EBECO 55235 TB Thermo Board User Manual

June 12, 2024
EBECO

EBECO 55235 TB Thermo Board User Manual

Manual Thermo Board

Thank you for choosing Ebeco. We wish you well when using your floor heating system. We hope that you will use it and enjoy it for many years to come. For the guarantee to be valid, the product must be installed and operated as indicated in this manual.
This means it is extremely important that you read the manual.
Complete information on installation of the Thermoflex Kit/ Cable Kit can be found in the manual that is supplied with each package. The Thermoflex Kit/Cable Kit must be installed and handled as outlined in the manual. If you have any questions, you are always more than welcome to contact Ebeco. Call +46 (0) 31 707 75 50 or send an e-mail to support@ebeco.se. Feel free to visit ebeco.com for more information.

Important

The Thermo Board can be used in both wet and dry areas on concrete and wooden subfloors. Wooden subfloors must consist of glued and screwed floor chipboards, and must
provide a stability that complies with applicable building and industry regulations.
The system is intended for installation in normal residential areas that are not exposed to extreme loads.

Recommended filler, adhesive and grout (Figure 1)

  1. Ebeco Primer + (8960550), Mapei Primer FR or
  2. Mapei Adesilex P4 (C2F) (8960184), Mapei Ultralite S2 Quick (C2FE/S2) or
  3. Mapei Uniplan Eco, Mapei Uniplan Eco TDR or similar self-levelling filler*.
  4. Laying the tiles: Mapei Adesilex P4 (C2F) (8960184), Mapei Ultralite S2 Quick (C2FE/S2), Mapei Keraflex (C2TE) or
  5. Grouting: Mapei Ultracolor Plus or similar (type CG2WA grout).

Please note the following before beginning

  • The floor must be clean, level and free from any of the
    old floor covering. Any hollows must be filled. The Thermo Boards must be completely in contact with the floor.

  • The Thermo Board must be laid over the entire floor area, even under fixed units where the heating cable is not to be

  • Lay the boards with staggered joints.

  • To split the Thermo Board; cut the back of the board using a sharp knife and break off the

  • The simplest way to plan how to lay the boards is to lay them out on the subfloor and cut them to size before fitting them in

  • Do not lay the boards on top of flexible

  • Plan the installation so that the cold cable splice and the end terminal are not laid in, or adjacent to, the shower

Installing the Ebeco Thermo Board

Plan how to lay the boards and follow the instructions in the “Please note the following before beginning” section.
Wet areas (Figure 2) Thermo Board boards are cut 10 mm from the edge of floor drains. The height of the floor drain must be adjusted, either by raising the drain or fitting
a suitable extension unit. Inclines are filled in after the Thermo Board and Cable Kit/Thermoflex Kit have been installed. If there is already an incline, cut the boards so that they follow the slope and are in complete contact with the subfloor.

(Figure 3) Cut out a channel for the flexible floor conduit connected to the sensor for the floor heating thermostat. Cut entirely through the board and at the same width as the conduit.

(Figure 4) Remove the boards. Prime the floor and allow it to dry. Apply the adhesive using an 8-10 mm serrated spreader.

(Figure 5) Lay out the insulation boards and press them in place in the adhesive fix. Lift carefully to check that the adhesion is sufficient. (Figure 6) Prime the boards.

(Figure 6) Prime the boards

Installing the Cable Kit  Filling and laying tiles

Thermoflex Kit Apply a filler to the floor. If the cable sticks up anywhere, insert a nail in the board at an angle over the cable to
Remember to measure and document readings while installing in accordance with heating cable/mat instructions.
(Figure 7) Place the flexible conduit in the cut-out channel. Push in the floor sensor.Install the Cable Kit/Thermoflex in accordance with heating cable/mat instructions.hold it down. Remove the nail when laying the tiles. Allow the filler to dry.
Apply new adhesive and lay the tiles in accordance with industry regulations.
Wet areas The space between the floor drain and the boards must be filled entirely with filler so that the floor drain and any extension unit are fully emerged in filler. Any inclines are then filled and a sealant is applied according to industry regulations. Then lay the tiles according to industry regulations

Read More About This Manual & Download PDF:

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals