LUX POWER TEK LXP-LB-EU 8K Hybrid Inverter Instructions
- June 12, 2024
- LUX POWER TEK
Table of Contents
G100 Declaration of Conformance
LXP-LB-EU 8K Hybrid Inverter
Luxpowertek hereby confirms that LXP-LB-EU series hybrid inverter complies with the Engineering Recommendation G100, Technical Guidance for Customer Export Limiting Schemes, when installed in accordance with this Engineering G100 Declaration.
Details
Inverter
Type | LXP-LB-EU 8K ,LXP-LB-EU 9K,LXP-LB-EU 10K |
---|---|
Manufacturer | Shenzhen Lux Power Technology Co., Ltd |
Address | 5th Floor,Building 11, Phase III, Yangbei Industrial Zone, |
Huangtian Community,
Hangcheng Street, Baoan District, Shenzhen City,China
Meter & CT
Meter Type | SDM120-Modbus |
---|---|
Manufacturer | Jiaxing Eastron Electronic Instruments Co.,Ltd |
Address | No.1369 Chengnan Road, Jiaxing, Zhejiang, 314001, China |
CT Type | CTSA016-100A/100mA |
---|---|
Manufacturer | Yuanxing electronics Co.,LTD |
Address | Pioneering Park, Science & Technology Industry Zone, Zhangdian, |
Zibo, Shandong, PRC 255095
Test Address| 5th Floor,Building 11, Phase III, Yangbei Industrial Zone,
Huangtian Community,
Hangcheng Street, Baoan District, Shenzhen City,China
---|---
Telephone| +86 0755 8520 9056
Email| info@luxpowertek.com
Date| 2022/9/27
Signature| | On Behalf of| Shenzhen Lux Power
Technology Co., Ltd
Export Control Solution
System Connection with Meter
System Connection with CT
Hybrid inverter will not only provide power to the backup load connected but also give power to the home load connected. If PV power and battery power is insufficient, it will take grid energy as supplement. The hybrid inverter will not sell power to grid. The external CT(&Meter) will detect power flowing back to the grid and will reduce the power of the inverter only to supply the local load, charge battery and home load.This control is achieved by:
Meter or CT(Power Monitoring Unit)
- Measures power flowing in/out of the home and sends this data to inverter.
- Connected to the inverter via a communication cable
If the CT or the Meter fails, the RS485 communications would be lost and the inverters would permanently reduce to the site export limit which has been set.
Power Limit
Feed In grid : for zero export mode , it should be selected to stop export
power
Feed power(kW): Allowed the maximum output power to flow to grid.
Fast Zero-export : for zero-export mode, it should be selected to ensure the
hybrid inverter won’ t feed power to grid.
G100 requirement
The ELS must detect an excursion and reduce the export to the Agreed Export Capacity or less within 5 seconds.
- Under normal operating conditions, (enter product name) response time is less than 2s.
- Under loss of communications, or loss of power to Meter/Gateway, response time is less than 2s.
Password Protection
All settings are password protected and cannot be altered by the customer.
—- END —-
Shenzhen Lux Power Technology Co., Ltd
www.luxpowertek.com |
info@luxpowertek.com | +86 (0)755 8520 9056
References
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>