A (27 m/s)| 36| 94| 36| 94| 36| 94| 36| 94| 36| 94| kg
4| 10,5| 4| 10,5| 4| 10,5| 4| 10,5| 4| 10,5| tiles
B (30 m/s)| X| X| X| X| X| X| X| X| X| X| kg
X| X| X| X| X| X| X| X| X| X| tiles

X = the required ballast is higher than will fit under the system. The system must be mechanically attached to the roof. Please contact Van der Valk Solar Systems.
***** If you use tiles of different sizes and thus another weight, you need to adjust the number of tiles to get the right weight.

Components

Van der Valk Solar Systems ValkBox3 Standard Solar Ramp -
Components Step 1: Mounting the clevisVan der Valk Solar Systems ValkBox3 Standard Solar Ramp -
Mounting the clevis Step 2: Mounting the curved supports
The curved aluminum supports are suitable for panels with a width of 926 – 1150 mm.Van der Valk Solar Systems ValkBox3 Standard Solar Ramp - Mounting
the curved supportsDepending on the panel width, the clamps B1 and B2 must be positioned inwards or outwards. The correct orientation for each panel width is shown on the next page. Tighten the hinge bolts B1 by hand. These must be removed temporarily at step 4. Tighten the hinge bolts B2 firmly, with a tightening torque of at least 9 Nm, until there is no more play.

Option 1: Mounting panel
For panel width 926 – 990 mm
Center to center mounting holes (panel frame): 896 – 970 mmVan der Valk
Solar Systems ValkBox3 Standard Solar Ramp - Mounting
panel Option 2: Mounting panel
For panel width 991 – 1070 mm
Center to center mounting holes (panel frame): 970 – 1050 mmVan der Valk
Solar Systems ValkBox3 Standard Solar Ramp - Mounting panel
2 Option 3: Mounting panel
For panel width 1071 – 1150 mm
Center to center mounting holes (panel frame): 1050 – 1124 mm Step 3: Placing the rubber tiles
Turn over the panel and place it on the rubber tile carriers.Van der Valk
Solar Systems ValkBox3 Standard Solar Ramp - Placing the rubber
tiles The projections on the curved aluminium supports must be placed in the grooves on the rubber tiles.

Step 4: Position the ballast
Remove the top hinge bolts B1 and place the panel in a vertical position. Make sure that you have some form of support in place or someone to hold the panel temporarily.Van der Valk Solar Systems ValkBox3 Standard Solar Ramp -
Position the ballast Position the ballast required.

Step 5: Tighten hinge bolts B1
Attach the panel to the curved supports again and tighten hinge bolts B1. Tighten hinge bolts B1 tightly, with a tightening torque of at least 9 Nm, until there is no more play.
Step 6: Finish fitting the cables
The loose cables can be secured to the edge of the panel. Using the cable clamps supplied.Van der Valk Solar Systems ValkBox3 Standard Solar Ramp -
Finish fitting the cables Step 7: Position the rows one behind each other
If a number of rows of panels are to be positioned one behind the other, we advise that an optimal pitch measure of 2.20 metres is observed; this will avoid any unwanted shadow. Optimal performance will be achieved if this pitch measure is used. Based on sun angle of 15 degrees.Van der Valk Solar Systems
ValkBox3 Standard Solar Ramp - Position the rows

Van der Valk Solar Systems logo

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals