Juniper NETWORKS QFX10002 Spine and Core Switches User Guide

June 12, 2024
JUNIPER NETWORKS

NETWORKS QFX10002 Spine and Core Switches
User GuideJuniper NETWORKS QFX10002 Spine and Core
Switches Quick Start
QFX10002

Step 1: Begin

IN THIS SECTION
Mount the QFX10002 | 2
Connect Power to the QFX10002 | 3
To install and configure any model of the Juniper Networks QFX10002 switch, you need:

  • Either an electric lift or two people to lift the switch into place. An additional person is needed for securing the switch to the rack.
  • Electrostatic discharge (ESD) grounding strap (not provided)
  • One pair of front mounting rails (provided)
  • One pair of rear mounting blades (provided)
  • 24 flat-head M4x6-mm Phillips mounting screws to secure the mounting rails to the chassis (provided)
  • 16 screws to secure the chassis and mounting blades to the rack (not provided)
  • Screwdriver appropriate for your rack mounting screws (not provided)
  • Two power cords with plugs for QFX10002-36Q, four power cords with plugs for QFX10002-60C and QFX10002-72Q that are appropriate for your geographical location (provided)
  • RJ-45 cable and RJ-45 to DB-9 serial port adapter (not provided)

NOTE: We no longer include a DB-9 to RJ-45 cable or a DB-9 to RJ-45 adapter with a CAT5E copper cable as part of the device package. If you require a console cable, you can order it separately with the part number JNP- CBL-RJ45-DB9 (DB-9 to RJ-45 adapter with a CAT5E copper cable).

  • Management host, such as a PC laptop, with a serial port (not provided)
  • (Optional) Grounding cable kit with bracket, lug, and three nuts with integrated washers

Mount the QFX10002
The QFX10002 can be mounted in a four-post 19-inch rack configuration.
To mount the switch:

  1. Attach the ESD grounding strap to your bare wrist and to a site ESD point.
    NOTE: If you are mounting multiple units in the rack, mount the heaviest unit at the bottom and mount the others from bottom to top in order of decreasing weight. The QFX10002-72Q weighs 68.6 lbs (31.1 kg), the QFX10002- 60C weighs 80.5 lbs (36.5 kgs), and the QFX10002-36Q weighs 54 lbs (24.5 kg). Installing the switch in a rack requires either a mechanical lift or two people to lift the device and another person to secure it to the rack.

  2. Place the rack in its permanent location, allowing adequate clearance for airflow and maintenance, and secure it to the building structure.

  3. Decide whether the field-replaceable unit (FRU) end of the switch or the port end is to be placed at the front of the rack. Position the switch in such a manner that the AIR OUT labels on components are next to the hot aisle.

  4. Using a Phillips screwdriver, remove the six screws on each side of the chassis that hold the cover to the chassis.Juniper NETWORKS QFX10002 Spine and Core Switches - Feager

  5. Align the holes in the mounting rail with the holes on the side of the chassis.

  6. Attach the mounting rail to the switch using 11 mounting screws. Tighten the screws.Juniper NETWORKS QFX10002 Spine and Core Switches - Feager1

  7. Repeat Step 5 and Step 6 on the opposite side of the device.

  8. Either use a mechanical lift or have two people grasp both sides of the switch, lift it, and position it in the rack so that the front bracket is aligned with the rack holes.

  9. Have a second person secure the front of the switch to the rack using eight mounting screws (and cage nuts and washers if your rack requires them.) Tighten the screws.

  10. Continue to support the switch while sliding the rear mounting-blades into the channel of the side mounting-rails and securing the blades to the rack. Use the eight mounting screws (and cage nuts and washers if your rack requires them) to attach each blade to the rack. Tighten the screws.Juniper NETWORKS QFX10002 Spine and Core Switches - Feager2

  11. Ensure that the switch chassis is level by verifying that all the screws on the front of the rack are aligned with the screws at the back of the rack.

  12. Attach a grounding cable to earth ground and then attach it to the chassis grounding points.

Connect Power to the QFX10002
To connect power to an AC-powered QFX10002 switch:

  1. If the AC power source outlet has a power switch, set it to the OFF (0) position.
  2. Insert the coupler end of the power cord into the AC power cord inlet on the AC power supply faceplate.
  3. Push the power cord retainer onto the power cord.
  4. Insert the power cord plug into the power source outlet.
  5. If the AC power source outlet has a power switch, set it to the ON (|) position.
  6. Verify that the AC and the DC LEDs are lit green and on steadily.

