Primacol Modern Stone Pattern Book Instructions

June 12, 2024
PRIMACOL

Instruction
Modern Stone

Modern Stone Pattern Book

Primacol Modern Stone Pattern Book - Symbol NOTE
Always test the product before use on the main surface. The effect obtained depends on many factors, such as substrate preparation, tools used, application technique. The manufacturer is not responsible for improper use of the product.
Tools should be washed frequently during work to avoid scratches on the decorated surface caused by the residue of the dried product.
It is recommended to decorate the surface with products from one production batch. Otherwise, the contents of all packages must be mixed together in one container.
The product should be stored in a tightly closed original container at 5 – 25 °C and out of the reach of children. Do not expose it to sunlight. Protect from freezing.

SUBSTRATE PREPARATION

The substrate should be clean, degreased, even, stable and uncracked. Fresh cement and lime-cement plasters should be seasoned for at least 4 weeks.
Paint the surface with Decobase paint. It will create a base coat similar to the effect’s colour, reduce the consumption of Modern Stone and ensure the best possible final result. When dry, sand the wall gently with fine sandpaper and dust it off afterwards.
Highly absorbent or not equally absorbent surfaces should be primed with a suitable primer before applying Decobase. We recommend our PRIMACOL® DECORATIVE primer.

APPLICATION

After opening the Modern Stone bucket, stir the contents thoroughly, preferably with a mechanical agitator at slow speed or alternatively by hand.
Start applying the paste from the top corner of the wall and move diagonally, extending the decorated surface.
Apply the product with a paint roller, spreading it in different directions.
Then smooth the entire surface with a wide spatula to give the decoration a pattern.
Work on an area of about 0.5 m² at a time. Join the decorated areas together by working “wet on wet”. The joints between each area will create an additional effect, so plan their placement carefully to obtain nice transitions.
Once the whole wall is finished, leave it to dry for about 12 hours.
After this time, using a wide spatula, gently cut away any protruding parts, then sand them with fine sandpaper and dust off the wall.
Apply a second layer in the same way as the first starting also from the top of the wall, but from the opposite corner.
Once the painting is complete, leave the wall to dry again for about 12 hours.
After this time, cut off the protruding parts, sand with fine sandpaper and dust off the wall. Then, carefully polish the surface with a clean spatula to create an effect of depth.
As the last step, protect the wall with PRIMACOL® DECORATIVE varnish by spreading it in different directions with a roller and leave it for at least 12 hours until completely dry.

Watch the instructional videohttp://filmy.unicell.pl/?link=primacol_modernstone
Share your project and inspire others!
@primacol_com | #modernstoneprimacol
primacol.com
shop@primacol.com

References

Read User Manual Online (PDF format)

Loading......

Download This Manual (PDF format)

Download this manual  >>

Related Manuals