LAMBARIO LB09-01210 LED Bulkhead Light Instruction Manual
- June 12, 2024
- LAMBARIO
Table of Contents
LAMBARIO LB09-01210 LED Bulkhead Light Instruction Manual
Mounting Instruction
Instruction
-
Switch Off
-
Drill holes according to the installation position.
-
Open the junction box.
-
Connect the Wires.
-
Cover the junction box lock the screws.
-
Install the fixture on the wall.
-
Switch On.
Dimensions
WARNINGS
- Please read the user guide carefully before you install or use the product.
- Before installation, please read and follow the technical specification and symbols shown in the product box.
- Before installing, make sure that the electrical power is disconnected
- The product is not suitable for regulating circuit breaker
- The product is not suitable for covering with the rmo-insulating material
- Do not throw the product away from household waste. Please ask your municipality about how to use it.
- The product must be installed and maintained by qualified persons.
Suitable for a maximum use of 10-12 hours daily usage of the product, for
24hours per day would void the warranty
www.lambario.com
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>