Step 2: Up and Running

Set Parameter Values
You must perform the initial configuration of the switch through the console port. Before you begin, set the following parameter values in the console server or PC:

  • Baud Rate—9600
  • Flow Control—None
  • Data—8
  • Parity—None
  • Stop Bits—1
  • DCD State—Disregard

Perform the Initial Configuration

To connect and configure the switch from the console:

  1. Connect the console port to a laptop or PC using an RJ-45 cable and RJ-45 to DB-9 adapter (not provided). The console (CON) port is located on the management panel of the switch.

  2. Log in as root. There is no password. If the software booted before you connected to the console port, you might need to press the Enter key for the prompt to appear.
    login: root

  3.  Start the CLI.
    root@% cli

  4. Enter configuration mode.
    root> configure

  5. Add a password to the root administration user account.
    [edit] root@# set system root-authentication plain-text-password
    New password: password
    Retype new password: password

  6. (Optional) Configure the name of the switch. If the name includes spaces, enclose the name in quotation marks (“ ”).
    [edit] root@# set system host-name host-name

  7. Configure the default gateway.
    [edit] root@# set routing-options static route default next-hop address

  8. Configure the IP address and prefix length for the switch management interface.
    [edit] root@# set interfaces em0 unit 0 family inet address address/prefix- length
    NOTE: The RJ-45 management port, em0, and SFP management port, em1, are found on the management panel of the QFX10002. They are both labeled MGMT.

  9. (Optional) Configure the static routes to remote prefixes with access to the management port.
    [edit] root@# set routing-options static route remote-prefix next-hop destination-ip retain no-readvertise

  10. Enable Telnet service.
    [edit] root@# set system services telnet

  11.  Commit the configuration to activate it on the switch.
    [edit] root@# commit

Step 3: Keep Going

Safety Warnings Summary
This is a summary of safety warnings. For a complete list of warnings, including translations, see the QFX10002 switch documentation at https://www.juniper.net/documentation/product/en_US/qfx10002.
WARNING: Failure to observe these safety warnings can result in personal injury or death.

  • Permit only trained and qualified personnel to install or replace device components.
  • Perform only the procedures described in this quick start and the QFX10002 switch documentation. Other services must be performed only by authorized service personnel.
  • Before installing the switch, read the planning instructions in the QFX10002 switch documentation to make sure that the site meets power, environmental, and clearance requirements for the switch.
  • Before connecting the switch to a power source, read the installation instructions in the QFX10002 switch documentation.
  • The QFX10002-72Q weighs 68.6 lbs (31.1 kg), the QFX10002-60C weighs 80.5 lbs (36.5 kegs), and the QFX10002-36Q weighs 54 lbs (24.5 kg). Installing the switch in a rack or cabinet requires either a mechanical lift or two people  to lift the device and another person to secure it to the rack. To prevent injury, keep your back straight and lift with your legs, not your back.
  • If the rack or cabinet has stabilizing devices, install them in the rack before mounting or servicing the switch in the rack or cabinet.
  • Before installing or after removing an electrical component, always place it component-side up on a flat antistatic mat or in an antistatic bag.
  • Do not work on the switch or connect or disconnect cables during electrical storms.
  • Before working on equipment that is connected to power lines, remove jewelry, including rings, necklaces, and watches. Metal objects heat up when connected to power and ground and can cause serious burns or become welded to the terminals.
    CAUTION: Do not place a copper transceiver in an access port directly above or below another copper transceiver. Damage to the access ports will occur.

Power Cable warning (Japanese)

The attached power cable is only for this product. Do not use this cable for another product.
Contacting Juniper Networks
For technical support, see:
http://www.juniper.net/support/requesting-support.html

Juniper Networks, the Juniper Networks logo, Juniper, and Junes are registered trademarks of Juniper Networks, Inc. in the United States and other countries. All other trademarks, service marks, registered marks, or registered service marks are the property of their respective owners. Juniper Networks assumes no responsibility for any inaccuracies in this document. Juniper Networks reserves the right to change, modify, transfer, or otherwise revise this publication  without notice.
Copyright © 2023 Juniper Networks, Inc.
All rights reserved.

Documents / Resources

| Juniper NETWORKS QFX10002 Spine and Core Switches [pdf] User Guide
QFX10002-72Q, QFX10002-60C, QFX10002-36Q, QFX10002, QFX10002 Spine and Core Switches, Spine and Core Switches, Core Switches, Switches
---|---

References

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

JUNIPER NETWORKS User Manuals

Related Manuals